This is PermitBase’s published record for Dewey-Humboldt as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Dewey-Humboldt building permits
VerifiedDewey-Humboldt, Arizona — as published 2026-07-06.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Building Permit (New Construction, incl. Single-Family Residence, ADU, Garage/Carport, Room Addition, Manufactured Home)
VerifiedDewey-Humboldt does not split new residential construction into narrowly separate permit types the way some larger cities do — a single Building Permit Application covers new single-family residences, accessory dwelling units, garages, carports, decks, patio covers, room additions, remodels, cell towers, swimming pools, and retaining walls, reviewed against the 2018 IBC/IRC and Town amendments. A separate, similarly-formatted Manufactured Home Permit application applies specifically to manufactured/mobile home placement.
Verified 2026-07-06 · Source
Requirements
- Building permit required for new single-family residence, ADU, garage, carport, deck, patio cover, room addition, remodel, cell tower, swimming pool, or retaining wall construction within Town limits
- MUST have an approved septic permit from Yavapai County BEFORE submitting building plans to the Town — the Town cannot begin plan review until the septic system location and size are known
- Plans must comply with the 2018 IRC/IBC and Town amendments, including the Table R301.2(1) Climatic and Geographic Design Criteria (115 mph wind, Exposure C; Seismic Design Category C; 30 psf roof snow load; 18-inch frost depth; moderate-to-heavy termite potential)
- For projects not exempt under A.R.S. § 32-1121, the contractor must hold a current, valid Arizona ROC license (verify at roc.az.gov/licensing); Owner-Builder projects must certify compliance with A.R.S. § 32-1121(A)(5) (sole owner occupancy, not for sale/rent within 1 year) or § 32-1121(A)(6) (Owner-Developer contracting with a licensed General Contractor)
- Submittal checklist (varies slightly by scope) includes: signed Building Permit Application, 2 sets of full construction plans, 2 AZ-stamped truss calculations (where applicable), 1 Plot Plan (8.5"x11"), 2 Site Plans (18"x24" minimum), Affidavit of Site Soil / Soils Report, Directions to Site, Residential Outdoor Lighting compliance, and a deposit/one-time fee
- Permit becomes invalid 2 years after issuance; work must commence within 180 days and inspections must occur at least every 180 days or the permit becomes null and void (one 180-day extension available at Building Official's discretion)
Required documents
- RequiredBuilding Permit ApplicationTown of Dewey-Humboldt Building Permit Application (Community Development), submitted by mail or in person at 2735 S. Highway 69, Suite 12, Humboldt, AZ 86329 or PO Box 69
- RequiredPlot Plan Sketch and Affidavit (8.5"x11")Town-provided form; must show all structures, dimensions, setbacks, easements, road cuts, and watercourses within 50/100/200 ft as applicable; must be drawn to scale in black ink
- RequiredSite Plan (18"x24" minimum)Required for Residential Building Permit and Manufactured Home Permit (not required for Solar or OTC permits); shows grades, pad elevations, drainage, cut/fill, septic/leach details
- Required2 Sets of Full Construction PlansRequired for Residential Building and Solar/Grading permits
- Required2 AZ-Stamped Truss CalculationsRequired for Residential Building Permit only
- RequiredApproved Yavapai County Septic PermitMust be obtained and attached BEFORE the Town will begin plan review; Yavapai County may take 4-6 weeks during peak season
- RequiredAffidavit of Site Soil / Soils ReportRequired for Residential Building Permit and Manufactured Home Permit given expansive/shifting soil conditions common in the area
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Per Yavapai County Valuation and Fee Schedule (pass-through fee, based on project valuation/square footage), PLUS a Town Building Permit Administration fee of 42% of the calculated building permit fee | Dewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules; Show full citationHideDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules; the exact current dollar figures live in Yavapai County's own Building Safety valuation table, which the Town's live site returned an HTTP 403 on direct fetch and has no confirmed Wayback Machine snapshot as of this verification — contact the Town at 928-632-7362 with project valuation details for a probable fee quote, per the Town's own FAQ guidance |
| Single-Family Residential Building Plan Review Fee | Per Yavapai County Valuation and Fee Schedule (pass-through fee), PLUS a Town Building Plan Review Administration fee of 42% of the calculated plan review fee | Dewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules |
| All Other (non-single-family) Building Plan Review Fee | Actual cost of professional services and materials, PLUS 42% Town administration fee on the plan review fee | Dewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules |
Over-the-Counter (OTC) Permit — Electrical, Plumbing, Mechanical, Demolition
VerifiedDewey-Humboldt does not issue separate electrical, plumbing, mechanical, or demolition permit applications — all four are filed under a single 'Over-the-Counter (OTC) Permit' application/checklist, distinct from the full Residential Building Permit track. The OTC application itself lists 'Demo / Plumbing / Electric / Mechanical / Other' as checkable permit-type boxes on one form.
Verified 2026-07-06 · Source
Requirements
- OTC Permit covers: demolition, plumbing work, electrical work, and mechanical (HVAC) work — each selected via checkbox on the same application form
- Governed by the applicable adopted code chapter (Electrical Code § 150.07 referencing the NEC as adopted by the Town; Plumbing Code § 150.04; Mechanical Code § 150.05; Fuel Gas provisions within the adopted IRC Chapter 24 as amended)
- For projects not exempt under A.R.S. § 32-1121, the contractor must hold a current, valid Arizona ROC license
- Septic permit prerequisite (Yavapai County) applies only where the scope of work is connected to septic-relevant plumbing; the OTC checklist does not universally require it the way the full Building/Manufactured Home Permit checklist does
- Submittal checklist for OTC ('Elec, Plumb, Mech') requires: signed permit application, 1 Plot Plan (8.5"x11"), and a deposit — full construction plan sets, truss calcs, and site plans are NOT required for this track (those apply only to Residential Building, Manufactured Home, and Solar/Grading permits per the Town's own checklist matrix)
Required documents
- RequiredOver-the-Counter (OTC) Permit ApplicationSingle Town form covering Demo, Plumbing, Electric, and Mechanical work via checkbox selection; submitted at the Community Development office or by mail
- RequiredPlot Plan Sketch and Affidavit (8.5"x11")Required for OTC permits per the Town's submission checklist
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| OTC Permit Fee (Electrical/Plumbing/Mechanical/Demolition) | Per Yavapai County Valuation and Fee Schedule (pass-through fee) PLUS 42% Town administration fee | Dewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules — same fee mechanism applies to all building-code-governed permits Town-wide; no separately itemized flat OTC fee schedule was found on the Town's public site |
Solar Permit
VerifiedRequired for residential and other solar photovoltaic installations in Dewey-Humboldt, using a dedicated Solar Permit Application distinct from the general Building Permit and OTC forms.
Verified 2026-07-06 · Source
Requirements
- Solar Permit Application distinguishes Residential / Other / Labor Only project types, each with its own valuation entry
- Governed by the National Electrical Code as adopted by the Town (§ 150.07) and the 2018 IBC/IRC structural provisions for roof-mounted or ground-mounted arrays
- A copy of the county septic approval must be attached per the printed form instruction (NOTE: this requirement is printed on the Solar Permit Application template itself, even though septic relevance to a solar-only project may not always apply — likely a shared template carried over from the Building Permit form; confirm applicability with Building Safety for solar-only, no-septic-impact projects)
- For projects not exempt under A.R.S. § 32-1121, the contractor must hold a current, valid Arizona ROC license
- Submittal checklist ('Solar Permit' column) requires: signed application, 2 sets of full construction plans, 1 Plot Plan (8.5"x11"), Affidavit of Site Soil/Soils Report, Directions to Site (possibly), and a deposit — no separate site plan or truss calculations required
Required documents
- RequiredSolar Permit ApplicationTown of Dewey-Humboldt dedicated Solar Permit Application (Community Development), distinguishing Residential / Other / Labor Only
- Required2 Sets of Full Construction PlansRequired for Solar Permit per the Town's submission checklist matrix
- RequiredPlot Plan Sketch and Affidavit (8.5"x11")Required for Solar Permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Permit Fee | Per Yavapai County Valuation and Fee Schedule (pass-through fee, based on declared project valuation) PLUS 42% Town administration fee | Dewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules; no separate flat solar-specific fee line was found published on the Town's site — the Solar Permit Application itself has a blank valuation field rather than a pre-printed flat fee |
Grading Permit
VerifiedRequired for site excavation, fill, and grading work in Dewey-Humboldt under the Town's own locally authored Grading Ordinance Code (§ 150.08) rather than an ICC model code, often paired with a Residential Building Permit for new construction involving significant site work.
Verified 2026-07-06 · Source
Requirements
- Grading Permit required for excavation, fill, and site grading meeting the Town Grading Ordinance's thresholds
- Governed by the Dewey-Humboldt Grading Ordinance Code (§ 150.08), a locally authored code (not an adopted ICC model code) specific to the Town
- Submittal checklist ('Grading Permit' column) requires: signed application, 2 sets of full construction plans, 1 Plot Plan, 2 Site Plans (18"x24" min), Affidavit of Site Soil/Soils Report, Directions to Site (possibly), and a deposit
- Slope information (high/low points, direction and percent/feet of elevation change) must be shown on the site plan per the Town's Plot Plan/Site Plan instructions
Required documents
- RequiredGrading Permit / Building Permit ApplicationGrading is requested via the same permit-application family as the Building Permit, selecting the grading scope; the Town's Printable Forms page lists a standalone Grading Permit form
- RequiredSite Plan (18"x24" minimum)Must show existing/proposed grades, building pad elevations at all corners, finished floor elevations, drainage, and cut/fill amounts
- RequiredAffidavit of Site Soil / Soils ReportRequired given expansive/shifting soil conditions noted in Town amendments to IRC § R401.4
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Grading Permit Fee | Per Yavapai County Valuation and Fee Schedule (pass-through fee) PLUS 42% Town administration fee | Dewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules — same Town-wide fee mechanism; Show full citationHideDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules — same Town-wide fee mechanism; note the separate Yavapai County Development Services (Planning/Zoning) fee schedule lists an unrelated 'Grading, Supplemental with Footprint Change, Cell Sites/Co-Location, Ground Mount Solar with Foundation' zoning-clearance fee of $100, which is a DIFFERENT fee (zoning clearance, not the building-code grading permit) — do not conflate the two |
Zoning Clearance Permit
VerifiedRequired for work exempt from a full Building Permit (small accessory structures, fences, retaining walls, ground water tanks, driveways) as well as any structure requiring zoning setback/compliance confirmation, per the Town's own FAQ on Building Permit exemptions.
Verified 2026-07-06 · Source
Requirements
- Required for building-permit-exempt work: one-story detached accessory structures under 400 sq ft, fences 6 ft or under, retaining walls 4 ft or under (from bottom of footing), ground water tanks 5,000 gallons or under, and certain sidewalks/driveways
- Confirms zoning compliance (setbacks, lot coverage, use) even where no building-code review is triggered
- Submittal checklist ('Zoning Clearance Permit' column) requires: signed application, 1 Plot Plan (8.5"x11"), and a deposit — same lightweight documentation tier as the OTC permit
Required documents
- RequiredZoning Clearance ApplicationTown of Dewey-Humboldt Zoning Clearance Application (fillable version available on Printable Forms page)
- RequiredPlot Plan Sketch and Affidavit (8.5"x11")Required for Zoning Clearance Permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Zoning Clearance Permit Fee | Approximately $15 per item, per the Town's FAQ description of building-permit-exempt work requiring a Zoning Clearance Permit | Figure sourced from the Town's own FAQ narrative on building-permit exemptions (dhaz.gov/Faq.aspx?QID=177); Show full citationHideFigure sourced from the Town's own FAQ narrative on building-permit exemptions (dhaz.gov/Faq.aspx?QID=177); reconfirm the current exact dollar amount directly with the Building Safety office (928-632-7362), as no standalone current fee-schedule line item for 'Zoning Clearance' specific to the Town (as opposed to Yavapai County's own $200 unincorporated-area zoning clearance fee, which does NOT apply within Town limits) was independently located on a live Town fee-schedule page |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dewey-Humboldt building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.