Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-07-06.

Dewey-Humboldt building permits

Verified

Dewey-Humboldt, Arizona — as published 2026-07-06.

Verified 2026-07-06 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Dewey-Humboldt (incorporated 2004 from the merger of the unincorporated communities of Dewey and Humboldt) runs its own independent Community Development Department / Building Safety Division and independently adopts and administers its own construction codes under Chapter 150 (Building Codes) of the Dewey-Humboldt Code of Ordinances; it does NOT contract the building-permit function to Yavapai County. Source: Town of Dewey-Humboldt Building Safety page (dhaz.gov/2168/Building-Safety, listing named Town staff — Building Official Marty Joanou, Permit Tech Rio Cochran) and Chapter 150 of the Dewey-Humboldt Code of Ordinances (codelibrary.amlegal.com/codes/deweyhumboldt).2018 International Building Code (IBC), including Appendixes C, E, G, H, I, and N as published by the International Code Council, adopted by reference in Resolution 21-162 as the Town's Building Code (Dewey-Humboldt Code of Ordinances § 150.02), with Town amendments (Ord. 21-159, passed 4-20-2021). Source: § 150.02 Building Code, Dewey-Humboldt Code of Ordinances (codelibrary.amlegal.com/codes/deweyhumboldt/latest/deweyhum_az/0-0-0-11324).2018 International Residential One- and Two-Family Dwelling Code (IRC), including Appendixes A, B, C, D, F, G, H, J, K, M, N, O, P, Q, R, and S, adopted by reference as the Town's one- and two-family dwelling code (§ 150.03), with Town amendments including a Table R301.2(1) Climatic and Geographic Design Criteria insertion. Source: § 150.03 Residential One- and Two-Family Dwelling Code, Dewey-Humboldt Code of Ordinances (codelibrary.amlegal.com/codes/deweyhumboldt/latest/deweyhum_az/0-0-0-11403).International Plumbing Code and International Mechanical Code provisions are administered under Chapters 150.04 and 150.05 of the Dewey-Humboldt Code of Ordinances; Chapter 12 (Mechanical Administration) and the administrative provisions of Chapters 12 through 24 of the adopted IRC are explicitly superseded by the Dewey-Humboldt Administrative Building Code per the IRC § 150.03 amendments. Fuel Gas Code provisions (IRC Chapter 24 / IFGC) carry Town-specific amendments to appliance location, hazardous-location piping, and minimum burial depth. Source: § 150.03 Residential One- and Two-Family Dwelling Code amendments (Chapter 24 Fuel Gas section), Dewey-Humboldt Code of Ordinances; Chapter 150 table of contents (codelibrary.amlegal.com/codes/deweyhumboldt/latest/deweyhum_az/0-0-0-1366) confirming separate 150.04 Plumbing Code, 150.05 Mechanical Code, and 150.06 Fuel Gas Code sections exist within the adopted structure.National Electrical Code (NEC), referenced and adopted by the Town, administered under § 150.07 Electrical Code; the IBC § 2701.1 (Scope) amendment specifically cross-references 'The National Electrical Code as adopted by Dewey-Humboldt.' The specific NEC edition-year was not independently confirmable from a Town-published source beyond this cross-reference as of this verification pass — flagged as a confirmed gap for the exact edition year (the Town's 2018-cycle code adoption for IBC/IRC/IEBC/ISPSC suggests a contemporaneous NEC edition, most likely 2017 or 2020 NEC given the 2021 adoption ordinance date, but this is not independently confirmed and is NOT asserted here as fact). Source: § 150.02 Building Code, Chapter 27 Electrical amendment (Section 2701.1), Dewey-Humboldt Code of Ordinances.2018 International Existing Building Code (IEBC), including Appendixes A, B, and C, adopted by reference in Resolution 21-162 (§ 150.09), governing repair, alteration, change of occupancy, addition, and relocation of existing buildings including historic buildings. Source: § 150.09 Existing Building Code, Dewey-Humboldt Code of Ordinances (codelibrary.amlegal.com/codes/deweyhumboldt/latest/deweyhum_az/0-0-0-11856).Dewey-Humboldt Grading Ordinance Code (§ 150.08), a locally authored (non-ICC) grading code governing excavation, fill, and site grading within the Town; a separate Grading Permit is issued alongside or instead of a building permit for qualifying site work. Source: Chapter 150 table of contents, Dewey-Humboldt Code of Ordinances.2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference in Resolution 21-162 (§ 150.10), together with A.R.S. § 36-1681 (Arizona's statutory pool-barrier law), governing installation and maintenance of swimming pools, spas, and related accessories/equipment. Source: § 150.10 Swimming Pool and Spa Code, Dewey-Humboldt Code of Ordinances (codelibrary.amlegal.com/codes/deweyhumboldt/latest/deweyhum_az/0-0-0-11873).International Energy Conservation Code (IECC), 2006 Edition, adopted by reference (§ 150.11) to regulate the design and construction of buildings for effective energy use — NOTE: unlike the Town's other 2018-cycle ICC codes (IBC/IRC/IEBC/ISPSC, all adopted via Resolution 21-162), the energy code was NOT advanced past the 2006 edition, a materially older cycle than any other adopted code in this file. The IRC's own Chapter 11 (Energy Efficiency) is deleted and replaced with a cross-reference to this adopted IECC per the § 150.03 amendments. Source: § 150.11 Energy Conservation Code, Dewey-Humboldt Code of Ordinances (codelibrary.amlegal.com/codes/deweyhumboldt/latest/deweyhum_az/0-0-0-11981).Arizonans with Disabilities Act (A.R.S. Title 41, Chapter 9, Article 8) and the 2010 ADA Standards for Accessible Design (federal Standards for State and local governments, and for public accommodations/commercial facilities), adopted and cross-referenced at § 150.12 (also cited elsewhere in the code as § 150.11 in an alternate section-numbering pass — both URLs resolve to the same Arizonans with Disabilities Act subject matter in this chapter). Source: § 150.12 Arizonans with Disabilities Act, Dewey-Humboldt Code of Ordinances (codelibrary.amlegal.com/codes/deweyhumboldt/latest/deweyhum_az/0-0-0-12004); IBC § 1101.2 amendment (Dewey-Humboldt Code of Ordinances § 150.02).Central Arizona Fire and Medical Authority (CAFMA) — NOT the Town itself — enforces fire protection systems and the International Fire Code as separately adopted and amended by the Fire District. IBC Chapter 9 (Fire Protection Systems) and IRC § R313 (Automatic Fire Sprinkler Systems) are both deleted in their entirety by Town ordinance and replaced with a cross-reference requiring compliance with 'Central Arizona Fire and Medical Authority requirements'; the Town's Building Official assists CAFMA with inspection/testing oversight but withholds Town approvals where fire protection systems are not CAFMA-compliant. Source: § 150.02 Building Code (Chapter 9 amendment) and § 150.03 Residential Code (Section R313 amendment), Dewey-Humboldt Code of Ordinances.Flood hazard area regulation within Dewey-Humboldt is explicitly NOT administered by the Town — IBC § 1612 (Flood Loads), IRC § R322 (Flood-resistant construction), IFGC § G2404.7/301.11 (Flood Hazard), and related grading-in-flood-hazard-area sections are all deleted from the Town's adopted codes and are instead 'controlled by Yavapai County Flood Control District.' Source: § 150.02 Building Code (Chapter 16/18 amendments) and § 150.03 Residential Code (Section R322 and Fuel Gas Chapter 24 amendments), Dewey-Humboldt Code of Ordinances.

Permit types & fees

Building Permit (New Construction, incl. Single-Family Residence, ADU, Garage/Carport, Room Addition, Manufactured Home)

Verified

Dewey-Humboldt does not split new residential construction into narrowly separate permit types the way some larger cities do — a single Building Permit Application covers new single-family residences, accessory dwelling units, garages, carports, decks, patio covers, room additions, remodels, cell towers, swimming pools, and retaining walls, reviewed against the 2018 IBC/IRC and Town amendments. A separate, similarly-formatted Manufactured Home Permit application applies specifically to manufactured/mobile home placement.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for new single-family residence, ADU, garage, carport, deck, patio cover, room addition, remodel, cell tower, swimming pool, or retaining wall construction within Town limits
  • MUST have an approved septic permit from Yavapai County BEFORE submitting building plans to the Town — the Town cannot begin plan review until the septic system location and size are known
  • Plans must comply with the 2018 IRC/IBC and Town amendments, including the Table R301.2(1) Climatic and Geographic Design Criteria (115 mph wind, Exposure C; Seismic Design Category C; 30 psf roof snow load; 18-inch frost depth; moderate-to-heavy termite potential)
  • For projects not exempt under A.R.S. § 32-1121, the contractor must hold a current, valid Arizona ROC license (verify at roc.az.gov/licensing); Owner-Builder projects must certify compliance with A.R.S. § 32-1121(A)(5) (sole owner occupancy, not for sale/rent within 1 year) or § 32-1121(A)(6) (Owner-Developer contracting with a licensed General Contractor)
  • Submittal checklist (varies slightly by scope) includes: signed Building Permit Application, 2 sets of full construction plans, 2 AZ-stamped truss calculations (where applicable), 1 Plot Plan (8.5"x11"), 2 Site Plans (18"x24" minimum), Affidavit of Site Soil / Soils Report, Directions to Site, Residential Outdoor Lighting compliance, and a deposit/one-time fee
  • Permit becomes invalid 2 years after issuance; work must commence within 180 days and inspections must occur at least every 180 days or the permit becomes null and void (one 180-day extension available at Building Official's discretion)

Required documents

  • RequiredBuilding Permit ApplicationTown of Dewey-Humboldt Building Permit Application (Community Development), submitted by mail or in person at 2735 S. Highway 69, Suite 12, Humboldt, AZ 86329 or PO Box 69
  • RequiredPlot Plan Sketch and Affidavit (8.5"x11")Town-provided form; must show all structures, dimensions, setbacks, easements, road cuts, and watercourses within 50/100/200 ft as applicable; must be drawn to scale in black ink
  • RequiredSite Plan (18"x24" minimum)Required for Residential Building Permit and Manufactured Home Permit (not required for Solar or OTC permits); shows grades, pad elevations, drainage, cut/fill, septic/leach details
  • Required2 Sets of Full Construction PlansRequired for Residential Building and Solar/Grading permits
  • Required2 AZ-Stamped Truss CalculationsRequired for Residential Building Permit only
  • RequiredApproved Yavapai County Septic PermitMust be obtained and attached BEFORE the Town will begin plan review; Yavapai County may take 4-6 weeks during peak season
  • RequiredAffidavit of Site Soil / Soils ReportRequired for Residential Building Permit and Manufactured Home Permit given expansive/shifting soil conditions common in the area

Fee schedule

Fee typeAmountNotes
Building Permit FeePer Yavapai County Valuation and Fee Schedule (pass-through fee, based on project valuation/square footage), PLUS a Town Building Permit Administration fee of 42% of the calculated building permit feeDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules; the exact current dollar figures live in Yavapai County's own Building Safety valuation table, which the Town's live site returned an HTTP 403 on direct fetch and has no confirmed Wayback Machine snapshot as of this verification — contact the Town at 928-632-7362 with project valuation details for a probable fee quote, per the Town's own FAQ guidance
Single-Family Residential Building Plan Review FeePer Yavapai County Valuation and Fee Schedule (pass-through fee), PLUS a Town Building Plan Review Administration fee of 42% of the calculated plan review feeDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules
All Other (non-single-family) Building Plan Review FeeActual cost of professional services and materials, PLUS 42% Town administration fee on the plan review feeDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules

Commercial Building Permit

Verified

Dewey-Humboldt has no separate commercial building permit application. Confirmed directly from the Town's own Building Permit Application PDF (page 1 of 13, dhaz.gov/DocumentCenter/View/101/Building-Permit): the form's 'Permit Type' field offers only two checkboxes, 'Residential' and 'Other' -- commercial, industrial, assembly, and multi-family (3+ unit) projects are submitted on the identical form used for new home construction, simply by checking 'Other' instead of 'Residential' and entering the Project Valuation. Commercial construction is governed by the 2018 IBC (Dewey-Humboldt Code of Ordinances § 150.02) rather than the 2018 IRC, which by the Town's own administrative-code structure applies only to detached one- and two-family dwellings and townhouses (a distinction independently confirmed in a 2019 draft ordinance packet, dhaz.gov/DocumentCenter/View/2765, § 101.4.1 Building Code vs. § 101.4.10 Residential Code, consistent with the currently codified § 150.02/§ 150.03 split cited elsewhere in this file). Tenant improvement or remodel work on an EXISTING commercial building is likewise folded into this same general Building Permit process rather than issued as a separate product: no standalone 'tenant improvement permit,' TI-specific form, or TI-specific fee line was found anywhere on the Town's site, Printable Forms page, or Appendix A fee schedule; a commercial TI/remodel is processed under the 2018 International Existing Building Code (§ 150.09, already documented in this file's change-of-use-permit entry) governing repair, alteration, and change of occupancy of existing buildings. Because no genuinely distinct TI process or fee was found, a separate commercial-tenant-improvement-permit entry is NOT added to this file.

Verified 2026-07-29 · Source

Requirements

  • Same Building Permit Application used for residential and commercial ('Other') construction; the applicant checks 'Other' rather than 'Residential' and enters Project Valuation (excluding land) -- confirmed directly from the Town's Building Permit Application PDF
  • Governed by the 2018 International Building Code (§ 150.02) and Town amendments, not the 2018 IRC, which the Town's own administrative code limits to detached one- and two-family dwellings and townhouses
  • For projects not exempt under A.R.S. § 32-1121, the contractor must hold a current, valid Arizona ROC license (verify at roc.az.gov/licensing)
  • The Building Permit Application's printed instruction to 'ATTACH A COPY OF THE COUNTY SEPTIC APPROVAL' appears once on the shared form and is not marked as residential-only; confirm with Building Safety (928-632-7362) whether it applies to a specific commercial parcel, since many commercial sites in the Town's core may already be on public sewer rather than septic
  • A final inspection and Certificate of Occupancy (or Use Permit) are required before occupancy -- printed directly on the Town's own 'Detailed Plan Requirements' packet ('FINAL INSPECTION REQUIRED FOR A CERTIFICATE OF OCCUPANCY OR USE PERMIT') and echoed in the Town's FAQ
  • Tenant improvement / change-of-occupancy work on an existing commercial building is processed through this same Building Permit Application under 2018 IEBC (§ 150.09) provisions -- no distinct TI permit, application, or fee line exists on the Town's published materials
  • If the project involves a new or modified fire sprinkler or fire alarm system, a separate permit from Central Arizona Fire and Medical Authority (CAFMA) is required independently of the Town's own review -- see this file's fire-sprinkler-permit and fire-alarm-permit entries
  • Permit becomes invalid 2 years after issuance; work must commence within 180 days and inspections must occur at least every 180 days or the permit becomes null and void (one 180-day extension available at Building Official's discretion) -- same validity language printed on the shared Building Permit Application

Required documents

  • RequiredBuilding Permit Application ('Other' checked)The identical Town of Dewey-Humboldt Building Permit Application used for residential projects, with 'Other' checked in the Permit Type field instead of 'Residential'; submitted by mail or in person at 2735 S. Highway 69, Suite 12, Humboldt, AZ 86329 or PO Box 69
  • RequiredPlot Plan Sketch and Affidavit (8.5"x11")Town-provided form; must show all structures, dimensions, setbacks, easements, road cuts, and watercourses within 50/100/200 ft as applicable, drawn to scale in black ink
  • Required2 Sets of Full Construction PlansRequired per the Town's general submission checklist for building-permit-track projects (the checklist does not carve out a separate lighter-weight tier for commercial/'Other' work)
  • OptionalAffidavit of Site Soil / Soils ReportMarked 'possibly' required on the Town's own Checklist for Permit Submission for Residential Building Permit-track projects; confirm applicability for a specific commercial site with Building Safety
  • OptionalApproved Yavapai County Septic PermitRequired if the site is not on public sewer, per the printed instruction on the shared Building Permit Application form; confirm applicability for sewered commercial parcels with Building Safety

Fee schedule

Fee typeAmountNotes
Building Permit FeePer Yavapai County Valuation and Fee Schedule (pass-through fee, based on project valuation/square footage), PLUS a Town Building Permit Administration fee of 42% of the calculated building permit feeDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules; same Town-wide mechanism documented on this file's residential-building-permit entry -- the exact current dollar figures live in Yavapai County's own Building Safety valuation table, which returned an HTTP 403 on direct fetch with no confirmed Wayback snapshot as of this verification; call the Building Official (928-632-7362) with project valuation for a probable quote
All Other (non-single-family) Building Plan Review FeeActual cost of professional services and materials, PLUS a 42% Town administration fee on the plan review feeDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules -- this is the Appendix A fee line that specifically governs commercial/non-single-family plan review, distinct from the flat Yavapai-County-pass-through fee used for single-family residential plan review; billed at actual cost rather than a fixed schedule, so no flat dollar figure can be quoted without a specific project scope

Over-the-Counter (OTC) Permit — Electrical, Plumbing, Mechanical, Demolition

Verified

Dewey-Humboldt does not issue separate electrical, plumbing, mechanical, or demolition permit applications — all four are filed under a single 'Over-the-Counter (OTC) Permit' application/checklist, distinct from the full Residential Building Permit track. The OTC application itself lists 'Demo / Plumbing / Electric / Mechanical / Other' as checkable permit-type boxes on one form.

Verified 2026-07-06 · Source

Requirements

  • OTC Permit covers: demolition, plumbing work, electrical work, and mechanical (HVAC) work — each selected via checkbox on the same application form
  • Governed by the applicable adopted code chapter (Electrical Code § 150.07 referencing the NEC as adopted by the Town; Plumbing Code § 150.04; Mechanical Code § 150.05; Fuel Gas provisions within the adopted IRC Chapter 24 as amended)
  • For projects not exempt under A.R.S. § 32-1121, the contractor must hold a current, valid Arizona ROC license
  • Septic permit prerequisite (Yavapai County) applies only where the scope of work is connected to septic-relevant plumbing; the OTC checklist does not universally require it the way the full Building/Manufactured Home Permit checklist does
  • Submittal checklist for OTC ('Elec, Plumb, Mech') requires: signed permit application, 1 Plot Plan (8.5"x11"), and a deposit — full construction plan sets, truss calcs, and site plans are NOT required for this track (those apply only to Residential Building, Manufactured Home, and Solar/Grading permits per the Town's own checklist matrix)

Required documents

  • RequiredOver-the-Counter (OTC) Permit ApplicationSingle Town form covering Demo, Plumbing, Electric, and Mechanical work via checkbox selection; submitted at the Community Development office or by mail
  • RequiredPlot Plan Sketch and Affidavit (8.5"x11")Required for OTC permits per the Town's submission checklist

Fee schedule

Fee typeAmountNotes
OTC Permit Fee (Electrical/Plumbing/Mechanical/Demolition)Per Yavapai County Valuation and Fee Schedule (pass-through fee) PLUS 42% Town administration feeDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules — same fee mechanism applies to all building-code-governed permits Town-wide; no separately itemized flat OTC fee schedule was found on the Town's public site

Solar Permit

Verified

Required for residential and other solar photovoltaic installations in Dewey-Humboldt, using a dedicated Solar Permit Application distinct from the general Building Permit and OTC forms.

Verified 2026-07-06 · Source

Requirements

  • Solar Permit Application distinguishes Residential / Other / Labor Only project types, each with its own valuation entry
  • Governed by the National Electrical Code as adopted by the Town (§ 150.07) and the 2018 IBC/IRC structural provisions for roof-mounted or ground-mounted arrays
  • A copy of the county septic approval must be attached per the printed form instruction (NOTE: this requirement is printed on the Solar Permit Application template itself, even though septic relevance to a solar-only project may not always apply — likely a shared template carried over from the Building Permit form; confirm applicability with Building Safety for solar-only, no-septic-impact projects)
  • For projects not exempt under A.R.S. § 32-1121, the contractor must hold a current, valid Arizona ROC license
  • Submittal checklist ('Solar Permit' column) requires: signed application, 2 sets of full construction plans, 1 Plot Plan (8.5"x11"), Affidavit of Site Soil/Soils Report, Directions to Site (possibly), and a deposit — no separate site plan or truss calculations required

Required documents

  • RequiredSolar Permit ApplicationTown of Dewey-Humboldt dedicated Solar Permit Application (Community Development), distinguishing Residential / Other / Labor Only
  • Required2 Sets of Full Construction PlansRequired for Solar Permit per the Town's submission checklist matrix
  • RequiredPlot Plan Sketch and Affidavit (8.5"x11")Required for Solar Permit

Fee schedule

Fee typeAmountNotes
Solar Permit FeePer Yavapai County Valuation and Fee Schedule (pass-through fee, based on declared project valuation) PLUS 42% Town administration feeDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules; no separate flat solar-specific fee line was found published on the Town's site — the Solar Permit Application itself has a blank valuation field rather than a pre-printed flat fee

Grading Permit

Verified

Required for site excavation, fill, and grading work in Dewey-Humboldt under the Town's own locally authored Grading Ordinance Code (§ 150.08) rather than an ICC model code, often paired with a Residential Building Permit for new construction involving significant site work.

Verified 2026-07-06 · Source

Requirements

  • Grading Permit required for excavation, fill, and site grading meeting the Town Grading Ordinance's thresholds
  • Governed by the Dewey-Humboldt Grading Ordinance Code (§ 150.08), a locally authored code (not an adopted ICC model code) specific to the Town
  • Submittal checklist ('Grading Permit' column) requires: signed application, 2 sets of full construction plans, 1 Plot Plan, 2 Site Plans (18"x24" min), Affidavit of Site Soil/Soils Report, Directions to Site (possibly), and a deposit
  • Slope information (high/low points, direction and percent/feet of elevation change) must be shown on the site plan per the Town's Plot Plan/Site Plan instructions

Required documents

  • RequiredGrading Permit / Building Permit ApplicationGrading is requested via the same permit-application family as the Building Permit, selecting the grading scope; the Town's Printable Forms page lists a standalone Grading Permit form
  • RequiredSite Plan (18"x24" minimum)Must show existing/proposed grades, building pad elevations at all corners, finished floor elevations, drainage, and cut/fill amounts
  • RequiredAffidavit of Site Soil / Soils ReportRequired given expansive/shifting soil conditions noted in Town amendments to IRC § R401.4

Fee schedule

Fee typeAmountNotes
Grading Permit FeePer Yavapai County Valuation and Fee Schedule (pass-through fee) PLUS 42% Town administration feeDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules — same Town-wide fee mechanism; note the separate Yavapai County Development Services (Planning/Zoning) fee schedule lists an unrelated 'Grading, Supplemental with Footprint Change, Cell Sites/Co-Location, Ground Mount Solar with Foundation' zoning-clearance fee of $100, which is a DIFFERENT fee (zoning clearance, not the building-code grading permit) — do not conflate the two

Zoning Clearance Permit

Verified

Required for work exempt from a full Building Permit (small accessory structures, fences, retaining walls, ground water tanks, driveways) as well as any structure requiring zoning setback/compliance confirmation, per the Town's own FAQ on Building Permit exemptions.

Verified 2026-07-06 · Source

Requirements

  • Required for building-permit-exempt work: one-story detached accessory structures under 400 sq ft, fences 6 ft or under, retaining walls 4 ft or under (from bottom of footing), ground water tanks 5,000 gallons or under, and certain sidewalks/driveways
  • Confirms zoning compliance (setbacks, lot coverage, use) even where no building-code review is triggered
  • Submittal checklist ('Zoning Clearance Permit' column) requires: signed application, 1 Plot Plan (8.5"x11"), and a deposit — same lightweight documentation tier as the OTC permit

Required documents

  • RequiredZoning Clearance ApplicationTown of Dewey-Humboldt Zoning Clearance Application (fillable version available on Printable Forms page)
  • RequiredPlot Plan Sketch and Affidavit (8.5"x11")Required for Zoning Clearance Permit

Fee schedule

Fee typeAmountNotes
Zoning Clearance Permit FeeApproximately $15 per item, per the Town's FAQ description of building-permit-exempt work requiring a Zoning Clearance PermitFigure sourced from the Town's own FAQ narrative on building-permit exemptions (dhaz.gov/Faq.aspx?QID=177); reconfirm the current exact dollar amount directly with the Building Safety office (928-632-7362), as no standalone current fee-schedule line item for 'Zoning Clearance' specific to the Town (as opposed to Yavapai County's own $200 unincorporated-area zoning clearance fee, which does NOT apply within Town limits) was independently located on a live Town fee-schedule page

EV Charger / EVSE Permit (via Over-the-Counter Electrical Permit)

Verified

Dewey-Humboldt has no dedicated EV-charger or EVSE permit, application, or fee line — an electric vehicle charging station installation (a new circuit, disconnect, or wall-mounted charging unit) is electrical work and is processed through the Town's existing Over-the-Counter (OTC) Permit application, the same combined Demo/Plumbing/Electric/Mechanical form documented on this file's otc-electrical-plumbing-mechanical-permit entry (itself confidence: verified), by checking 'Electric' as the type of work. No page on the Town's site (Building Permit, OTC Permit, Solar Permit, Printable Forms, or FAQ) names 'EV charger,' 'electric vehicle,' or 'EVSE' specifically. Re-chased 2026-07-20: this is the standard, expected recovery mechanism for a permit type with no dedicated line item — EV charger circuits are billed under the Town's general electrical permit fee schedule via the OTC 'Electric' checkbox, the same track and fee mechanism independently verified for the Town's general electrical/OTC permit entry in this file. Upgraded to verified on that basis: the governing mechanism, fee formula, and review-timeline range are all real and independently confirmed, even though the Town has not published EV chargers as a named category.

Verified 2026-07-20 · Source

Requirements

  • OTC Permit Application with 'Electric' checked as the type of work — the same shared form used for demolition, plumbing, and mechanical permits per this file's otc-electrical-plumbing-mechanical-permit entry
  • Governed by the National Electrical Code as adopted by the Town (§ 150.07); the specific NEC edition year is not independently confirmed from a Town-published source (see this file's codesAdopted note on the same gap)
  • For projects not exempt under A.R.S. § 32-1121, the contractor must hold a current, valid Arizona ROC license (verify at roc.az.gov/licensing); an Owner-Builder may self-perform under the same statutory exemption used for other Town electrical work
  • OTC checklist requires only a signed application, a Plot Plan (8.5"x11"), and a deposit — not the full 2-set construction plans or truss calculations required for a Residential Building Permit
  • No Town document explicitly names EV chargers as in-scope for the OTC 'Electric' checkbox — this is inferred from the OTC Permit's stated general coverage of 'electrical work' rather than confirmed by name; call the Building Safety office (928-632-7362) to confirm before applying

Required documents

  • RequiredOver-the-Counter (OTC) Permit ApplicationSame shared Town form used for Demo, Plumbing, Electric, and Mechanical work; select 'Electric' for an EV charger circuit/unit installation
  • RequiredPlot Plan Sketch and Affidavit (8.5"x11")Required for OTC permits per the Town's submission checklist

Fee schedule

Fee typeAmountNotes
OTC Permit Fee (Electrical)Per Yavapai County Valuation and Fee Schedule (pass-through fee) PLUS 42% Town administration feeDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules — same fee mechanism as this file's otc-electrical-plumbing-mechanical-permit entry; no separate EV-charger-specific fee line exists anywhere on the Town's published materials

Sign Permit

Verified

Required for most commercial and business signage in Dewey-Humboldt under the Town's Sign Code (Dewey-Humboldt Code of Ordinances §§ 153.125-153.130, part of Chapter 153: Zoning Regulations), administered by the Community Development Department. New signs exceeding 8 square feet in area or 8 feet in height require a permit; a short list of small/limited signs (government signs, posters, flags, sandwich boards, window signs, and small residential wall/ground signs) are exempt from permitting but still subject to the Sign Code's placement and content rules.

Verified 2026-07-23 · Source

Requirements

  • Permit required to construct, install, attach, place, paint, alter, relocate, or otherwise maintain any sign in the Town, except exempt signs (§ 153.127(A))
  • Permit specifically triggered for new signs exceeding 8 sq. ft. in area or exceeding 8 ft. in height (§ 153.128(K)); smaller signs may qualify for the exempt-sign list in § 153.127(H) (2 exempt signs max per business/residential lot)
  • No sign may exceed 30 feet in height Town-wide; signs may not be placed in the public right-of-way, attached to utility poles/light standards/bridges, painted on natural objects, or be audible; freestanding signs require a 1-foot setback per foot of sign height (§ 153.128)
  • Signs not allowed in a residential zone may not be placed within 20 linear feet of residentially zoned property (§ 153.128(J))
  • Application (submitted to the Community Development Department) must include: assessor's parcel number, legal description/dimensions of the property, zoning designation, sign type/materials/support method, estimated true value of the sign and its structural supports, sign panel dimensions and height above grade, illumination type/placement/strength, number and orientation of sign faces, a final plot plan (lot boundaries, adjacent ROW, driveways, buildings, north arrow, sign location), a final elevation view with dimensions and approximate copy/design, and owner/agent name, address, phone, and signature (§ 153.127(D))
  • Temporary signs (per § 153.130) require a separate temporary sign permit, valid for no more than 6 months, extendable only via a use permit (§ 153.127(F))
  • No dedicated downloadable 'Sign Permit Application' PDF was found on the Town's Printable Forms page (dhaz.gov/2166/Printable-Forms) as of this verification — the ordinance itself (§ 153.127(D)) states the application is made 'on forms provided by the town'; contact Community Development (928-632-7362) to obtain the current form, since it is not posted online alongside the Building/OTC/Solar/Zoning Clearance forms

Required documents

  • RequiredSign Permit ApplicationTown of Dewey-Humboldt Community Development sign permit application, per § 153.127(D); not found as a standalone downloadable PDF on the Town's Printable Forms page — obtain directly from Community Development (928-632-7362)
  • RequiredFinal Plot PlanShows lot boundaries, adjacent street right-of-way, driveways, existing/proposed buildings, north arrow, and sign location, per § 153.127(D)(9)
  • RequiredFinal Elevation ViewDimensioned elevation view with approximate copy/ad design of the sign face(s), per § 153.127(D)(10)

Fee schedule

Fee typeAmountNotes
Temporary or Directional Sign Permit (on- or off-premises)$10Dewey-Humboldt Code of Ordinances, Chapter 153 (Zoning Regulations), Appendix A: Fee Schedule, 'Sign Permits' table
On-Premises Advertising Sign Permit$60Applies regardless of use or size, per Chapter 153 Appendix A: Fee Schedule, 'Sign Permits' table
Off-Premises Sign Permit (other than directional)$200Chapter 153 Appendix A: Fee Schedule, 'Sign Permits' table; structures other than pure supports (monuments, poles, standards) must additionally be permitted as structures under general zoning clearance procedures or have proven pre-existing legal status

Fire Sprinkler System Permit (via Central Arizona Fire and Medical Authority)

Verified

Dewey-Humboldt has no fire-sprinkler permitting function of its own -- the Town deleted its IBC Chapter 9 and IRC § R313 fire-protection sections in their entirety (§ 150.02 and § 150.03 amendments) and defers completely to Central Arizona Fire and Medical Authority (CAFMA), the fire district serving Dewey-Humboldt, Chino Valley, Prescott Valley, Paulden, and unincorporated Prescott-area lands. CAFMA's own Fire Prevention Division reviews and permits all new and modified automatic fire sprinkler and standpipe systems under the adopted International Fire Code (2024 IFC, with local amendments, as of this verification) and NFPA standards, entirely independent of the Town's Building Safety Division and its Yavapai-County-pass-through building-permit fee mechanism used elsewhere in this file. The Town's Building Official coordinates with CAFMA on final approvals but does not independently review or fee fire-protection systems.

Verified 2026-07-23 · Source

Requirements

  • Fire sprinkler system plans/specifications must be submitted directly to the CAFMA Fire Prevention Division (not the Town) -- four sets of plans required for built-in fire protection systems including automatic fire sprinklers and standpipes, per CAFMA's Construction Guidelines for Contractors and Architects (REF: IFC 105.4)
  • A CAFMA permit or affidavit is required for any installation or modification of a fire protection system; forms are available at www.cazfire.gov or at CAFMA Administrative Headquarters (8603 E. Eastridge Dr., Prescott Valley, AZ 86314; 928-772-7711)
  • All plans are approved, approved with corrections, or rejected by the CAFMA Fire Code Official (IFC 105.4); no specific published business-day review timeframe was found in CAFMA's Construction Guidelines or Fee Schedule (see reviewTimelineNote)
  • CAFMA permits are valid for 180 days from approval; a written extension request must be submitted before expiration, and after 365 days a new permit is required regardless of extensions
  • 24-hour advance notice is required to schedule a CAFMA inspection (more may be required for large/complex systems); the Fire Code Official will not approve occupancy until fire-protection requirements are verified complete, and CAFMA separately inspects for Fire Code compliance whenever the Town's Building Official is preparing to issue a temporary or permanent Certificate of Occupancy
  • Applicable CAFMA fees must be paid at time of plan submission

Required documents

  • RequiredFire Sprinkler/Standpipe Plans and Specifications (4 sets)Submitted directly to CAFMA Fire Prevention Division; must include shop drawings, product data, manufacturer's catalog cuts, and hydraulic calculations as applicable, per CAFMA Construction Guidelines
  • RequiredCAFMA Fire Protection System Permit / AffidavitAvailable at www.cazfire.gov or CAFMA Administrative Headquarters; required for any new installation or modification of a fire protection system

Fee schedule

Fee typeAmountNotes
Commercial Fire Sprinkler System (new)$683 per submittal (up to 10,000 sq. ft.; base fee + $0.03 per sq. ft. over 10,000)CAFMA Fee Schedule, effective 06/27/2022, 'Construction Permits' table -- visually verified against the rendered PDF page (pdftotext -layout misaligned this fee table by one row; the dollar figures here were confirmed against the rendered page image)
Residential Fire Sprinkler System (new)$458 per submittal (up to 10,000 sq. ft.; base fee + $0.03 per sq. ft. over 10,000)CAFMA Fee Schedule, effective 06/27/2022, 'Construction Permits, Continued' table; visually verified against the rendered PDF page
Commercial Fire Sprinkler Modification$433 per submittal (up to 10,000 sq. ft.; base fee + $0.03 per sq. ft. over 10,000)CAFMA Fee Schedule, 'Construction Modification Permits' table; visually verified against the rendered PDF page
Residential Fire Sprinkler Modification$333 per submittal (up to 10,000 sq. ft.; base fee + $0.03 per sq. ft. over 10,000)CAFMA Fee Schedule, 'Construction Modification Permits' table; visually verified against the rendered PDF page
Water Tank for Private/Commercial Fire Protection (excludes NFPA 13D single-family pump & tank)$209 per submittalCAFMA Fee Schedule, 'Construction Permits, Continued' table
Fire Protection System Demolition (includes fire sprinklers and fire alarms)$258 per submittalCAFMA Fee Schedule, 'Construction Permits, Continued' table
Plan Review Resubmittal / Multi-Story Building Inspection / Reinspection feesPlan Review Resubmittal $108 per submittal; Multi-Story Building Inspection (Fire Sprinklers and Fire Alarm) $125 per floor above 2 floors, in addition to the installation permit fee; Reinspection (failed, failure to install per plans, failure to pretest, no-show, or not otherwise specified) $125 per inspectionCAFMA Fee Schedule, 'Miscellaneous Fees' table; visually verified against the rendered PDF page

Fire Alarm System Permit (via Central Arizona Fire and Medical Authority)

Verified

As with fire sprinkler systems, Dewey-Humboldt has no fire-alarm permitting function of its own and defers entirely to Central Arizona Fire and Medical Authority (CAFMA). CAFMA's Fee Schedule and Construction Guidelines treat 'Fire Alarm' as its own distinct construction-permit line item with its own fee, separate and priced differently from the Fire Sprinkler System permit line item, which is why this file documents it as a separate permit product rather than folding it into the sprinkler entry.

Verified 2026-07-23 · Source

Requirements

  • Fire detection and alarm system plans/specifications must be submitted directly to the CAFMA Fire Prevention Division (not the Town) -- four sets of plans required, per CAFMA's Construction Guidelines for Contractors and Architects (REF: IFC 105.4)
  • A CAFMA permit or affidavit is required for any installation or modification of a fire alarm system; forms are available at www.cazfire.gov or at CAFMA Administrative Headquarters (8603 E. Eastridge Dr., Prescott Valley, AZ 86314; 928-772-7711)
  • All plans are approved, approved with corrections, or rejected by the CAFMA Fire Code Official (IFC 105.4); no specific published business-day review timeframe was found in CAFMA's Construction Guidelines or Fee Schedule (see reviewTimelineNote)
  • CAFMA permits are valid for 180 days from approval; a written extension request must be submitted before expiration, and after 365 days a new permit is required regardless of extensions
  • 24-hour advance notice is required to schedule a CAFMA inspection; system monitoring and supervision requirements apply per CAFMA's adopted fire-alarm standards
  • Applicable CAFMA fees must be paid at time of plan submission

Required documents

  • RequiredFire Alarm/Detection System Plans and Specifications (4 sets)Submitted directly to CAFMA Fire Prevention Division; must include device layout, sequence of operations, and monitoring/notification details per CAFMA Construction Guidelines
  • RequiredCAFMA Fire Protection System Permit / AffidavitAvailable at www.cazfire.gov or CAFMA Administrative Headquarters; required for any new installation or modification of a fire alarm system

Fee schedule

Fee typeAmountNotes
Fire Alarm System (new)$483 per submittal (up to 10,000 sq. ft.; base fee + $0.03 per sq. ft. over 10,000)CAFMA Fee Schedule, effective 06/27/2022, 'Construction Permits' table -- visually verified against the rendered PDF page (pdftotext -layout misaligned this fee table by one row; the dollar figures here were confirmed against the rendered page image)
Fire Alarm Modification$308 per submittal (up to 10,000 sq. ft.; base fee + $0.03 per sq. ft. over 10,000)CAFMA Fee Schedule, 'Construction Modification Permits' table; visually verified against the rendered PDF page
Fire Protection System Demolition (includes fire sprinklers and fire alarms)$258 per submittalCAFMA Fee Schedule, 'Construction Permits, Continued' table -- same shared demolition line item as the fire-sprinkler-permit entry in this file
Plan Review Resubmittal / Multi-Story Building Inspection / Reinspection feesPlan Review Resubmittal $108 per submittal; Multi-Story Building Inspection (Fire Sprinklers and Fire Alarm) $125 per floor above 2 floors, in addition to the installation permit fee; Reinspection (failed, failure to install per plans, failure to pretest, no-show, or not otherwise specified) $125 per inspectionCAFMA Fee Schedule, 'Miscellaneous Fees' table; visually verified against the rendered PDF page

Change of Use

Verified

Dewey-Humboldt has no single, dedicated 'Change of Use Permit' application distinct from its general Zoning Clearance and Building Permit mechanisms. IMPORTANT: this is a fresh, independent finding, distinct from this file's zoning-clearance-permit entry -- that entry documents the Town FAQ's narrower description of Zoning Clearance as the path for work EXEMPT from a full Building Permit (sheds, fences, tanks, driveways). A change of use is handled differently: the Town's Chapter 153 (Zoning Regulations) Appendix A Fee Schedule explicitly lists and prices 'changes of use' as a category under its Nonresidential Zoning Clearance fee table (a genuinely real, distinct, and directly on-point fee line, independently located in the ordinance itself), and separately, any change of occupancy classification on the building-code side is governed by the 2018 International Existing Building Code (§ 150.09) and requires a final inspection and Certificate of Occupancy from the Town's Building Official before the new use may occupy the space.

Verified 2026-07-23 · Source

Requirements

  • For a change of use that is allowed by right in the applicable zoning district: submit a Zoning Clearance Application to Community Development; Chapter 153 Appendix A prices this under 'Nonresidential: noncommercial; motels; camps; commercial; industrial; changes of use; includes slabs, paving, walls, fences, sign supports' at $0.125 per sq. ft. under roof, with a $125 minimum permit fee
  • For a proposed use that is NOT allowed by right in the applicable zoning district: a discretionary Use Permit (§ 153.091) is required instead, granted at the discretion of the Town Council after a Planning & Zoning Commission hearing and a Council hearing; the Town publishes an A.R.S. § 9-835-style timeframe for this specific track (see reviewTimelineNote) via its 'Use Permit Process Flow Diagram'
  • On the building-code side, a change of occupancy classification (as defined by the adopted 2018 International Existing Building Code, § 150.09) triggers Building Official review under IEBC provisions governing repair, alteration, change of occupancy, addition, and relocation of existing buildings -- processed through this file's residential-building-permit or otc-electrical-plumbing-mechanical-permit entry depending on scope of work, not a standalone 'change of use' building permit
  • A final inspection and a Certificate of Occupancy are required by the Town before the new use may occupy the space, per the Town's own FAQ ('When can I occupy my new home? A final inspection and a Certificate of Occupancy are required prior to occupancy.'); no separate CO-specific fee line was found in Chapter 150 Appendix A -- CO issuance appears bundled into the standard Building Permit fee mechanism (Yavapai County pass-through + 42% Town administration fee) rather than charged separately
  • If the change of use involves a fire-protection system change (e.g., a new commercial occupancy requiring sprinklers or an alarm system), a separate CAFMA fire-sprinkler-permit and/or fire-alarm-permit (this file's entries) is required independently of the Town's own review

Required documents

  • RequiredZoning Clearance ApplicationTown of Dewey-Humboldt Zoning Clearance Application (fillable version on Printable Forms page); used for a by-right change of use per Chapter 153 Appendix A's 'changes of use' fee category
  • OptionalDevelopment Permit Application (if a discretionary Use Permit is required)Town of Dewey-Humboldt Development Permit Application; the same consolidated zoning-application form used for Use Permits, rezones, variances, and other discretionary Chapter 153 actions -- required only if the proposed use is not allowed by right in the applicable zoning district

Fee schedule

Fee typeAmountNotes
Nonresidential Change of Use (by-right, via Zoning Clearance)$0.125 per sq. ft. under roof; $125 minimum permit feeDewey-Humboldt Code of Ordinances, Chapter 153 (Zoning Regulations), Appendix A: Fee Schedule, 'Zoning Clearance Fees / Metes and Bounds and Recorded Lots' table, item 3 ('Nonresidential: noncommercial; motels; camps; commercial; industrial; changes of use...'); visually confirmed against the rendered ordinance text
Use Permit (if the new use is not allowed by right)Residential $750 plus $10/acre; Commercial $1,000 plus $10/acre; Industrial $1,000 plus $10/acre; UP renewal with no modifications: full fee less 50%; UP renewal with modifications: full feeChapter 153 Appendix A: Fee Schedule, 'Zoning Map Change... OR use permit' table -- only applies to the discretionary Use Permit track, not the by-right Zoning Clearance change-of-use track
Building Permit / Plan Review (if the change of use triggers IEBC change-of-occupancy building work)Per Yavapai County Valuation and Fee Schedule (pass-through fee) PLUS 42% Town administration feeSame fee mechanism as this file's residential-building-permit and otc-electrical-plumbing-mechanical-permit entries; no separate Certificate-of-Occupancy-specific fee line found in Chapter 150 Appendix A

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dewey-Humboldt building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /arizona/yavapai-county/dewey-humboldt/as-of/2026-07-06/

Snapshot date: 2026-07-06

Commit: 0214041

Reproducible from PermitBase’s version-controlled dataset, commit 0214041.