Camp Verde building permits
VerifiedCamp Verde, Arizona — as published 2026-08-16.
Verified 2026-08-16 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Single-Family Home)
VerifiedRequired for new one- and two-family dwelling construction in the Town of Camp Verde. Reviewed against the 2024 IRC as adopted and amended by the Town via Ordinance 2026-A512 (effective February 26, 2026). Applications are submitted through the GovWell One-Stop Permitting Portal.
Verified 2026-08-16 · Source
Requirements
- Building permit required for new single-family and two-family dwelling construction within Camp Verde town limits, following a required Residential Zoning Clearance ($190, includes manufactured/factory-built/modular homes)
- Plans must comply with the 2024 IRC and Town of Camp Verde amendments, including the reduced 100 mph wind-speed design criteria (Risk Category I) adopted under Ordinance 2026-A512
- Valuation for new single/multi-family residences (excluding mobile/manufactured homes) is the applicant's valuation or the ICC Building Valuation Data (BVD) Table figure, whichever is greater
- A deposit equal to the Building Plan Review Fee is due at submittal ($250 of the deposit is non-refundable if the application is cancelled/withdrawn before plan review begins)
- Submittal via the GovWell One-Stop Online Permitting Portal (app.govwelltech.com/camp-verde)
Required documents
- RequiredBuilding Permit ApplicationSubmitted through the GovWell One-Stop Permitting Portal
- RequiredSite/Plot PlanLot dimensions, easements, setbacks, and structure locations
- RequiredConstruction Drawings and Structural CalculationsComplete construction document set referencing the Town's adopted 2024 IRC/IBC design criteria
- OptionalGeotechnical/Soils ReportRequired where site conditions (e.g., expansive soil) warrant per Building Official discretion
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation | $47.00 ($1-$500); $47.00 + $4.25 per additional $100 to $2,000; $108.00 + $16.50 per additional $1,000 to $25,000; $476.00 + $12.50 per additional $1,000 to $50,000; $784.00 + $9.25 per additional $1,000 to $100,000; $1,217.00 + $7.25 per additional $1,000 to $500,000; $3,997.00 + $6.25 per additional $1,000 to $1,000,000; $6,982.00 + $5.25 per additional $1,000 above $1,000,000 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): all eight Total Valuation tiers compared individually against the FY2026-27 workbook (Community Development section,… Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): all eight Total Valuation tiers compared individually against the FY2026-27 workbook (Community Development section, 'BUILDING PERMIT FEES' → 'Total Valuation', rows 312-319) and found identical, base amounts and per-increment rates alike. No FY2026-27 change is recorded against any of the eight rows. |
| Building Plan Review Fee (First Floorplan Review) | 65% of the calculated Building Permit Fee | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Building Plan Review Fee — 65% of Bldg Permit Fee' (Other Building Fees, row 326), no FY2026-27 change recorded. Due at submittal as part of the required deposit. |
| Master Building Plan Review Fee (Each additional floorplan review under same approved plan) | $180.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Master Building Plan Review Fee (Each additional Floorplan Review under same approved plan) — $180' (Other Building Fees, row 328), no FY2026-27 change recorded. |
| Residential Zoning Clearance (single family, incl. Manufactured/Factory-Built/Modular) | $190.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Zoning Clearance for Building Permits → Residential single family dwelling (includes Manufactured and… Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Zoning Clearance for Building Permits → Residential single family dwelling (includes Manufactured and Factory-Built/Modular Buildings) — $190' (row 294), no FY2026-27 change recorded. Prerequisite to the building permit. |
| Deposit (New Single/Multi-Family Residence) | Equal to the Building Plan Review Fee ($250 non-refundable if cancelled/withdrawn before plan review) | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'New Single/Multi-Family Residence — Equal to Building Plan Review Fee ($250 is non refundable if the application is… Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'New Single/Multi-Family Residence — Equal to Building Plan Review Fee ($250 is non refundable if the application is cancelled/withdrawn before plan review)' (Deposits for Building Permit Applications, row 345), no FY2026-27 change recorded. Due at submittal, non-refundable. |
Residential Addition / Remodel / Accessory Structure Permit
VerifiedRequired for room additions, remodels, and non-habitable accessory structures on existing one- and two-family dwellings in the Town of Camp Verde, reviewed against the 2024 IRC as adopted and amended (Ordinance 2026-A512, effective February 26, 2026).
Verified 2026-08-16 · Source
Requirements
- Building permit required for room additions, structural remodels, and detached/attached accessory structures over the Town's zoning-clearance-only threshold (residential zoning clearances alone cover structures under 200 sq ft and fences under 6 ft)
- Requires a Residential Remodel/Accessory Structure Zoning Clearance ($90 for up to 2 structures, plus $30 per additional structure) before the building permit is issued
- Valuation for accessory buildings/structures and alterations/remodels of existing structures is the applicant's valuation or the calculated valuation using the itemized per-square-foot values in the adopted FY2026-27 Fee Schedule (barn, shed, carport, gazebo, deck, enclosed porch, etc.), whichever is greater
- Where no additional floor area or roof coverage is created (e.g., converting a patio/garage to habitable space), valuation is the difference in valuation between the two occupancies plus utilities
- Plans must comply with Town of Camp Verde Design Criteria (100 mph wind, Risk Category I, per Ordinance 2026-A512)
Required documents
- RequiredBuilding Permit ApplicationSubmitted through the GovWell One-Stop Permitting Portal
- RequiredSite/Plot PlanShowing existing structure, addition/accessory-structure footprint, and setbacks
- RequiredConstruction DrawingsStructural details for the addition/remodel/accessory-structure scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Detached Residential Accessory Structures (per sq ft, by type) | Barn $25.00; Shade/Mare Motel $30.00; Greenhouse $21.00; Storage Shed (over 200 sq ft) $25.00; Carport $19.00; Gazebo/Ramada $32.00; Covered/Open Elevated Deck $30.00; Enclosed Porch (habitable) $100.00; Stairs $14.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): all nine per-sq-ft detached-accessory valuation figures compared individually (Valuation Data → Detached Residential… Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): all nine per-sq-ft detached-accessory valuation figures compared individually (Valuation Data → Detached Residential Accessory Buildings/Structures, rows 362-371) and found identical — Barn $25, Shade/Mare Motel $30, Greenhouse $21, Storage Building (Shed) over 200 sq ft $25, Carport $19, Gazebo/Ramada $32, Covered Deck Elevated $30, Open Deck Elevated $30, Enclosed Porch (habitable) $100, Stairs $14. No FY2026-27 change recorded against any row. |
| Attached Residential Accessory Structures (per sq ft, by type) | Greenhouse $21.00; Storage Shed $25.00; Carport $19.00; Balcony $25.00; Covered Patio at Grade $25.00; Covered/Open Elevated Deck $30.00; Screened Porch $10.00; Enclosed Porch (habitable) $80.00; Pre-Fab Canvas/Metal Awning $8.00; Stairs $14.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): all ten per-sq-ft attached-accessory valuation figures compared individually (rows 373-383) and found identical —… Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): all ten per-sq-ft attached-accessory valuation figures compared individually (rows 373-383) and found identical — Greenhouse $21, Storage Building (Shed) $25, Carport $19, Balcony $25, Covered Patio at Grade Level $25, Covered Deck Elevated $30, Open Deck Elevated $30, Screened Porch $10, Enclosed Porch (habitable) $80, Pre-Fab Canvas/Metal Awning $8, Stairs $14. No FY2026-27 change recorded against any row. |
| Residential Alteration/Remodel (per sq ft, by scope) | Enclose Exterior Wall Opening $20.00; Add/Remove Interior Partition $30.00; Install Window/Sliding Glass Door $12.00; Install Exterior Siding $9.00; Plaster/Stucco (no structural change) $9.00; Add Stone/Brick Veneer $18.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): all six per-sq-ft alteration/remodel valuation figures compared individually (Valuation Data → Residential… Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): all six per-sq-ft alteration/remodel valuation figures compared individually (Valuation Data → Residential Alteration/Remodel Of Existing Structure, rows 387-392) and found identical — Enclose Exterior Wall Opening $20, Add or Remove Interior Partition $30, Install Window or Sliding Glass Door $12, Install Exterior Siding $9, Plaster/Stucco $9, Add Stone or Brick Veneer $18. No FY2026-27 change recorded against any row. |
| Residential Remodel / Accessory Structure Zoning Clearance | $90.00 (up to 2 structures) + $30.00 per additional structure | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential remodel \ Accessory structure — $90.00: Up to two (2) Accessory Structures plus $30 for each structure thereafter' (row 295), no FY2026-27 change recorded. |
| Building Plan Review Fee | 65% of the calculated Building Permit Fee | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Building Plan Review Fee — 65% of Bldg Permit Fee' (Other Building Fees, row 326), no FY2026-27 change recorded. |
Residential Over-the-Counter (OTC) Permit — Electrical / Mechanical / Plumbing / Building
VerifiedFor minor residential building, electrical, mechanical, or plumbing projects (e.g., electrical service upgrades, yard gas lines, water heater installations) in the Town of Camp Verde, issued on a fast-track, minimal-plan-review basis relative to standard building permits.
Verified 2026-08-16 · Source
Requirements
- Available for minor residential building, electrical, mechanical, or plumbing projects such as electrical service upgrades, yard gas lines, and hot water heater installations
- Governed by the 2023 NEC, 2024 IPC, 2024 IMC, and 2024 IFGC as adopted by the Town of Camp Verde (Ordinance 2026-A512, effective 02-26-2026)
- Combo permits (any combination of electrical/mechanical/plumbing/building OTC scopes) are available under a single application
- Apply via the GovWell One-Stop Permitting Portal
Required documents
- RequiredOver-the-Counter Permit ApplicationSubmitted through the GovWell One-Stop Permitting Portal
- RequiredManufacturer Specifications / Cut SheetsRequired for equipment being installed (e.g., water heater, HVAC unit)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| OTC Electrical | $90.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential Over the Counter Permits → Electrical — $90' (row 428), no FY2026-27 change recorded. |
| OTC Mechanical | $90.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential Over the Counter Permits → Mechanical — $90' (row 429), no FY2026-27 change recorded. |
| OTC Plumbing | $90.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential Over the Counter Permits → Plumbing — $90' (row 430), no FY2026-27 change recorded. |
| OTC Building | $90.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential Over the Counter Permits → Building — $90' (row 431), no FY2026-27 change recorded. |
| OTC Combo (any combination of the above) | $90.00 flat fee plus $30.00 for each added OTC permit (includes 2 inspections) | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Combo (Any Combination Of The Above) — $90.00 Flat Fee Plus $30.00 For Each Added Over The Counter Permit (Includes Two (2) Inspections)' (row 432), no FY2026-27 change recorded. |
Residential Solar Photovoltaic (PV) / BESS / Wind Turbine / Generator Permit
VerifiedRequired for installation of rooftop or ground-mounted residential solar photovoltaic systems, Battery Energy Storage Systems (BESS), wind turbines, and generators in the Town of Camp Verde. Governed by the 2018 IFC Solar Photovoltaic Requirements referenced by the Town and the 2023 NEC as adopted (Ordinance 2026-A512).
Verified 2026-08-16 · Source
Requirements
- Governed by the 2023 NEC and the Town's referenced 2018 IFC Solar Photovoltaic Requirements
- Equipment cut sheets with UL Listing information and Manufacturer's Installation Instructions must be included with construction documents
- Systems up to 15kWh AC/DC (residential or commercial) are billed at a flat fee plus Zoning & Fire Marshal plan review fees
- Systems over 15kWh AC/DC are billed at 20% of applicant valuation or $2.75/watt (whichever is greater) plus Building, Zoning & Fire Marshal plan review fees
- Apply via the GovWell One-Stop Permitting Portal
Required documents
- RequiredSolar/BESS Permit ApplicationSubmitted through the GovWell One-Stop Permitting Portal
- RequiredEquipment Cut Sheets with UL ListingRequired for all PV panels, inverters, batteries (BESS), or generator equipment, with Manufacturer's Installation Instructions
- RequiredSite Plan / Roof or Ground-Mount LayoutShows array location, racking, and 3-line electrical diagram
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar/BESS/Wind Turbine/Generator, Residential or Commercial — Up to 15kWh AC/DC | $206.00 flat fee, plus Zoning & Fire Marshal plan review fees | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): the Residential and Commercial rows are separate lines carrying identical text — '$206.00 Flat Fee for all Systems up… Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): the Residential and Commercial rows are separate lines carrying identical text — '$206.00 Flat Fee for all Systems up to 15kwh AC/DC Plus Zoning & Fire Marshal Plan Review Fees.' (rows 439-440). No FY2026-27 change recorded against either. The referenced Fire Marshal plan review fee is set by the fire district, not the Town: the current Copper Canyon Fire & Medical District schedule lists Residential Photovoltaic $200.00, Residential Photovoltaic with BESS $350.00, Commercial Photovoltaic $300.00 per system and Commercial Photovoltaic with BESS $450.00 per system (each including plan review and 1 inspection), read from a render of page 2 of that schedule on 2026-08-16. |
| Solar/BESS, Residential or Commercial — Over 15kWh AC/DC | 20% of applicant valuation or $2.75/watt (whichever is greater), plus Building, Zoning & Fire Marshal plan review fees | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): Residential and Commercial 'Over 15kwh AC/DC' rows both read 'Systems Over 15kwh will be Calculated Using 20% of… Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): Residential and Commercial 'Over 15kwh AC/DC' rows both read 'Systems Over 15kwh will be Calculated Using 20% of Applicant Valuation or $2.75/watt, Whichever is Greater, Plus Building, Zoning & Fire Marshal Plan Review Fees.' (rows 441-442). No FY2026-27 change recorded against either. A utility-scale installation is separately priced by the fire district: the current CCFMD schedule lists 'Solar Farm (plan review & 2 inspections) — Based on project cost.' |
Manufactured / Modular / Factory-Built Home Installation Permit
Required for placement of Factory Built Buildings, Manufactured Homes, and Mobile Homes within the incorporated area of the Town of Camp Verde. The Town enforces installation standards for these structures under an Intergovernmental Agreement (IGA) with the Arizona Department of Fire, Building and Life Safety, Office of Manufactured Housing (OMH).
Reviewed 2026-08-16 · Source
Requirements
- Installation permit required in the incorporated Town of Camp Verde for placement of Factory Built Buildings, Manufactured Homes, and Mobile Homes
- Enforced under an Intergovernmental Agreement (IGA) between the Town and the Arizona Department of Fire, Building and Life Safety, Office of Manufactured Housing (OMH), pursuant to A.A.C. §R4-34-501 and §R4-34-801
- A Residential Zoning Clearance is required (single-family dwelling category, $190, which explicitly includes Manufactured and Factory-Built/Modular Buildings)
- Manufactured Housing Skirting billed separately per linear foot
- Includes three (3) inspections in the base OMH-schedule fee for the home set/factory-built installation
Required documents
- RequiredManufactured/Modular Home Installation Permit ApplicationSubmitted through the GovWell One-Stop Permitting Portal
- RequiredFloor Plans and Foundation DetailsManufacturer-provided floor plan and Town/OMH-compliant foundation/tie-down details
- RequiredOMH Insignia / Installation DocumentationManufactured home rating and installation standards documentation per the Town-OMH intergovernmental agreement
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Manufactured Home Set (includes 3 inspections) | Per Arizona Office of Manufactured Housing (OMH) Fee Schedule | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential Manufactured Home Set* — See OMH Fee Schedule (Includes Three (3) Inspections)' (row 460), no FY2026-27 change recorded. Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential Manufactured Home Set* — See OMH Fee Schedule (Includes Three (3) Inspections)' (row 460), no FY2026-27 change recorded. The fee is set by AZ OMH and adopted by the Town via IGA per A.A.C. §R4-34-501/§R4-34-801, not independently set by the Town; the Town now links the Arizona Office of Manufactured Housing schedule covering 7/1/26 to 6/30/27. |
| Residential Manufactured Home — Plan Review | $180.00 as listed in the adopted FY2026-27 Fee Schedule, BUT the Town's own Development Permits page states this specific fee 'is no longer charged' — see notes | TWO OFFICIAL SOURCES DISAGREE; both are recorded rather than one being silently preferred. Show full citationHideTWO OFFICIAL SOURCES DISAGREE; both are recorded rather than one being silently preferred. (1) The adopted FY2026-27 Consolidated Fee Schedule (Resolution 2026-1217, effective 7/1/2026) still lists 'Residential Manufactured Home - Plan Review — $180' at row 461, with no FY2026-27 change recorded against it. (2) The Town's own Development Permits page, in the 'Fees and Valuation' section immediately above the link to that same schedule, carries a bolded notice: 'Fee Update: The "Residential Manufactured Home – Plan Review" fee listed in the Town Fee Schedule is no longer charged.' The notice is specific to the residential manufactured-home line and does not extend to the Factory Built/Modular plan review fees, which remain $180. The adopted resolution is the authoritative instrument; the webpage notice is the department's statement of current practice and is the more favourable of the two for an applicant. Confirm with the Building Division which is being collected before budgeting for it. |
| Residential/Commercial Factory Built/Modular Building (includes 3 inspections) | Per Arizona OMH Fee Schedule | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential Factory Built/Modular Building* — See OMH Fee Schedule (Includes Three (3) Inspections)' (row 462) and… Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential Factory Built/Modular Building* — See OMH Fee Schedule (Includes Three (3) Inspections)' (row 462) and 'Commercial Factory Built/Modular Building* — See OMH Fee Schedule (Includes Three (3) Inspections)' (row 464), no FY2026-27 change recorded against either. |
| Residential/Commercial Factory Built/Modular — Plan Review | $180.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential Factory Built/modular - Plan Review — $180' (row 463) and 'Commercial Factory Built/Modular Building -… Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential Factory Built/modular - Plan Review — $180' (row 463) and 'Commercial Factory Built/Modular Building - Plan Review — $180' (row 465), no FY2026-27 change recorded against either. The Town's 'no longer charged' notice applies only to the Residential Manufactured Home plan review line, not to these. |
| Manufactured Housing Skirting (no retaining/surcharge) | $10.00 per every 10 linear feet | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Manufactured Housing Skirting (No Retaining/Surcharge)(per linear foot) — $10.00 per every 10 linear feet.' (row 459),… Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Manufactured Housing Skirting (No Retaining/Surcharge)(per linear foot) — $10.00 per every 10 linear feet.' (row 459), no FY2026-27 change recorded. The Town's Development Permits page separately notes that the skirting fees listed in the Town Fee Schedule do not apply to new installations. |
| Residential Zoning Clearance (single family dwelling, incl. Manufactured/Factory-Built) | $190.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential single family dwelling (includes Manufactured and Factory-Built/Modular Buildings) — $190' (row 294), no FY2026-27 change recorded. |
Demolition Permit
VerifiedRequired for demolition of any existing residential or commercial structure in the Town of Camp Verde, billed as a flat fee based on the number of structures on the same Assessor's Parcel Number.
Verified 2026-08-16 · Source
Requirements
- Building permit required before demolishing a residential or commercial structure within Camp Verde town limits
- Site plan required showing the structure(s) to be demolished and remaining structures on the parcel
- Fee scales by number of structures on the same Assessor's Parcel Number, not by valuation
- Apply via the GovWell One-Stop Permitting Portal
Required documents
- RequiredDemolition Permit ApplicationSubmitted through the GovWell One-Stop Permitting Portal
- RequiredSite PlanShowing the structure(s) to be demolished and remaining structures on the parcel
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition — Up to 2 structures on same Assessor's Parcel Number | $90.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Demolition of Any Existing Structure (Residential or Commercial) → Up To Two (2) Structures On Same Assessor\'s Parcel Number — $90' (row 398), no FY2026-27 change recorded. |
| Demolition — More than 2 structures on same Assessor's Parcel Number | $90.00 for the first 2 structures, plus $30.00 for each structure thereafter | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'More Than Two (2) Structures On Same Assessor\'s Parcel Number — $90.00 For the First Two (2) Structures plus $30.00 For Each Structure Thereafter' (row 399), no FY2026-27 change recorded. |
Commercial Building Permit (New Building / Tenant Improvement)
Required for new commercial buildings, commercial accessory structures, tenant improvements, and multi-family buildings in the Town of Camp Verde. Reviewed against the 2024 IBC as adopted and amended by the Town via Ordinance 2026-A512 (effective February 26, 2026).
Reviewed 2026-08-16 · Source
Requirements
- Building permit required for new commercial construction, commercial accessory structures, tenant improvements, and multi-family buildings within Camp Verde town limits
- Requires a Commercial Zoning Clearance before permit issuance: $325 for new commercial (including Factory-Built/Modular) construction, or $110 (up to 2 structures, plus $30 each additional) for commercial remodel/accessory structures
- New commercial buildings and commercial accessory structures (new) are valued at the applicant's valuation or the ICC Building Valuation Data (BVD) Table, whichever is greater
- Commercial alteration/remodel of an existing structure (tenant improvements) is valued based on the bid price provided by a licensed commercial contractor, plus applicable plan review fees
- Commercial project deposits equal the sum of Building Plan Review, Engineer Plan Review, Fire Plan Review, and Sanitary Plan Review fees, plus the Zoning Clearance fee
- Contact the Community Development Department at (928) 554-0050 regarding whether a proposed commercial project may qualify for a Development Standards Review
Required documents
- RequiredCommercial Building Permit ApplicationSubmitted through the GovWell One-Stop Permitting Portal
- RequiredConstruction Drawings and Structural CalculationsComplete commercial construction document set referencing the Town's adopted 2024 IBC design criteria
- RequiredContractor Bid / Valuation DocumentationRequired for tenant improvement/remodel valuation basis
- OptionalSoils/Geotechnical ReportRequired for commercial grading or where expansive soil conditions apply
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation | Same Building Permit Fee table as new residential construction: $47.00 ($1-$500) scaling up to $6,982.00 + $5.25 per additional $1,000 above $1,000,000 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): all eight Total Valuation tiers compared individually (rows 312-319) and found identical. Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): all eight Total Valuation tiers compared individually (rows 312-319) and found identical. Commercial valuation itself is set by row 394, "Commercial (New Building) — Applicant's Valuation OR ICC Building Valuation Data Table, Whichever Is Greater", also unchanged. |
| Building Plan Review Fee | 65% of the calculated Building Permit Fee | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Building Plan Review Fee — 65% of Bldg Permit Fee' (row 326), no FY2026-27 change recorded. |
| Commercial Zoning Clearance — New Commercial (incl. Factory-Built/Modular) | $325.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'New Commercial (includes Factory-Built/Modular Buildings) — $325' (row 299), no FY2026-27 change recorded. |
| Commercial Zoning Clearance — Remodel/Accessory Structure | $110.00 (up to 2 structures) + $30.00 per additional structure | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Commercial Remodel \ Accessory structure — $110.00: Up to two (2) Accessory Structures plus $30 for each structure thereafter' (row 298), no FY2026-27 change recorded. |
| Technical Review Committee Meeting (TRCM) — replaces the former Development Standards Review for Commercial/Industrial | $500.00 flat plus Fire Marshal Review Fee | CHANGED, and the two relevant rows of the adopted FY2026-27 workbook are quoted verbatim so the reader can see exactly what the document says. Show full citationHideCHANGED, and the two relevant rows of the adopted FY2026-27 workbook are quoted verbatim so the reader can see exactly what the document says. Row 236: 'Technical Review Committee Meetings (TRCM)' — 2025-26 column '$500.00 plus Fire Marshal Review Fee'; 2026-27 column 'TRCMs are now taking the place of Development Standard Reviews; recommending flat fee for the meeting and complete review.' Row 237: 'Development Standards Review - Commercial/Industrial' — 2025-26 column '$2,500 plus $0.10 sq. ft. over 5000 sq. ft. ($15k max) plus Fire Marshal Review Fee'; 2026-27 column 'See note above.' (Row 238, Development Standards Review – Multifamily, RV, Lodging, is annotated identically.) On the face of the adopted schedule the Development Standards Review is superseded by the flat $500.00 TRCM fee, which the annotation says covers both the meeting and the complete review. What the workbook does NOT do is print a replacement rate on the Development Standards Review row itself — it cross-references instead — so this reading, while the plain one, is an interpretation of an annotation rather than a directly published figure. That single unresolved row is why this permit type is marked partial. |
| Deposit (Commercial Projects) | Equal to Building Plan Review Fees + Engineer Plan Review Fees + Fire Plan Review Fees + Sanitary Plan Review Fees + Zoning Clearance Fees | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Commercial Projects' deposit builds from five stacked rows (339-344): 'Equal To Building Plan Review Fees' + 'Plus… Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Commercial Projects' deposit builds from five stacked rows (339-344): 'Equal To Building Plan Review Fees' + 'Plus Engineer Plan Review Fees' + 'Plus Fire Plan Review Fees' + 'Plus Sanitary Plan Review Fees' + 'Plus Zoning Clearance Fees'. No FY2026-27 change recorded against any of them. Due at submittal, non-refundable. |
EV Charger / EVSE Permit
Installation of an electric vehicle charger (EVSE) at a Camp Verde property is electrical work, most likely processed under the Town's Residential Over-the-Counter (OTC) Electrical permit — the same fast-track category explicitly used for 'electrical service upgrades' — since no distinct EV-charger/EVSE line item exists in the Town of Camp Verde FY2026-27 Consolidated Fee Schedule (Resolution 2026-1217, effective 7/1/2026) either. Note that the Copper Canyon Fire & Medical District schedule, which the Town's Development Permits page says governs all fire-related fees, does now carry an 'EV Charging Stations (plan review and 1 inspection) — $180.00' line; whether it is triggered by a simple residential charger is not stated by either body, which is why this permit type is marked partial.
Reviewed 2026-08-16 · Source
Requirements
- Available as a minor residential electrical project (e.g., electrical service upgrade) under the OTC Electrical permit, per the Town's over-the-counter permit category
- Governed by the 2023 NEC as adopted by the Town of Camp Verde (Ordinance 2026-A512, effective 02-26-2026)
- Apply via the GovWell One-Stop Permitting Portal
- No EV-charger-specific application form, checklist, or fee category was found published separately from the general OTC Electrical / standard Electrical Permit
Required documents
- RequiredOver-the-Counter Permit Application (Electrical)Submitted through the GovWell One-Stop Permitting Portal for minor electrical work such as an EVSE circuit/service upgrade
- RequiredManufacturer Specifications / Cut SheetsEquipment specifications for the EV charging station being installed
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| OTC Electrical (closest-fit category — covers electrical service upgrades) | $90.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential Over the Counter Permits → Electrical — $90' (row 428), no FY2026-27 change recorded. Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential Over the Counter Permits → Electrical — $90' (row 428), no FY2026-27 change recorded. The adopted FY2026-27 schedule still contains no distinct EV-charger/EVSE line item of its own, and now also offers a Commercial Over the Counter Electrical permit at the same $90. |
| Copper Canyon Fire & Medical District — EV Charging Stations (plan review and 1 inspection); applicability to a simple residential EVSE not stated | $180.00 | NEW INFORMATION, not a change to a figure we previously published. Show full citationHideNEW INFORMATION, not a change to a figure we previously published. The Town's Development Permits page states plainly that 'Any fire-related fees are subject to the Copper Canyon Fire & Medical District Fee Schedule', and the district's current schedule carries a line in its PHOTOVOLTAIC AND BESS table reading 'EV Charging Stations (plan review and 1 inspection) — $180.00', read from a 200-dpi render of page 2 on 2026-08-16. The line does not distinguish residential from commercial installations and neither the Town nor the district publishes any statement about whether a single residential EVSE triggers a fire-district plan review at all. It is recorded here because a $180 charge on top of a $90 permit materially changes the cost of this permit if it applies, and omitting it would understate the total; it is NOT recorded as an established charge for residential work. Confirm with the Building Division and CCFMD before budgeting. |
Sign Permit (Commercial/Business Signage)
VerifiedRequired for installation of most commercial/business signage in the Town of Camp Verde, per the Sign Permit Application Checklist. Fees vary by whether the sign is illuminated, and dedicated no-fee tracks exist for flags/banners and A-frame (sandwich board) signs. Additional sign regulations are set by Section 404 (Signs) of the Town's Planning & Zoning Ordinance.
Verified 2026-08-16 · Source
Requirements
- Applicant should contact Community Development to discuss proposed signage before applying; allowed sign sizes and types depend on the proposed use per the permits page
- All commercial signs must be installed by a contractor holding one of the following active Arizona ROC License classifications: B-01 (General Commercial Contractor), B-02 (General Small Commercial Contractor), KB-1 (Dual Building Contractor), KB-2 (Dual Residential and Small Commercial Contractor), or CR-38 (Signs Contractor); a Town-issued Business License is also required
- A Lumen Calculation form is required if the sign is externally illuminated; internal illumination is not included in the overall lumen calculations
- External lights must be fully shielded per Part 4, Section 405 of the Planning & Zoning Ordinance
- Site plan (1 electronic PDF) must show north arrow, parcel number, property lines/lot dimensions, roadways/easements/parking, existing buildings with square footage, placement of all existing and proposed signs, and illumination type/placement
- Footing details (size, depth, rebar, concrete strength) are required for pole and monument signs
- One sign permit application covers up to two (2) signs and includes up to two (2) inspections; additional signs beyond two are billed per-sign
Required documents
- RequiredSign Permit ApplicationSubmitted through the GovWell One-Stop Permitting Portal along with the Sign Permit Submittal Checklist form
- RequiredSite PlanShowing north arrow, parcel number, property lines/dimensions, existing structures with square footage, and placement of existing/proposed sign(s)
- RequiredSign Detail / GraphicDetailed color graphic or photo of the proposed sign with dimensions, height, construction material, and mounting/attachment details
- OptionalLumen Calculation FormRequired only if the sign is externally illuminated
- RequiredContractor ROC License InformationVerifying the installing contractor holds an accepted ROC classification (B-01, B-02, KB-1, KB-2, or CR-38) and a Town Business License
- OptionalDesignation of Agent Form / Owner Letter of AuthorizationRequired if the applicant is not the property owner (or use the DOA/owner authorization section on the application)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit — Zoning Clearance | $110.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Sign Permits → Zoning Clearance — $110' (row 276), no FY2026-27 change recorded. |
| Sign Permit — Building Review | $65.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Sign Permits → Building Review — $65' (row 277), no FY2026-27 change recorded. |
| Sign Permit — Illuminated Sign Surcharge | $80.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Sign Permits → Illuminated — $80' (row 278), added on top of the Zoning Clearance and Building Review fees for illuminated signs, no FY2026-27 change recorded. |
| Flags / Banners | No Fee | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Sign Permits → Flags / Banners — No Fee' (row 280); still listed as a Sign Permit category (a permit record is created) but no dollar fee is charged, no FY2026-27 change recorded. |
| A-Frame (Sandwich Board) Sign | No Fee | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Sign Permits → A Frame Sign — No Fee' (row 281), no FY2026-27 change recorded. |
| Mural | $55.00 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Sign Permits → Mural — $55' (row 282), no FY2026-27 change recorded. |
| Additional Sign (beyond the 2 signs included in a base permit) | $30.00 per additional sign | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): the Sign Permits note row (279): 'Note: Each Permit Includes up to (2) Signs, plus $30 for each additional Sign. Includes up to (2) Inspections.', no FY2026-27 change recorded. |
| Investigation Fee (sign installed without an authorized permit) | Equal to the cost of the Zoning Clearance Fee and/or Land Use Fee | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Investigation Fee (Installing accessory structure, sign, fence, outdoor lighting, or other structures requiring zoning… Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Investigation Fee (Installing accessory structure, sign, fence, outdoor lighting, or other structures requiring zoning clearance or conducting activities requiring a land use permits without an authorized permit) — Equal to the cost of the Zoning Clearance Fee and/or Land Use Fee' (row 300), no FY2026-27 change recorded. |
Fire Protection Systems Permit — Fire Alarm / Fire Sprinkler / Kitchen Hood Suppression / Above-Ground Storage Tank
VerifiedCovers installation of fire alarm systems, fire sprinkler systems (NFPA 13/13R commercial and NFPA 13D one-and-two-family residential), commercial kitchen hood/Ansul suppression systems, and above-ground fire protection water storage tanks in the Town of Camp Verde. Submitted as a single Town 'Fire Protection Systems Permit Application' alongside the applicable system-specific application from Copper Canyon Fire & Medical District (CCFMD) — the independent special fire district that serves Camp Verde and directly reviews/fees these systems. Camp Verde does not have its own municipal fire department; it relies on CCFMD.
Verified 2026-08-16 · Source
Requirements
- Town of Camp Verde 'Fire Protection Systems Permit Application' checklist required for water tanks, hood exhaust systems, fire alarms, and fire sprinklers, submitted together with the applicable CCFMD-specific application (Fire Alarm, Sprinkler System, Hood, or Tank Application)
- Copper Canyon Fire & Medical District (CCFMD), 26B Salt Mine Road, Camp Verde, AZ 86322, (928) 567-9401 — an independent fire district (established 2016 per its own letterhead) — is the fire authority serving Camp Verde and independently reviews and fees fire alarm/sprinkler/suppression/tank systems; NOTE: some of the Town's own boilerplate checklist text still refers to a 'Camp Verde Fire District' or 'CVFD', an inconsistent/stale label — the current application forms, fee schedule, and letterhead are all explicitly branded Copper Canyon Fire & Medical District
- Commercial applicants must receive Development Standards Requirements approval from Planning & Zoning before submitting for construction
- Plans not meeting the exception requirements of A.R.S. §32-144 must be designed and sealed by an Arizona-licensed Architect/Engineer
- Fire Alarm and Fire Sprinkler plans specifically must be designed/sealed by an Arizona Registered Design Professional and reference the CCFMD application available on the Town's website
- Per A.R.S. §9-807, the Town cannot mandate (or prohibit) fire sprinklers in a single-family detached residence or a residential building with 2 or fewer dwelling units, except under code/ordinance adopted before December 31, 2009
- A deposit is collected at submittal per the current adopted fee schedule; a separate permit is required for each deferred submittal item
Required documents
- RequiredFire Protection Systems Permit Application Checklist (Town)Town of Camp Verde application packet covering project/property/applicant/contractor information and a plot plan sketch
- OptionalCCFMD Fire Alarm Permit ApplicationCopper Canyon Fire & Medical District application form, required for fire alarm system scope
- OptionalCCFMD Sprinkler System Permit ApplicationCopper Canyon Fire & Medical District application form, required for fire sprinkler system scope
- OptionalCCFMD Hood Permit ApplicationCopper Canyon Fire & Medical District application form, required for commercial kitchen hood/Ansul suppression scope
- OptionalCCFMD Tank ApplicationCopper Canyon Fire & Medical District application form, required for above-ground fire protection storage tank scope
- RequiredDigital Plan SetCover sheet, site plan, and fire alarm/sprinkler plans sealed by an Arizona Registered Design Professional, at a scale no less than 1/8" = 1'
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Town Building Permit Fee — Fire Alarm (Commercial) | Applicant's valuation or $3.50/sq ft, whichever is greater; $375 max, plus Fire Marshal Fees | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'MISCELLANEOUS EQUIPMENT → Fire Alarm → Commercial — Applicants valuation or $3.50 a sq.ft. Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'MISCELLANEOUS EQUIPMENT → Fire Alarm → Commercial — Applicants valuation or $3.50 a sq.ft. whichever is greater; $375 max, plus Fire Marshal Fees.' (row 446), no FY2026-27 change recorded. This is the Town's own Building Permit Fee, separate from the CCFMD fees below. |
| Town Building Permit Fee — Fire Alarm (Residential) | Applicant's valuation or $1.50/sq ft, whichever is greater; $375 max, plus Fire Marshal Fees | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Fire Alarm → Residential — Applicants valuation or $1.50 a sq.ft. whichever is greater; $375 max, plus Fire Marshal Fees.' (row 447), no FY2026-27 change recorded. |
| Town Building Permit Fee — Fire Suppression/Sprinkler (Commercial) | Applicant's valuation or $1.50/sq ft, whichever is greater; $375.00 maximum, plus Fire Marshal Fees | A $375.00 cap has been added where there was none. Show full citationHideA $375.00 cap has been added where there was none. Row 450, 'Fire Suppression → Commercial': the 2025-26 column reads 'Applicants valuation or $1.50 a sq. ft., Whichever is greater plus Fire Marshal Fees.' and the 2026-27 column reads 'Add in Maximum $375.00'. The per-square-foot rate itself is unchanged; the cap is new for FY2026-27 and brings Fire Suppression into line with the Fire Alarm rows, which already carried a $375 max. |
| Town Building Permit Fee — Fire Suppression/Sprinkler (Residential) | Applicant's valuation or $1.50/sq ft, whichever is greater; $375.00 maximum, plus Fire Marshal Fees | A $375.00 cap has been added where there was none. Show full citationHideA $375.00 cap has been added where there was none. Row 451, 'Fire Suppression → Residential': the 2025-26 column reads 'Applicants valuation or $1.50 a sq. ft., Whichever is greater plus Fire Marshal Fees.' and the 2026-27 column reads 'Add in Maximum $375.00'. The per-square-foot rate is unchanged. |
| Town Building Permit Fee — Fire Suppression Commercial/Residential Retrofit | Applicant's valuation or $2.50/sq ft, whichever is greater; $375.00 maximum, plus Fire Marshal Fees | A $375.00 cap has been added where there was none. Show full citationHideA $375.00 cap has been added where there was none. Row 452, 'Fire Suppression → Commercial/Residential Retrofit': the 2025-26 column reads 'Applicants valuation or $2.50 a sq. ft., Whichever is greater, plus Fire Marshal Fees.' and the 2026-27 column reads 'Add in Maximum $375.00'. The per-square-foot rate is unchanged. |
| CCFMD Fire Alarm — NFPA 72 Systems, New Install (plan review, 1 rough-in inspection and 1 Final) | $535.00 base (over 10,000 sq ft, plus $0.03 per sq ft) | $483 → $535.00. Read from a 200-dpi render of page 2 of the current CCFMD schedule, FIRE ALARM table, row 'NFPA 72 Systems - New Install (plan review, 1 rough-in inspection and 1 Final) — $535.00… Show full citationHide$483 → $535.00. Read from a 200-dpi render of page 2 of the current CCFMD schedule, FIRE ALARM table, row 'NFPA 72 Systems - New Install (plan review, 1 rough-in inspection and 1 Final) — $535.00 over 10,000 Sq Ft Base +.03 per sq ft'. The included-work description has also changed: the current schedule specifies 1 rough-in inspection and 1 final, where the superseded 2023 schedule was cited here as including 1 plan review, 1 re-submittal and 2 inspections. |
| CCFMD Fire Alarm — Modifications to Existing System (plan review, 1 rough-in and 1 Final Inspection) | $300 | AMOUNT UNCHANGED at $300.00, SCOPE CHANGED. Show full citationHideAMOUNT UNCHANGED at $300.00, SCOPE CHANGED. Read from a render of page 2 of the current CCFMD schedule, FIRE ALARM table: 'Modifications to Existing System (plan review, 1 rough-in and 1 Final Inspection) — $300.00'. The device-count qualifier this record previously carried ('1-20 devices') no longer appears — the current schedule prices all fire-alarm modifications at a single $300.00 with no device threshold, which also resolves the prior note's complaint that the fee for more than 21 devices was not legibly published. |
| CCFMD Fire Sprinkler — NFPA 13 & 13R (plan review & 2 inspections) | $600 (covers up to 10,000 sq ft; +$0.03/sq ft over 10,000 sq ft) | UNCHANGED at $600.00. Read from a 200-dpi render of page 1 of the current CCFMD schedule, SPRINKLER SYSTEMS table: 'NFPA 13 & 13R (plan review & 2 inspections) — $600.00 up to 10,000 sq ft Base fee + $0.03 per additional sq ft after 10,000 sq ft'. Identical to what we published. |
| CCFMD Fire Sprinkler — NFPA 13D (plan review & 2 inspections) | $460.00 up to 10,000 sq ft; +$0.03 per additional sq ft over 10,000 sq ft | $400 → $460.00. Read from a render of page 1 of the current CCFMD schedule, SPRINKLER SYSTEMS table: 'NFPA 13D (plan review & 2 inspections) — $460.00 up to 10,000 sq ft Base fee + $0.03 Per… Show full citationHide$400 → $460.00. Read from a render of page 1 of the current CCFMD schedule, SPRINKLER SYSTEMS table: 'NFPA 13D (plan review & 2 inspections) — $460.00 up to 10,000 sq ft Base fee + $0.03 Per additional sq ft after 10,000 sq ft'. The current schedule also adds a spec-home provision immediately above that row: 'Fees for 13D Spec Home Projects (meaning same for same for a 13D system) $460.00 initial fee, which includes plan review fee and two inspections. Subsequent charges are an additional fee of $210.00 for each additional unit.' |
| CCFMD Fire Sprinkler — Modifications to Existing Systems (now split by head count) | 20 heads or less: $200.00 (over-the-counter permit, 1 inspection). 21 heads or greater: $400.00 (plan review & 2 inspections) | A single $400 modification fee has become two head-count tiers, adding a cheaper small-job option. Show full citationHideA single $400 modification fee has become two head-count tiers, adding a cheaper small-job option. Read from a render of page 1 of the current CCFMD schedule, SPRINKLER SYSTEMS table: 'Modifications to existing sprinkler systems, 20 heads or less Over the counter permit (1 Inspection) — $200.00' and 'Modifications to existing sprinkler systems, 21 heads or greater (plan review & 2 Inspections) — $400.00'. The $400 we published survives only as the upper tier; small modifications are now half that. |
| CCFMD Kitchen Hood Suppression Systems — New Install (plan review & 1 inspection) | Single System $300.00; Additional System $150.00 | Single system $283 → $300.00, each additional system $130 → $150.00. Show full citationHideSingle system $283 → $300.00, each additional system $130 → $150.00. Read from a 200-dpi render of page 2 of the current CCFMD schedule, KITCHEN HOOD SUPPRESSION SYSTEMS table: 'Single System (plan review & 1 inspection) — $300.00' and 'Additional System (plan review & 1 inspection) — $150.00'. The 'per submittal' phrasing this record carried no longer appears on the schedule. |
| CCFMD Kitchen Hood Suppression Systems — Modification (plan review & 1 inspection) | $150.00 | CHANGED, and the structure changed as well as the amount: the superseded schedule priced modifications at $160 for a single system and $100 for each additional, while the current schedule carries a… Show full citationHideCHANGED, and the structure changed as well as the amount: the superseded schedule priced modifications at $160 for a single system and $100 for each additional, while the current schedule carries a single undifferentiated row. Read from a render of page 2 of the current CCFMD schedule, KITCHEN HOOD SUPPRESSION SYSTEMS table: 'Modification (plan review & 1 inspection) — $150.00'. There is no per-additional-system modification line in the current schedule. |
| Town Kitchen Type I or II Hood System | Applicant's valuation or $6,000, whichever is greater, plus Fire Marshal Fees | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'MISCELLANEOUS EQUIPMENT → Kitchen Type I or II Hood System — Applicant\'s Valuation OR $6000.00, Whichever Is Greater, Plus Fire Marshal Fees' (row 448), no FY2026-27 change recorded. |
| CCFMD Plan Review — All New Construction, and separate flat fees for tenant improvements and residential alterations | All New Construction: 40% of Permit Fee. Tenant Improvements w/Change of Use (Commercial), incl. plan review and 1 inspection: $250.00. Residential Additions / Alterations, incl. plan review and 1 inspection: $200.00. Simple Addition or TI (Residential or Commercial) with no comment/inspection: No Fee | CHANGED, and the change is material rather than cosmetic: this record published the CCFMD plan review as '40% of the Town of Camp Verde plan review fee', but the current schedule's PLAN REVIEWS table… Show full citationHideCHANGED, and the change is material rather than cosmetic: this record published the CCFMD plan review as '40% of the Town of Camp Verde plan review fee', but the current schedule's PLAN REVIEWS table reads 'All New Construction — 40% of Permit Fee'. Because the Town's own Building Plan Review Fee is itself 65% of the Building Permit Fee, 40% of the permit fee and 40% of the plan review fee are very different numbers, and the base we published was the wrong one. Read from a 200-dpi render of page 1 of the current CCFMD schedule. The same table also adds three rows this record did not carry: 'Tenant Improvements w/Change of Use (Commercial) (plan review and 1 inspection) — $250.00', 'Residential Additions / Alterations (plan review and 1 inspection) — $200.00', and 'Simple Addition or TI (Residential or Commercial) = No Comment/Inspection — No Fee'. This is the Fire Plan Review Fee referenced in the Town's commercial project deposit calculation. |
| CCFMD Expedited Reviews (1 week or less) | 2.5 × the original fee | CHANGED from a flat charge to a multiplier: $572 per submittal → '2.5 x original fee'. Show full citationHideCHANGED from a flat charge to a multiplier: $572 per submittal → '2.5 x original fee'. Read from a 200-dpi render of page 1 of the current CCFMD schedule, PLAN REVIEWS table, row 'Expedited Reviews (1 week or less)'. On the current schedule the expedited charge therefore scales with whatever the underlying review costs rather than being a fixed sum. |
| CCFMD Re-submittal — for each re-submittal | $100/hour, 1-hour minimum | AMOUNT UNCHANGED at $100.00 per hour with a 1-hour minimum. Show full citationHideAMOUNT UNCHANGED at $100.00 per hour with a 1-hour minimum. Read from a 200-dpi render of page 1 of the current CCFMD schedule, PLAN REVIEWS table, row 'Re-submittal - For each re-submittal — $100.00 per/hr 1 hr min'. The label has changed: the current schedule charges per re-submittal rather than framing it as review beyond an included allowance. |
Change of Use / Certificate of Occupancy (processed via Commercial Tenant Improvement Permit)
The Town of Camp Verde does not publish a standalone 'change of use permit' or a standalone 'Certificate of Occupancy permit' application. A change in occupancy/use of an existing commercial building is processed through the Commercial Tenant Improvement Permit Application, whose own Town description explicitly covers 'either new or existing tenants and/or changes in occupancy.' A Certificate of Occupancy is then issued as the final step of that (or any) building permit's inspection sequence, per the Building Division's published process flow chart, at no separate charge — a distinct fee applies only if a Temporary Certificate of Occupancy is requested before full completion.
Reviewed 2026-08-16 · Source
Requirements
- No distinct change-of-use or CO-only application exists; a change of occupancy/use in an existing commercial building is processed as a Commercial Tenant Improvement Permit Application — the same permit product used for minor improvements to existing commercial buildings for new or existing tenants
- Commercial applicants must receive Development Standards Requirements approval from Planning & Zoning before submitting for construction
- A licensed contractor is required on all commercial projects; plans require an Arizona Registered Design Professional's seal (one set requires an original wet seal) unless exempt under A.R.S. §32-144
- Valuation for tenant improvement/change-of-use work is based on the bid price provided by a licensed commercial contractor
- A deposit is due at submittal, equal to the sum of applicable plan review fees (Building, Engineering, Fire, Sanitary) plus the Zoning Clearance fee
- A final Certificate of Occupancy is issued as the terminal step of the building permit's inspection sequence ('CERTIFICATE OF OCCUPANCY OR COMPLETION' per the Building Division flow chart) at no separate charge
- A Temporary Certificate of Occupancy (requested before full completion) instead carries a Temporary Issuance Fee, which under the FY2026-27 Fee Schedule escalates by 3-month period rather than being charged once
Required documents
- RequiredCommercial Tenant Improvement Permit Application ChecklistSubmitted through the GovWell One-Stop Permitting Portal; covers project/property/owner/applicant/contractor information and a plot plan sketch
- OptionalDevelopment Standards Approval Letter and Approved Site PlanRequired if the project is subject to Development Standards Review
- RequiredConstruction DocumentsElectronic PDF set (cover sheet, site plan, and applicable architectural/structural/mechanical/plumbing/electrical plans) reflecting the change-of-occupancy scope
- RequiredContractor Bid / Valuation DocumentationLicensed commercial contractor's bid price, used as the valuation basis for the permit and plan review fees
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based, per contractor bid price) | Same Building Permit Fee table as new commercial construction: $47.00 ($1-$500) scaling up to $6,982.00 + $5.25 per additional $1,000 above $1,000,000 | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): all eight Total Valuation tiers compared individually (rows 312-319) and found identical, and the governing valuation… Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): all eight Total Valuation tiers compared individually (rows 312-319) and found identical, and the governing valuation basis at row 396, 'Commercial Alteration/Remodel of Existing Structure (Tenant Improvements) — Valuation Based on Bid Price Provided by a Licensed Commercial Contractor, Plus Applicable Plan Review Fees', is likewise unchanged. |
| Building Plan Review Fee | 65% of the calculated Building Permit Fee | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Building Plan Review Fee — 65% of Bldg Permit Fee' (row 326), no FY2026-27 change recorded. |
| Commercial Zoning Clearance — Remodel/Accessory Structure (if the change of use requires one) | $110.00 (up to 2 structures) + $30.00 per additional structure | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Commercial Remodel \ Accessory structure — $110.00: Up to two (2) Accessory Structures plus $30 for each structure thereafter' (row 298), no FY2026-27 change recorded. |
| Temporary Issuance Fee — Residential Certificate of Occupancy (now charged per 3-month period, not once) | $300.00 for the first 3 months, $300.00 for the second 3-month period, then $600.00 for each 3-month period thereafter up to 18 months, with approval of the Building Official | CHANGED from a one-time charge to an escalating per-period charge. Show full citationHideCHANGED from a one-time charge to an escalating per-period charge. Row 336, 'Temporary Issuance Fee (Residential Certificate of Occupancy)': the 2025-26 column reads '300' and the 2026-27 column reads '$300 1st 3-Months, $300 2nd 3-Month Period, $600 for Each 3-Month Period Therafter up to 18 months, w/ Approval of the Building Official.' A residential TCO carried for the full 18 months therefore now costs $2,400 rather than $300. Applies only if a Temporary CO is requested before full completion; a standard final CO still carries no separate fee. |
| Temporary Issuance Fee — Commercial Certificate of Occupancy (now charged per 3-month period, not once) | $500.00 for the first 3 months, $500.00 for the second 3-month period, $750.00 for the third, $1,000.00 for the fourth, then $1,000.00 per month thereafter up to 18 months, with approval of the Building Official; double the initial Temporary Issuance Fee for moving in without a Temporary Certificate of Occupancy | CHANGED from a one-time charge to an escalating per-period charge, with a new penalty. Show full citationHideCHANGED from a one-time charge to an escalating per-period charge, with a new penalty. Row 337, 'Temporary Issuance Fee (One Time Commercial Certificate of Occupancy)': the 2025-26 column reads '500' and the 2026-27 column reads '$500 1st 3-Months, $500 2nd 3-Month Period, $750 3rd 3-Month Period, $1,000 4th 3-Month Period, $1000 a Month Thereafter up to 18 months w/Approval of the Building Official; Double the Initial Temporary Issuance Fee for Moving in Without a Temporary Certificate of Occupancy.' The 'One Time' wording in the row label is now contradicted by its own rate text. Applies only if a Temporary CO is requested before full completion; a standard final CO still carries no separate fee. |
| Deposit (Commercial Projects) | Equal to Building Plan Review Fees + Engineer Plan Review Fees + Fire Plan Review Fees + Sanitary Plan Review Fees + Zoning Clearance Fees | UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): the 'Commercial Projects' deposit builds from five stacked rows (339-344) — Building Plan Review Fees plus Engineer,… Show full citationHideUNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): the 'Commercial Projects' deposit builds from five stacked rows (339-344) — Building Plan Review Fees plus Engineer, Fire, Sanitary plan review fees plus Zoning Clearance Fees — none of which carries a FY2026-27 change. Due at submittal, non-refundable. |
Sources & verification
Verified against official sources. Last reviewed 2026-08-16.
Fee schedules
Applications & forms
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Camp Verde building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.