EV Charger / EVSE Permit in Casa Grande, Arizona

Casa Grande has no standalone EV-charger/EVSE permit type or fee line item. Installing electric vehicle charging equipment (e.g., a dedicated 240V Level 2 circuit or panel/service work to support a charger) is electrical work, governed by the 2017 National Electrical Code (NEC) as adopted by the City, and is billed under the same flat 'Electrical, Mechanical, Plumbing Permit' consolidated fee category documented in this file's own electrical-permit entry -- not a distinct EV-charger line item. The City's FY 2025-2026 Consolidated Fee Schedule and Building Department page were checked directly and contain no EV-charger, EVSE, or electric-vehicle-specific fee or process, and no evidence was found that Casa Grande participates in SolarAPP+ (gosolarapp.org) or another instant/automated EV-charger permitting platform as of this review.

Verified 2026-07-20 · Source

When you need this permit

  • EV charger circuit installation is electrical work; apply at the Development Center, 510 E. Florence Blvd., using the standard Building/Electrical Permit Application
  • Governed by the 2017 NEC as adopted by the City of Casa Grande, including arc-fault and tamper-resistant outlet protection requirements at most locations
  • Billed under the flat consolidated 'Electrical, Mechanical, Plumbing Permit' fee category (no distinct EV-charger tier), same as any other single-trade electrical permit
  • Classified as a 'Single Trade (MPE Permit)' under the Miscellaneous category on the City's A.R.S. Section 9-835 review timeframe chart, same as general electrical permits

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical, Mechanical, Plumbing Permit — Residential (EV charger installation)City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, 'Electrical, Mechanical, Plumbing Permit' category -- no distinct EV-charger line item exists; billed as a flat single-trade electrical permit fee, same as documented in this file's electrical-permit entry
$75.00
Electrical, Mechanical, Plumbing Permit — Commercial (EV charger installation)City of Casa Grande FY 2025-2026 Consolidated Fee Schedule; applies for commercial/multi-unit EV charging station installations
$300.00
Gas and Electric Reconnect InspectionCity of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Inspection Charges; may apply if service reconnection is needed as part of the charger installation
$40.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Casa Grande building department
~2–24 business days

How long did your EV Charger / EVSE Permit permit actually take in Casa Grande?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    New circuit wiring, box placement, and panel connections before walls are closed, if applicable

  2. 2

    Final

    Charger unit installed, devices connected, protections verified per 2017 NEC

See the full Casa Grande inspection guide — scheduling & re-inspection fees →

Tips

  • There is no separate EV-charger fee category in Casa Grande -- an EV charger circuit is billed as the same flat $75 residential / $300 commercial consolidated Electrical, Mechanical, Plumbing Permit fee used for any single-trade electrical work.
  • Simple single-trade permits like an EV charger circuit are frequently issued much faster over the counter once completeness review clears (as fast as 2 business days), rather than taking the full 24-business-day maximum timeframe.
  • No SolarAPP+ or other automated instant-permitting platform was found for Casa Grande as of this review; do not assume an online instant-issue option exists for EV chargers here.

Frequently asked questions

Casa Grande requires an ev charger / evse permit for: EV charger circuit installation is electrical work; apply at the Development Center, 510 E. Florence Blvd., using the standard Building/Electrical Permit Application; Governed by the 2017 NEC as adopted by the City of Casa Grande, including arc-fault and tamper-resistant outlet protection requirements at most locations; Billed under the flat consolidated 'Electrical, Mechanical, Plumbing Permit' fee category (no distinct EV-charger tier), same as any other single-trade electrical permit; Classified as a 'Single Trade (MPE Permit)' under the Miscellaneous category on the City's A.R.S. Section 9-835 review timeframe chart, same as general electrical permits. If your project isn't listed, confirm with City of Casa Grande Planning & Development Department — Development Center (Building Division) at 520-421-8630 before starting work.

No. Casa Grande has no standalone EV-charger/EVSE permit type. An EV charger circuit is permitted as standard electrical work, billed under the same flat consolidated Electrical, Mechanical, Plumbing Permit fee ($75 residential / $300 commercial) used for any single-trade electrical permit.

Plan review for an ev charger / evse permit in Casa Grande typically runs 2–24 business days. This is an estimate, not a published figure — confirm current review times with City of Casa Grande Planning & Development Department — Development Center (Building Division) at 520-421-8630.

You'll need: Building/Electrical Permit Application. See the required-documents checklist on this page for details on each.

Casa Grande requires 2 inspection(s) for an ev charger / evse permit, in order: Rough-In, Final. Schedule each through City of Casa Grande Planning & Development Department — Development Center (Building Division) (520-421-8630).

Apply through City of Casa Grande Planning & Development Department — Development Center (Building Division) at 510 E. Florence Boulevard, Casa Grande, AZ 85122. Phone: 520-421-8630, email: cgplanning@casagrandeaz.gov. Office hours: Monday - Friday, 7:30 a.m. - 5 p.m. The Development Center is a 'one-stop shop' for building, engineering, fire, and planning plan review/permits/inspections. Building inspections are scheduled online through the WebPermits portal (rogue.casagrandeaz.gov/WebPermits); the City does not offer same-day inspections unless the request is received by 11:59 p.m. the prior business day, and inspectors run routes between 6 a.m. and 3:30 p.m.. Official information: https://casagrandeaz.gov/231/Building.

Casa Grande, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9). The City of Casa Grande runs its own Planning & Development Department / Development Center and independently adopts and administers its own construction codes under Title 15 (Buildings and Construction) of the Casa Grande Code of Ordinances; it does not defer permitting to Pinal County. Source: City of Casa Grande Building page (casagrandeaz.gov/231/Building) and Casa Grande Code of Ordinances Title 15.; 2018 International Building Code (IBC), adopted by reference with City of Casa Grande amendments (Casa Grande Code of Ordinances § 15.08.010), made a public record by Resolution No. 5170. Source: City of Casa Grande Quick Codes Design Criteria Handout (Building Department, rev. 11/8/2024) and Casa Grande Code of Ordinances § 15.08.010, International Building Code.; 2018 International Residential Code (IRC), adopted by reference with City of Casa Grande amendments under Title 15. Climatic and geographic design criteria (IRC Table R301.2(1)) are published separately by the Building Department. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).; 2018 International Mechanical Code (IMC), adopted by reference with City of Casa Grande amendments under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).; 2018 International Plumbing Code (IPC), adopted by reference with City of Casa Grande amendments under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).; 2018 International Fuel Gas Code (IFGC), adopted by reference with City of Casa Grande amendments under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).; 2018 International Fire Code (IFC), adopted by reference as the City's uniform fire code under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).; 2018 International Energy Conservation Code (IECC) governs residential and commercial energy-efficiency requirements. Residential energy efficiency design minimums published by the Building Department include: new/replacement HVAC sized per ACCA Manual J & S (gas furnaces/boilers 80% AFUE minimum; air conditioners and heat pumps 14 SEER minimum); duct insulation per ACCA Manual D (R-8 within attics/exterior, R-6 within other portions); common insulation values of R-13 walls, R-38 ceilings, U-0.40 windows, R-0 crawlspace/slab-on-grade, R-3 water/refrigerant lines. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).; 2018 International Property Maintenance Code (IPMC), adopted by reference under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).; 2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).; 2017 National Electrical Code (NEC/NFPA 70), adopted by reference with City of Casa Grande amendments (note: electrical code cycle is one edition behind the 2018 ICC set). Arc-fault and tamper-resistant outlet protection is required at most locations per the 2017 NEC. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).; NFPA 99 Standards for Health Care Facilities, adopted by reference under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).; 2009 ICC A117.1 Accessible and Usable Buildings and Facilities, adopted by reference under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).; 2019 City of Casa Grande Building and Technical Administrative Code (CG-BTAC), made a public record by Resolution No. 5170, with a 2022 Amendment made a public record by Resolution No. 5397. This locally-authored administrative code governs permit administration, fees cross-references, and technical amendments layered on top of the adopted ICC model codes. Source: City of Casa Grande Building and Technical Administrative Code, 2019 Edition (casagrandeaz.gov/DocumentCenter, Resolution 5170) and Casa Grande Code of Ordinances § 15.04.010.. Local amendments apply — see the Casa Grande overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Casa Grande building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.