Skip to main content
PermitBase

This is PermitBase’s published record for Florence as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Florence building permits

Verified

Florence, Arizona — as published 2026-07-20.

Verified 2026-07-06 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9). The Town of Florence Town Council adopted its own Technical Codes by reference (Town of Florence Code of Ordinances § 150.300, Exhibit A) and independently administers permitting through its Community Development Department / Building Safety Division; it does not defer to Pinal County for permitting within town limits. Source: Town of Florence Code of Ordinances, Technical Codes, Exhibit A (Adopted Building Codes Amendments PDF).2018 International Building Code (IBC), including Appendices B, C, and I, adopted by reference (§ 150.300(A)(1)), with Town of Florence amendments. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A), effective per Town Council adoption (document created/effective 2022, current as of this review — no 2024 IBC/ICC-cycle adoption found in effect as of 2026-07-06).2018 International Residential Code (IRC), including Appendices G, H, and P (with Appendices E, H, J, P, and Q separately confirmed adopted at § R102.5 amendment), adopted by reference (§ 150.300(A)(2)), with Town of Florence amendments including amended Climatic and Geographic Design Criteria and a mandatory-cooling requirement. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).2018 International Mechanical Code (IMC), adopted by reference (§ 150.300(A)(3)), with Town of Florence amendments (guards exception and mandatory cooling-system amendment for 1- and 2-family dwellings). Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).International Plumbing Code adopted by reference (§ 150.300(A)(4)); the Town's own codified adoption list states '2018 Edition' at the top-level adoption clause, but the itemized amendment section of the same official document (item 10) separately lists a '2012 Edition' with two specific section amendments (§ 410.3 Substitution; § 903.1 Roof extension) — this is an inconsistency within the Town's own published Exhibit A document, reproduced here verbatim rather than resolved by assumption. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A), §150.300(A)(4) and item 10.2018 International Fuel Gas Code (IFGC), adopted by reference (§ 150.300(A)(5)), with Town of Florence amendments (LPG appliance location restriction, minimum burial depth, test-pressure measurement procedure). Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).2018 International Energy Conservation Code (IECC), adopted by reference (§ 150.300(A)(6)); the Town amended the code by deleting the entire Residential Section and Chapter 11 Energy Efficiency of the 2018 IRC. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).2018 International Existing Building Code (IEBC), adopted by reference (§ 150.300(A)(7)) in its entirety without revision. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).2018 International Swimming Pool and Spa Code, adopted by reference (§ 150.300(A)(8)) in its entirety without revision. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).2018 International Fire Code (IFC), including Appendices B, C, D, E, F, G, and I, adopted by reference (§ 150.300(A)(9)) as the Town's uniform fire code, with extensive Town of Florence amendments (definitions, fire apparatus access roads, fire flow/water supply, alarm/suppression system requirements, open burning). Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).International Property Maintenance Code, 2018 Edition, adopted by reference (§ 150.300(A)(10)) in its entirety without revision. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).National Electrical Code (NEC) — the Town's top-level codified adoption clause (§ 150.300(A)(11)) states '2017 Edition,' but the itemized amendment section of the same official document (item 17) separately states 'National Electrical Code, 2018 Edition' when adding a new performance-testing subsection (Article 230.11) for 1,000-amp-or-larger service equipment. This is an inconsistency within the Town's own published document, reproduced here verbatim rather than resolved by assumption; both editions are cited directly from the Town's Adopted Building Codes Amendments (Exhibit A) as published.ICC A117.1 Accessible and Usable Buildings and Facilities Code, 2010 Edition Standards, adopted by reference (§ 150.300(A)(12)) in its entirety without revision. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).Manufactured homes and park models are regulated directly by the State of Arizona (Office of Manufactured Housing, A.R.S. § 41-4001 et seq.) for construction/installation standards; the Town issues a separate Manufactured Home Set permit ($450, per the most current Office of Manufactured Housing Intergovernmental Agreement) and a Park Model Placement permit ($450) for on-site placement. Source: Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2.

Permit types & fees

Residential Building Permit (New Construction — SFR)

Verified

Required for new single-family residential (SFR) construction in the Town of Florence, reviewed against the 2018 IRC and Town of Florence amendments. The Town's Building Permit Application distinguishes 'New Build / SFR - Standard Plan' from 'New Build / SFR - Non-Standard Plan' and 'New Build / MFR (Multi-Family Residential).' Applications are submitted via the SmartGov online Residential Permitting Portal or in person/email for commercial-track submittals.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for new single-family and multi-family residential construction within Florence town limits
  • Plans must comply with the 2018 IRC and Town of Florence amendments, including Climatic and Geographic Design Criteria (115 mph wind, Exposure C; Seismic Design Category B; 32°F winter design temperature; moderate-to-heavy termite potential; mandatory cooling to 80°F max)
  • Termite pretreatment certification required for slab foundations (licensed applicator, Arizona Pest Control Commission rules)
  • Submittal via the SmartGov Residential Permitting Portal (twn-florence-az.smartgovcommunity.com) using an applicant/company or homeowner access code, or by email to TOFPermits@FlorenceAZ.gov for commercial submittals
  • Required attachments: Permit Application, Inspector Rights and Responsibilities acknowledgment, Owner Authorization Form or Owner Builder Affidavit, Licensed Contractor Written Estimate, Site Plan (property lines, setbacks, structures, streets, north arrow, utilities), Construction/Building Plans — combined into a single PDF
  • Plan review fee must be paid in full before review commences

Required documents

  • RequiredBuilding Permit ApplicationTown of Florence Community Development Department Building Permit Application (Rev 9.11.25), submitted via the SmartGov portal or in person
  • RequiredOwner Authorization Form / Owner Builder AffidavitRequired unless the applicant is the licensed contractor of record
  • RequiredLicensed Contractor Written EstimateRequired submittal attachment per the Town's Building Permit Application packet
  • RequiredSite PlanProperty lines, setbacks/distance from property line to existing structures, all structures on the property, streets, north direction, and location of all utilities
  • RequiredConstruction / Building PlansFull construction drawing set, combined into a single PDF with the application per submittal requirements

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation (Table 1-A)$50 (valuation $1-$500); $50 for the first $500 plus $5 per additional $100 or fraction thereof to $2,000; $125 for the first $2,000 plus $18.35 per additional $1,000 or fraction thereof to $25,000; $547 for the first $25,000 plus $13.33 per additional $1,000 to $50,000; $880 for the first $50,000 plus $12.17 per additional $1,000 to $100,000; $1,489 for the first $100,000 plus $8.03 per additional $1,000 to $500,000; $4,699 for the first $500,000 plus $7.26 per additional $1,000 to $1,000,000; $8,329 for the first $1,000,000 plus $5 per additional $1,000 thereafterTown of Florence Fee Schedule (Revision 01/15/2025), Section 2, Total Valuation table (verified by direct visual read of the fee schedule PDF page 8/Section 2 continuation)
Plan Review Fee (BOV permits)65% of the calculated Building/Permit FeeTown of Florence Fee Schedule (Rev. 01/15/2025), Section 2; due in full at time of submittal for all BOV permits
Certificate of Occupancy, Residential and Commercial, per Residence or Building$75.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Occupancy Permit Fees
Additional Plan Review (changes/additions to plans, 1/2-hour rate)Actual CostTown of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Administrative Fees

Residential Addition / Remodel / Accessory Structure Permit

Verified

Required for room additions, non-cosmetic remodels, and residential accessory structures (over the 200 sq ft/10 ft wall-height permit-exempt threshold) in Florence, reviewed against the 2018 IRC as adopted and amended by the Town.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for additions, non-cosmetic remodels, and accessory structures exceeding 200 sq ft floor area / 10 ft wall height (the Town's permit-exempt threshold)
  • Purely cosmetic finish work (painting, papering, tiling, carpeting, cabinets, countertops) does not require a permit
  • Building Permit Application lists 'Remodel' and 'Accessory (detached)'/'Addition (attached)' as distinct permit-type checkboxes
  • Plans must comply with Town of Florence Design Criteria (115 mph wind, Exposure C; Seismic Design Category B; mandatory 80°F max cooling)
  • Residential Accessory Structure plan review fee is a flat $200 rather than percentage-of-valuation

Required documents

  • RequiredBuilding Permit ApplicationTown of Florence Building Permit Application (Rev 9.11.25) with 'Remodel' or 'Addition (attached)'/'Accessory (detached)' checked, submitted via SmartGov portal or email
  • RequiredSite PlanShowing existing structure, addition/accessory-structure footprint, and setbacks
  • RequiredOwner Authorization Form / Owner Builder AffidavitRequired unless applicant is the licensed contractor

Fee schedule

Fee typeAmountNotes
Residential Accessory Structure (Plan Review)$200.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Plan Review Fee table
Commercial Accessory Structure (Plan Review)BOV (Based on Valuation, Table 1-A)Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2
Remodel / Addition — Building Permit FeeBased on Valuation (Table 1-A) — see Residential Building Permit fee table for the valuation chartTown of Florence Fee Schedule (Rev. 01/15/2025), Section 2; plan review fee is 65% of the calculated Permit Fee for BOV permits
Permit Revision Fee — Residential$75.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Administrative Fees

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in Florence, using the Town's combined MPEW (Mechanical/Plumbing/Electrical/Walls-fences) and Inspection Permit Application. Governed by the National Electrical Code as adopted by the Town (the Town's own published Exhibit A document states both 2017 (§ 150.300 top-level clause) and 2018 (item 17 amendment) editions — see codesAdopted note).

Verified 2026-07-06 · Source

Requirements

  • Electrical permit required for new electrical wiring, service changes, panel work, and utility clearances (Electrical or Gas)
  • Applied for on the combined MPEW / Inspection Permit Application (Rev 9.11.25), selecting 'Electrical' as Permit Type
  • All service entry equipment and associated equipment rated 1,000 amps or more must be performance (high-potential) tested when first installed, with a written test record submitted to the Town (NEC Article 230.11, Town of Florence amendment)
  • Utility Clearance permits (Electrical or Gas) are processed as Right-of-Way Non-Utility miscellaneous items — over-the-counter with no formal plan review when submitted complete
  • Apply via the SmartGov Residential Permitting Portal or email TOFPermits@FlorenceAZ.gov for commercial

Required documents

  • RequiredMPEW / Inspection Permit ApplicationTown of Florence Mechanical, Plumbing, Electrical, Walls/Fences and Inspection Permit Application (Rev 9.11.25), with 'Electrical' selected as Permit Type
  • RequiredSite PlanProperty lines, setbacks, structures, streets, north direction, and location of all utilities
  • RequiredOwner Authorization Form / Owner Builder AffidavitRequired unless applicant is the licensed contractor

Fee schedule

Fee typeAmountNotes
Utility Permit — Electrical, Mechanical, HVAC, Plumbing, Gas, etc. (Residential)$75.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Utility Permit Fees
Utility Permit — Electrical, Mechanical, HVAC, Plumbing, Gas, etc. (Commercial)$300.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Utility Permit Fees

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in Florence, using the Town's combined MPEW Permit Application. The Town's own published code-adoption document shows an internal inconsistency on IPC edition (see codesAdopted note): the top-level adoption clause states 2018 IPC while the itemized amendment section separately references a 2012-edition section numbering for two specific amendments.

Verified 2026-07-06 · Source

Requirements

  • Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and some gas piping
  • Applied for on the combined MPEW / Inspection Permit Application (Rev 9.11.25), selecting 'Plumbing' as Permit Type
  • Water heater pan required in attic/furred-space installations where leakage could cause damage (galvanized steel, min. 0.0236 in / No. 24 gage, or listed equivalent per CSA LC3) — Town amendment to § P2801.5
  • Sewer depth minimum 12 inches — Town amendment to § P2603.5.1
  • Some gas lines are processed as Right-of-Way Non-Utility miscellaneous items (over-the-counter, no formal review) per the Town's review timeline chart

Required documents

  • RequiredMPEW / Inspection Permit ApplicationTown of Florence Mechanical, Plumbing, Electrical, Walls/Fences and Inspection Permit Application (Rev 9.11.25), with 'Plumbing' selected as Permit Type
  • RequiredOwner Authorization Form / Owner Builder AffidavitRequired unless applicant is the licensed contractor

Fee schedule

Fee typeAmountNotes
Utility Permit — Electrical, Mechanical, HVAC, Plumbing, Gas, etc. (Residential)$75.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Utility Permit Fees
Utility Permit — Electrical, Mechanical, HVAC, Plumbing, Gas, etc. (Commercial)$300.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Utility Permit Fees

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations in Florence, governed by the 2018 International Mechanical Code (IMC) as adopted and amended by the Town of Florence. Because the Town mandates cooling capable of 80°F max (IMC § 309.1 amendment), AC/HVAC permits are a common permit type using the combined MPEW Permit Application.

Verified 2026-07-06 · Source

Requirements

  • Mechanical permit required for installation, replacement, or relocation of HVAC equipment, furnaces, and ventilation systems
  • Governed by the 2018 IMC as adopted by the Town of Florence
  • Every dwelling unit and guest room must be provided with cooling capable of maintaining 80°F max at 3 ft above the floor (IMC § 309.1 Town amendment; parallels IRC § R303.10 'Required Heating and Cooling')
  • Applied for on the combined MPEW / Inspection Permit Application (Rev 9.11.25), selecting 'Mechanical' as Permit Type
  • Guard requirement (IMC § 304.11) does not apply to 1- and 2-family dwellings per Town amendment

Required documents

  • RequiredMPEW / Inspection Permit ApplicationTown of Florence Mechanical, Plumbing, Electrical, Walls/Fences and Inspection Permit Application (Rev 9.11.25), with 'Mechanical' selected as Permit Type
  • RequiredOwner Authorization Form / Owner Builder AffidavitRequired unless applicant is the licensed contractor

Fee schedule

Fee typeAmountNotes
Utility Permit — Electrical, Mechanical, HVAC, Plumbing, Gas, etc. (Residential)$75.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Utility Permit Fees
Utility Permit — Electrical, Mechanical, HVAC, Plumbing, Gas, etc. (Commercial)$300.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Utility Permit Fees

Re-Roofing Permit

Verified

Required for most re-roofing work in Florence, using the Town's Building Permit Application ('Roofing' checkbox under Commercial; residential re-roofs are also permitted). Governed by the 2018 IBC/IRC roofing provisions as adopted and amended by the Town.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for most re-roofing per the Town's own public guidance ('most re-roofing' is listed among work types typically requiring a permit)
  • Building Permit Application includes 'Roof' and 'Roofing' as selectable permit types
  • Re-roofing is classified as a Right-of-Way Non-Utility item on the Town's Submittal Review Timelines chart alongside Certificate of Occupancy inspections and utility clearances
  • Owner Authorization Form or Owner Builder Affidavit required if applicable

Required documents

  • RequiredBuilding Permit ApplicationTown of Florence Building Permit Application (Rev 9.11.25) with 'Roof'/'Roofing' selected
  • RequiredLicensed Contractor Written EstimateRequired submittal attachment per the Town's Building Permit Application packet

Fee schedule

Fee typeAmountNotes
Re-Roofing — Based on Valuation (Table 1-A)Based on Valuation — see Residential Building Permit fee table for the full valuation chartTown of Florence Fee Schedule (Rev. 01/15/2025), Section 2; no separately itemized flat re-roof fee line was found — re-roofing is billed via the standard BOV Building Permit Fee / Table 1-A valuation chart

Residential Solar Photovoltaic (PV) System Permit

Verified

Required for installation of rooftop or ground-mount residential solar photovoltaic systems in Florence. Governed by the Town's dedicated Photovoltaic-PV System (Solar) Installation Application (Rev 9.11.25) and the statewide solar-permitting standards of A.R.S. § 9-468, which caps required documentation and fees and restricts engineering-stamp requirements for residential PV.

Verified 2026-07-06 · Source

Requirements

  • Photovoltaic-PV System (Solar) Installation Application must specify system size (KW), roof-mount or ground-mount, and utility company
  • Per A.R.S. § 9-468: location of the PV installation must be shown on construction plans (roof plan and elevation); panel mounting details required; one-line or three-line electrical diagram required (waivable via a qualified online automated permitting platform); DC-to-AC inverter cut sheets and listings required; the Town may not require a professional engineer's stamp for a residential PV system unless deemed necessary, and must provide written justification if it does
  • Solar Plan Review fee is a flat $400 per the current Fee Schedule (distinct from the general utility permit fee)
  • Apply via the SmartGov Residential Permitting Portal (residential) or email TOFPermits@FlorenceAZ.gov (commercial)
  • Required attachments: Permit Application, Inspector Rights and Responsibilities, Owner Authorization Form/Owner Builder Affidavit, Licensed Contractor Written Estimate, Site Plan, Construction/Building Plans — combined into one PDF

Required documents

  • RequiredPhotovoltaic-PV System (Solar) Installation ApplicationTown of Florence Community Development Department Building Safety Division application (Rev 9.11.25), specifying KW size, roof/ground mount, and utility company
  • RequiredConstruction Plans (roof plan, elevation, mounting details, electrical diagram)Per A.R.S. § 9-468 statutory content requirements
  • RequiredInverter Cut Sheets and ListingsRequired for DC-to-AC conversion equipment per A.R.S. § 9-468

Fee schedule

Fee typeAmountNotes
Solar Plan Review$400.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Utility Permit Fees (verified by direct visual read of the fee schedule PDF, Section 2 continuation page)

Demolition Permit

Verified

Required for demolition of any residential or commercial structure in Florence. Uses the Building Permit Application ('Demolition' checkbox) with distinct flat fees for residential versus commercial demolitions.

Verified 2026-07-06 · Source

Requirements

  • Building permit required before demolishing a residential or commercial structure within Florence town limits
  • Building Permit Application 'Demolition' checkbox selected under the Residential permit-type section
  • Owner Authorization Form or Owner Builder Affidavit required
  • Site Plan required showing the building to be demolished and other existing structures

Required documents

  • RequiredBuilding Permit ApplicationTown of Florence Building Permit Application (Rev 9.11.25) with 'Demolition' selected
  • RequiredOwner Authorization Form / Owner Builder AffidavitRequired for demolition permit submittal
  • RequiredSite PlanProperty lines, easements, and location of the building to be demolished plus other existing structures

Fee schedule

Fee typeAmountNotes
Building Demolitions Permit — Residential$100.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Miscellaneous (verified by direct visual read of the fee schedule PDF)
Building Demolitions Permit — Commercial$200.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Miscellaneous

Manufactured Home / Park Model Placement Permit

Verified

Required for placement (set) of a manufactured home or park model on a lot in Florence, using the Town's dedicated Manufactured Home Permit Application. Construction/installation standards for the unit itself are regulated by the State of Arizona Office of Manufactured Housing; the Town's permit covers on-site placement, foundation/tie-down, and site compliance.

Verified 2026-07-06 · Source

Requirements

  • Manufactured Home Permit Application (Rev 9.11.25) required for placement of a manufactured home
  • Manufactured home construction/installation standards are set by the State of Arizona Office of Manufactured Housing (A.R.S. § 41-4001 et seq.); the Town's permit fee follows the most current Office of Manufactured Housing Intergovernmental Agreement
  • Park Model Placement is a distinct permit category from a full Manufactured Home Set
  • Legal non-conforming RV parks with privately owned lots (existing at code adoption) have specific reduced fire-separation-distance allowances for replacement/new Park Model dwelling units per IRC § R302.1 exceptions

Required documents

  • RequiredManufactured Home Permit ApplicationTown of Florence Community Development Department application (Rev 9.11.25) for manufactured home placement
  • RequiredSite PlanLot dimensions, setbacks, and placement location
  • RequiredOwner Authorization Form / Owner Builder AffidavitRequired unless applicant is the licensed contractor/installer

Fee schedule

Fee typeAmountNotes
Manufactured Home Set (per most current Office of Manufactured Housing Intergovernmental Agreement)$450.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Miscellaneous (verified by direct visual read of the fee schedule PDF)
Park Model Placement$450.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Miscellaneous

Swimming Pool / Spa Permit

Verified

Required for in-ground and above-ground swimming pools and spas in Florence, governed by the 2018 International Swimming Pool and Spa Code as adopted by the Town (in its entirety, without revision).

Verified 2026-07-06 · Source

Requirements

  • Permanent pools require a building permit per the Town's own public guidance
  • Governed by the 2018 International Swimming Pool and Spa Code, adopted in its entirety without Town revision
  • In-ground/standard pools carry a flat Swimming Pool Standard Plan Review fee; above-ground pools/spas are billed Based on Valuation (Table 1-A)
  • Pool barrier and safety requirements apply per the adopted code

Required documents

  • RequiredBuilding Permit ApplicationTown of Florence Building Permit Application (Rev 9.11.25) for pool/spa scope
  • RequiredSite PlanPool location, setbacks, and barrier/fencing plan

Fee schedule

Fee typeAmountNotes
Swimming Pool Standard Plan Review$450.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Miscellaneous (verified by direct visual read of the fee schedule PDF)
Above-Ground Pool or SpaBOV (Based on Valuation, Table 1-A)Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Miscellaneous
Utility Permit — PoolBOV (Based on Valuation, Table 1-A)Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Utility Permit Fees

EV Charger / Electric Vehicle Charging Station Permit

Verified

Florence has no dedicated EV charger permit — installation of an electric vehicle charging station (Level 1/2 EVSE) is electrical work and is processed under the same combined MPEW (Mechanical/Plumbing/Electrical/Walls-fences) and Inspection Permit Application used for the electrical-permit entry, billed at the Town's flat Utility Permit fee (Electrical category). No distinct EV-specific fee line was found in the Town's Fee Schedule. Re-chased 2026-07-20: directly downloaded and text-extracted the live Fee Schedule PDF, confirming the $75.00 residential / $300.00 commercial Utility Permit (Electrical) fee figures are still current.

Verified 2026-07-20 · Source

Requirements

  • Electrical permit required for the EV charger circuit installation (new wiring, dedicated circuit, or panel/service work), same as any other electrical work
  • Applied for on the combined MPEW / Inspection Permit Application (Rev 9.11.25), selecting 'Electrical' as Permit Type
  • Governed by the National Electrical Code as adopted by the Town (see electrical-permit entry for edition-year notes)
  • Apply via the SmartGov Residential Permitting Portal or email TOFPermits@FlorenceAZ.gov for commercial
  • Arizona's statewide solar/PV statute (A.R.S. § 9-468) does not itself address EV charger permitting specifically, but Florence's general electrical permit fee-caps and process apply the same way to EV circuits as to any other electrical scope

Required documents

  • RequiredMPEW / Inspection Permit ApplicationTown of Florence Mechanical, Plumbing, Electrical, Walls/Fences and Inspection Permit Application (Rev 9.11.25), with 'Electrical' selected as Permit Type — same form used for EV charger circuit work
  • RequiredSite PlanProperty lines, setbacks, structures, streets, north direction, and location of all utilities
  • RequiredOwner Authorization Form / Owner Builder AffidavitRequired unless applicant is the licensed contractor

Fee schedule

Fee typeAmountNotes
Utility Permit — Electrical (applies to EV charger circuit; no distinct EV line), Residential$75.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Utility Permit Fees — same flat fee documented on the electrical-permit entry Re-confirmed live 2026-07-20 via direct PDF text extraction.
Utility Permit — Electrical (applies to EV charger circuit; no distinct EV line), Commercial$300.00Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Utility Permit Fees Re-confirmed live 2026-07-20 via direct PDF text extraction.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Florence building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-23) →View current record →All versions →

Permalink: /arizona/pinal-county/florence-az/as-of/2026-07-20/

Snapshot date: 2026-07-20

Commit: ec3fe20

Reproducible from PermitBase’s version-controlled dataset, commit ec3fe20.