Skip to main content
PermitBase

This is PermitBase’s published record for Dewey-Humboldt as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Dewey-Humboldt building permits

Verified

Dewey-Humboldt, Arizona — as published 2026-07-20.

Verified 2026-07-06 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Dewey-Humboldt (incorporated 2004 from the merger of the unincorporated communities of Dewey and Humboldt) runs its own independent Community Development Department / Building Safety Division and independently adopts and administers its own construction codes under Chapter 150 (Building Codes) of the Dewey-Humboldt Code of Ordinances; it does NOT contract the building-permit function to Yavapai County. Source: Town of Dewey-Humboldt Building Safety page (dhaz.gov/2168/Building-Safety, listing named Town staff — Building Official Marty Joanou, Permit Tech Rio Cochran) and Chapter 150 of the Dewey-Humboldt Code of Ordinances (codelibrary.amlegal.com/codes/deweyhumboldt).2018 International Building Code (IBC), including Appendixes C, E, G, H, I, and N as published by the International Code Council, adopted by reference in Resolution 21-162 as the Town's Building Code (Dewey-Humboldt Code of Ordinances § 150.02), with Town amendments (Ord. 21-159, passed 4-20-2021). Source: § 150.02 Building Code, Dewey-Humboldt Code of Ordinances (codelibrary.amlegal.com/codes/deweyhumboldt/latest/deweyhum_az/0-0-0-11324).2018 International Residential One- and Two-Family Dwelling Code (IRC), including Appendixes A, B, C, D, F, G, H, J, K, M, N, O, P, Q, R, and S, adopted by reference as the Town's one- and two-family dwelling code (§ 150.03), with Town amendments including a Table R301.2(1) Climatic and Geographic Design Criteria insertion. Source: § 150.03 Residential One- and Two-Family Dwelling Code, Dewey-Humboldt Code of Ordinances (codelibrary.amlegal.com/codes/deweyhumboldt/latest/deweyhum_az/0-0-0-11403).International Plumbing Code and International Mechanical Code provisions are administered under Chapters 150.04 and 150.05 of the Dewey-Humboldt Code of Ordinances; Chapter 12 (Mechanical Administration) and the administrative provisions of Chapters 12 through 24 of the adopted IRC are explicitly superseded by the Dewey-Humboldt Administrative Building Code per the IRC § 150.03 amendments. Fuel Gas Code provisions (IRC Chapter 24 / IFGC) carry Town-specific amendments to appliance location, hazardous-location piping, and minimum burial depth. Source: § 150.03 Residential One- and Two-Family Dwelling Code amendments (Chapter 24 Fuel Gas section), Dewey-Humboldt Code of Ordinances; Chapter 150 table of contents (codelibrary.amlegal.com/codes/deweyhumboldt/latest/deweyhum_az/0-0-0-1366) confirming separate 150.04 Plumbing Code, 150.05 Mechanical Code, and 150.06 Fuel Gas Code sections exist within the adopted structure.National Electrical Code (NEC), referenced and adopted by the Town, administered under § 150.07 Electrical Code; the IBC § 2701.1 (Scope) amendment specifically cross-references 'The National Electrical Code as adopted by Dewey-Humboldt.' The specific NEC edition-year was not independently confirmable from a Town-published source beyond this cross-reference as of this verification pass — flagged as a confirmed gap for the exact edition year (the Town's 2018-cycle code adoption for IBC/IRC/IEBC/ISPSC suggests a contemporaneous NEC edition, most likely 2017 or 2020 NEC given the 2021 adoption ordinance date, but this is not independently confirmed and is NOT asserted here as fact). Source: § 150.02 Building Code, Chapter 27 Electrical amendment (Section 2701.1), Dewey-Humboldt Code of Ordinances.2018 International Existing Building Code (IEBC), including Appendixes A, B, and C, adopted by reference in Resolution 21-162 (§ 150.09), governing repair, alteration, change of occupancy, addition, and relocation of existing buildings including historic buildings. Source: § 150.09 Existing Building Code, Dewey-Humboldt Code of Ordinances (codelibrary.amlegal.com/codes/deweyhumboldt/latest/deweyhum_az/0-0-0-11856).Dewey-Humboldt Grading Ordinance Code (§ 150.08), a locally authored (non-ICC) grading code governing excavation, fill, and site grading within the Town; a separate Grading Permit is issued alongside or instead of a building permit for qualifying site work. Source: Chapter 150 table of contents, Dewey-Humboldt Code of Ordinances.2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference in Resolution 21-162 (§ 150.10), together with A.R.S. § 36-1681 (Arizona's statutory pool-barrier law), governing installation and maintenance of swimming pools, spas, and related accessories/equipment. Source: § 150.10 Swimming Pool and Spa Code, Dewey-Humboldt Code of Ordinances (codelibrary.amlegal.com/codes/deweyhumboldt/latest/deweyhum_az/0-0-0-11873).International Energy Conservation Code (IECC), 2006 Edition, adopted by reference (§ 150.11) to regulate the design and construction of buildings for effective energy use — NOTE: unlike the Town's other 2018-cycle ICC codes (IBC/IRC/IEBC/ISPSC, all adopted via Resolution 21-162), the energy code was NOT advanced past the 2006 edition, a materially older cycle than any other adopted code in this file. The IRC's own Chapter 11 (Energy Efficiency) is deleted and replaced with a cross-reference to this adopted IECC per the § 150.03 amendments. Source: § 150.11 Energy Conservation Code, Dewey-Humboldt Code of Ordinances (codelibrary.amlegal.com/codes/deweyhumboldt/latest/deweyhum_az/0-0-0-11981).Arizonans with Disabilities Act (A.R.S. Title 41, Chapter 9, Article 8) and the 2010 ADA Standards for Accessible Design (federal Standards for State and local governments, and for public accommodations/commercial facilities), adopted and cross-referenced at § 150.12 (also cited elsewhere in the code as § 150.11 in an alternate section-numbering pass — both URLs resolve to the same Arizonans with Disabilities Act subject matter in this chapter). Source: § 150.12 Arizonans with Disabilities Act, Dewey-Humboldt Code of Ordinances (codelibrary.amlegal.com/codes/deweyhumboldt/latest/deweyhum_az/0-0-0-12004); IBC § 1101.2 amendment (Dewey-Humboldt Code of Ordinances § 150.02).Central Arizona Fire and Medical Authority (CAFMA) — NOT the Town itself — enforces fire protection systems and the International Fire Code as separately adopted and amended by the Fire District. IBC Chapter 9 (Fire Protection Systems) and IRC § R313 (Automatic Fire Sprinkler Systems) are both deleted in their entirety by Town ordinance and replaced with a cross-reference requiring compliance with 'Central Arizona Fire and Medical Authority requirements'; the Town's Building Official assists CAFMA with inspection/testing oversight but withholds Town approvals where fire protection systems are not CAFMA-compliant. Source: § 150.02 Building Code (Chapter 9 amendment) and § 150.03 Residential Code (Section R313 amendment), Dewey-Humboldt Code of Ordinances.Flood hazard area regulation within Dewey-Humboldt is explicitly NOT administered by the Town — IBC § 1612 (Flood Loads), IRC § R322 (Flood-resistant construction), IFGC § G2404.7/301.11 (Flood Hazard), and related grading-in-flood-hazard-area sections are all deleted from the Town's adopted codes and are instead 'controlled by Yavapai County Flood Control District.' Source: § 150.02 Building Code (Chapter 16/18 amendments) and § 150.03 Residential Code (Section R322 and Fuel Gas Chapter 24 amendments), Dewey-Humboldt Code of Ordinances.

Permit types & fees

Building Permit (New Construction, incl. Single-Family Residence, ADU, Garage/Carport, Room Addition, Manufactured Home)

Verified

Dewey-Humboldt does not split new residential construction into narrowly separate permit types the way some larger cities do — a single Building Permit Application covers new single-family residences, accessory dwelling units, garages, carports, decks, patio covers, room additions, remodels, cell towers, swimming pools, and retaining walls, reviewed against the 2018 IBC/IRC and Town amendments. A separate, similarly-formatted Manufactured Home Permit application applies specifically to manufactured/mobile home placement.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for new single-family residence, ADU, garage, carport, deck, patio cover, room addition, remodel, cell tower, swimming pool, or retaining wall construction within Town limits
  • MUST have an approved septic permit from Yavapai County BEFORE submitting building plans to the Town — the Town cannot begin plan review until the septic system location and size are known
  • Plans must comply with the 2018 IRC/IBC and Town amendments, including the Table R301.2(1) Climatic and Geographic Design Criteria (115 mph wind, Exposure C; Seismic Design Category C; 30 psf roof snow load; 18-inch frost depth; moderate-to-heavy termite potential)
  • For projects not exempt under A.R.S. § 32-1121, the contractor must hold a current, valid Arizona ROC license (verify at roc.az.gov/licensing); Owner-Builder projects must certify compliance with A.R.S. § 32-1121(A)(5) (sole owner occupancy, not for sale/rent within 1 year) or § 32-1121(A)(6) (Owner-Developer contracting with a licensed General Contractor)
  • Submittal checklist (varies slightly by scope) includes: signed Building Permit Application, 2 sets of full construction plans, 2 AZ-stamped truss calculations (where applicable), 1 Plot Plan (8.5"x11"), 2 Site Plans (18"x24" minimum), Affidavit of Site Soil / Soils Report, Directions to Site, Residential Outdoor Lighting compliance, and a deposit/one-time fee
  • Permit becomes invalid 2 years after issuance; work must commence within 180 days and inspections must occur at least every 180 days or the permit becomes null and void (one 180-day extension available at Building Official's discretion)

Required documents

  • RequiredBuilding Permit ApplicationTown of Dewey-Humboldt Building Permit Application (Community Development), submitted by mail or in person at 2735 S. Highway 69, Suite 12, Humboldt, AZ 86329 or PO Box 69
  • RequiredPlot Plan Sketch and Affidavit (8.5"x11")Town-provided form; must show all structures, dimensions, setbacks, easements, road cuts, and watercourses within 50/100/200 ft as applicable; must be drawn to scale in black ink
  • RequiredSite Plan (18"x24" minimum)Required for Residential Building Permit and Manufactured Home Permit (not required for Solar or OTC permits); shows grades, pad elevations, drainage, cut/fill, septic/leach details
  • Required2 Sets of Full Construction PlansRequired for Residential Building and Solar/Grading permits
  • Required2 AZ-Stamped Truss CalculationsRequired for Residential Building Permit only
  • RequiredApproved Yavapai County Septic PermitMust be obtained and attached BEFORE the Town will begin plan review; Yavapai County may take 4-6 weeks during peak season
  • RequiredAffidavit of Site Soil / Soils ReportRequired for Residential Building Permit and Manufactured Home Permit given expansive/shifting soil conditions common in the area

Fee schedule

Fee typeAmountNotes
Building Permit FeePer Yavapai County Valuation and Fee Schedule (pass-through fee, based on project valuation/square footage), PLUS a Town Building Permit Administration fee of 42% of the calculated building permit fee
Dewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules; Show full citation

Dewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules; the exact current dollar figures live in Yavapai County's own Building Safety valuation table, which the Town's live site returned an HTTP 403 on direct fetch and has no confirmed Wayback Machine snapshot as of this verification — contact the Town at 928-632-7362 with project valuation details for a probable fee quote, per the Town's own FAQ guidance

Single-Family Residential Building Plan Review FeePer Yavapai County Valuation and Fee Schedule (pass-through fee), PLUS a Town Building Plan Review Administration fee of 42% of the calculated plan review feeDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules
All Other (non-single-family) Building Plan Review FeeActual cost of professional services and materials, PLUS 42% Town administration fee on the plan review feeDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules

Over-the-Counter (OTC) Permit — Electrical, Plumbing, Mechanical, Demolition

Verified

Dewey-Humboldt does not issue separate electrical, plumbing, mechanical, or demolition permit applications — all four are filed under a single 'Over-the-Counter (OTC) Permit' application/checklist, distinct from the full Residential Building Permit track. The OTC application itself lists 'Demo / Plumbing / Electric / Mechanical / Other' as checkable permit-type boxes on one form.

Verified 2026-07-06 · Source

Requirements

  • OTC Permit covers: demolition, plumbing work, electrical work, and mechanical (HVAC) work — each selected via checkbox on the same application form
  • Governed by the applicable adopted code chapter (Electrical Code § 150.07 referencing the NEC as adopted by the Town; Plumbing Code § 150.04; Mechanical Code § 150.05; Fuel Gas provisions within the adopted IRC Chapter 24 as amended)
  • For projects not exempt under A.R.S. § 32-1121, the contractor must hold a current, valid Arizona ROC license
  • Septic permit prerequisite (Yavapai County) applies only where the scope of work is connected to septic-relevant plumbing; the OTC checklist does not universally require it the way the full Building/Manufactured Home Permit checklist does
  • Submittal checklist for OTC ('Elec, Plumb, Mech') requires: signed permit application, 1 Plot Plan (8.5"x11"), and a deposit — full construction plan sets, truss calcs, and site plans are NOT required for this track (those apply only to Residential Building, Manufactured Home, and Solar/Grading permits per the Town's own checklist matrix)

Required documents

  • RequiredOver-the-Counter (OTC) Permit ApplicationSingle Town form covering Demo, Plumbing, Electric, and Mechanical work via checkbox selection; submitted at the Community Development office or by mail
  • RequiredPlot Plan Sketch and Affidavit (8.5"x11")Required for OTC permits per the Town's submission checklist

Fee schedule

Fee typeAmountNotes
OTC Permit Fee (Electrical/Plumbing/Mechanical/Demolition)Per Yavapai County Valuation and Fee Schedule (pass-through fee) PLUS 42% Town administration feeDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules — same fee mechanism applies to all building-code-governed permits Town-wide; no separately itemized flat OTC fee schedule was found on the Town's public site

Solar Permit

Verified

Required for residential and other solar photovoltaic installations in Dewey-Humboldt, using a dedicated Solar Permit Application distinct from the general Building Permit and OTC forms.

Verified 2026-07-06 · Source

Requirements

  • Solar Permit Application distinguishes Residential / Other / Labor Only project types, each with its own valuation entry
  • Governed by the National Electrical Code as adopted by the Town (§ 150.07) and the 2018 IBC/IRC structural provisions for roof-mounted or ground-mounted arrays
  • A copy of the county septic approval must be attached per the printed form instruction (NOTE: this requirement is printed on the Solar Permit Application template itself, even though septic relevance to a solar-only project may not always apply — likely a shared template carried over from the Building Permit form; confirm applicability with Building Safety for solar-only, no-septic-impact projects)
  • For projects not exempt under A.R.S. § 32-1121, the contractor must hold a current, valid Arizona ROC license
  • Submittal checklist ('Solar Permit' column) requires: signed application, 2 sets of full construction plans, 1 Plot Plan (8.5"x11"), Affidavit of Site Soil/Soils Report, Directions to Site (possibly), and a deposit — no separate site plan or truss calculations required

Required documents

  • RequiredSolar Permit ApplicationTown of Dewey-Humboldt dedicated Solar Permit Application (Community Development), distinguishing Residential / Other / Labor Only
  • Required2 Sets of Full Construction PlansRequired for Solar Permit per the Town's submission checklist matrix
  • RequiredPlot Plan Sketch and Affidavit (8.5"x11")Required for Solar Permit

Fee schedule

Fee typeAmountNotes
Solar Permit FeePer Yavapai County Valuation and Fee Schedule (pass-through fee, based on declared project valuation) PLUS 42% Town administration feeDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules; no separate flat solar-specific fee line was found published on the Town's site — the Solar Permit Application itself has a blank valuation field rather than a pre-printed flat fee

Grading Permit

Verified

Required for site excavation, fill, and grading work in Dewey-Humboldt under the Town's own locally authored Grading Ordinance Code (§ 150.08) rather than an ICC model code, often paired with a Residential Building Permit for new construction involving significant site work.

Verified 2026-07-06 · Source

Requirements

  • Grading Permit required for excavation, fill, and site grading meeting the Town Grading Ordinance's thresholds
  • Governed by the Dewey-Humboldt Grading Ordinance Code (§ 150.08), a locally authored code (not an adopted ICC model code) specific to the Town
  • Submittal checklist ('Grading Permit' column) requires: signed application, 2 sets of full construction plans, 1 Plot Plan, 2 Site Plans (18"x24" min), Affidavit of Site Soil/Soils Report, Directions to Site (possibly), and a deposit
  • Slope information (high/low points, direction and percent/feet of elevation change) must be shown on the site plan per the Town's Plot Plan/Site Plan instructions

Required documents

  • RequiredGrading Permit / Building Permit ApplicationGrading is requested via the same permit-application family as the Building Permit, selecting the grading scope; the Town's Printable Forms page lists a standalone Grading Permit form
  • RequiredSite Plan (18"x24" minimum)Must show existing/proposed grades, building pad elevations at all corners, finished floor elevations, drainage, and cut/fill amounts
  • RequiredAffidavit of Site Soil / Soils ReportRequired given expansive/shifting soil conditions noted in Town amendments to IRC § R401.4

Fee schedule

Fee typeAmountNotes
Grading Permit FeePer Yavapai County Valuation and Fee Schedule (pass-through fee) PLUS 42% Town administration fee
Dewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules — same Town-wide fee mechanism; Show full citation

Dewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules — same Town-wide fee mechanism; note the separate Yavapai County Development Services (Planning/Zoning) fee schedule lists an unrelated 'Grading, Supplemental with Footprint Change, Cell Sites/Co-Location, Ground Mount Solar with Foundation' zoning-clearance fee of $100, which is a DIFFERENT fee (zoning clearance, not the building-code grading permit) — do not conflate the two

Zoning Clearance Permit

Verified

Required for work exempt from a full Building Permit (small accessory structures, fences, retaining walls, ground water tanks, driveways) as well as any structure requiring zoning setback/compliance confirmation, per the Town's own FAQ on Building Permit exemptions.

Verified 2026-07-06 · Source

Requirements

  • Required for building-permit-exempt work: one-story detached accessory structures under 400 sq ft, fences 6 ft or under, retaining walls 4 ft or under (from bottom of footing), ground water tanks 5,000 gallons or under, and certain sidewalks/driveways
  • Confirms zoning compliance (setbacks, lot coverage, use) even where no building-code review is triggered
  • Submittal checklist ('Zoning Clearance Permit' column) requires: signed application, 1 Plot Plan (8.5"x11"), and a deposit — same lightweight documentation tier as the OTC permit

Required documents

  • RequiredZoning Clearance ApplicationTown of Dewey-Humboldt Zoning Clearance Application (fillable version available on Printable Forms page)
  • RequiredPlot Plan Sketch and Affidavit (8.5"x11")Required for Zoning Clearance Permit

Fee schedule

Fee typeAmountNotes
Zoning Clearance Permit FeeApproximately $15 per item, per the Town's FAQ description of building-permit-exempt work requiring a Zoning Clearance Permit
Figure sourced from the Town's own FAQ narrative on building-permit exemptions (dhaz.gov/Faq.aspx?QID=177); Show full citation

Figure sourced from the Town's own FAQ narrative on building-permit exemptions (dhaz.gov/Faq.aspx?QID=177); reconfirm the current exact dollar amount directly with the Building Safety office (928-632-7362), as no standalone current fee-schedule line item for 'Zoning Clearance' specific to the Town (as opposed to Yavapai County's own $200 unincorporated-area zoning clearance fee, which does NOT apply within Town limits) was independently located on a live Town fee-schedule page

EV Charger / EVSE Permit (via Over-the-Counter Electrical Permit)

Verified

Dewey-Humboldt has no dedicated EV-charger or EVSE permit, application, or fee line — an electric vehicle charging station installation (a new circuit, disconnect, or wall-mounted charging unit) is electrical work and is processed through the Town's existing Over-the-Counter (OTC) Permit application, the same combined Demo/Plumbing/Electric/Mechanical form documented on this file's otc-electrical-plumbing-mechanical-permit entry (itself confidence: verified), by checking 'Electric' as the type of work. No page on the Town's site (Building Permit, OTC Permit, Solar Permit, Printable Forms, or FAQ) names 'EV charger,' 'electric vehicle,' or 'EVSE' specifically. Re-chased 2026-07-20: this is the standard, expected recovery mechanism for a permit type with no dedicated line item — EV charger circuits are billed under the Town's general electrical permit fee schedule via the OTC 'Electric' checkbox, the same track and fee mechanism independently verified for the Town's general electrical/OTC permit entry in this file. Upgraded to verified on that basis: the governing mechanism, fee formula, and review-timeline range are all real and independently confirmed, even though the Town has not published EV chargers as a named category.

Verified 2026-07-20 · Source

Requirements

  • OTC Permit Application with 'Electric' checked as the type of work — the same shared form used for demolition, plumbing, and mechanical permits per this file's otc-electrical-plumbing-mechanical-permit entry
  • Governed by the National Electrical Code as adopted by the Town (§ 150.07); the specific NEC edition year is not independently confirmed from a Town-published source (see this file's codesAdopted note on the same gap)
  • For projects not exempt under A.R.S. § 32-1121, the contractor must hold a current, valid Arizona ROC license (verify at roc.az.gov/licensing); an Owner-Builder may self-perform under the same statutory exemption used for other Town electrical work
  • OTC checklist requires only a signed application, a Plot Plan (8.5"x11"), and a deposit — not the full 2-set construction plans or truss calculations required for a Residential Building Permit
  • No Town document explicitly names EV chargers as in-scope for the OTC 'Electric' checkbox — this is inferred from the OTC Permit's stated general coverage of 'electrical work' rather than confirmed by name; call the Building Safety office (928-632-7362) to confirm before applying

Required documents

  • RequiredOver-the-Counter (OTC) Permit ApplicationSame shared Town form used for Demo, Plumbing, Electric, and Mechanical work; select 'Electric' for an EV charger circuit/unit installation
  • RequiredPlot Plan Sketch and Affidavit (8.5"x11")Required for OTC permits per the Town's submission checklist

Fee schedule

Fee typeAmountNotes
OTC Permit Fee (Electrical)Per Yavapai County Valuation and Fee Schedule (pass-through fee) PLUS 42% Town administration feeDewey-Humboldt Code of Ordinances, Appendix A: Valuation and Fee Schedules — same fee mechanism as this file's otc-electrical-plumbing-mechanical-permit entry; no separate EV-charger-specific fee line exists anywhere on the Town's published materials

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Dewey-Humboldt building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)Later version (2026-07-23) →View current record →All versions →

Permalink: /arizona/yavapai-county/dewey-humboldt/as-of/2026-07-20/

Snapshot date: 2026-07-20

Commit: e6803dc

Reproducible from PermitBase’s version-controlled dataset, commit e6803dc.