Prescott Valley building permits
VerifiedPrescott Valley, Arizona — as published 2026-07-06.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family dwelling construction, custom homes, and residential master plans in the Town of Prescott Valley. Reviewed against the 2018 IRC and Town of Prescott Valley amendments (Chapter 7 of the Town Code, effective January 1, 2020). Applications are submitted through the Town's GoPost ePlan online portal using the Residential New Application, Master Plan Application, or Tract Home Application Custom Packet as applicable.
Verified 2026-07-06 · Source
Requirements
- Building permit required for new single-family dwelling construction, custom homes, and residential master-plan homes within Prescott Valley town limits
- Plans must comply with the 2018 IRC and Town of Prescott Valley amendments, including the Town's Climatic/Geographic Design Criteria (IRC basic wind speed 115 mph 3-second gust, Exposure C; Seismic Design Category C; 30 psf roof/ground snow load, non-reducible; 18-inch frost line depth; +15°F winter design temperature; moderate-to-heavy termite area)
- 2006 IECC (Residential Only) governs energy-efficiency requirements — the Town has not adopted a newer residential energy code edition
- Submittal via the Town's GoPost ePlan online portal (gopost-prescottvalley.eplansoftreview.com); a signed Contractors Form and Proof of Valid Contractor's License are required
- 'Acknowledging 2024 ICC Codes Not Yet Adopted' form must be signed, confirming the applicable code edition remains the 2018 ICC series
- A custom home ('Master Plan' single-family home) uses a full set of plans across all disciplines; residential master plans also cover duplexes and ADUs on a single-family lot
Required documents
- RequiredResidential New ApplicationTown of Prescott Valley Building Permit application for new single-family residential construction, submitted via the GoPost ePlan portal
- RequiredTract Home Application Custom Packet / Master Plan Application (2025 revised)Town submittal packet for tract-home or custom/master-plan single-family residential plan sets
- RequiredSite PlanLot dimensions, easements, setbacks, and structure locations
- RequiredConstruction Drawings and Structural CalculationsFull discipline plan set (architectural, structural, electrical, plumbing, mechanical) meeting Town Climatic/Geographic Design Criteria
- RequiredProof of Valid Contractor's License / Contractors FormTown of Prescott Valley form affirming A.R.S. Title 32, Chapter 11 contractor licensure (A.R.S. §§ 32-1168 - 1169) for the general contractor and identified subcontractors
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Total Valuation $1.00 to $500.00 | $26.75 per permit | Town of Prescott Valley Comprehensive Fee Schedule, Development Services: Building Permit Fees (Res. 2023-2339, eff. 10/28/2023) |
| Building Permit Fee — Total Valuation $501.00 to $2,000.00 | $37.45 per permit | Town of Prescott Valley Comprehensive Fee Schedule |
| Building Permit Fee — Total Valuation $2,001.00 to $25,000.00 | $53.50 for the first $2,000 of valuation, plus $9.65 for each additional $1,000 of valuation or fraction thereof | Town of Prescott Valley Comprehensive Fee Schedule |
| Building Permit Fee — Total Valuation $25,001.00 to $50,000.00 | $269.65 for the first $25,000 of valuation, plus $6.95 for each additional $1,000 of valuation or fraction thereof | Town of Prescott Valley Comprehensive Fee Schedule |
| Building Permit Fee — Total Valuation $50,001.00 to $100,000.00 | $443.50 for the first $50,000 of valuation, plus $5.90 for each additional $1,000 of valuation or fraction thereof | Town of Prescott Valley Comprehensive Fee Schedule |
| Building Permit Fee — Total Valuation $100,001.00 and above | $737.75 for the first $100,000 of valuation, plus $1.60 for each additional $1,000 of valuation or fraction thereof | Town of Prescott Valley Comprehensive Fee Schedule |
| Plan Review Fee — Tier III Residential (all non-commercial permits) | 65% of the Building Permit Fee, including Electrical, Plumbing, and Mechanical Fees | Town of Prescott Valley Comprehensive Fee Schedule, Development Services: Building Permit Fees |
| Plan Review Fee — Tier I Residential (Master Plan built on approved Mass Graded Lot) | $50.00 flat per plan | Town of Prescott Valley Comprehensive Fee Schedule |
| Plan Review Fee — Tier II Residential (approved Master Plan only) | 50% of the Building Permit Fee, including Electrical, Plumbing, and Mechanical Fees | Town of Prescott Valley Comprehensive Fee Schedule |
Residential Addition / Remodel / Accessory Structure Permit
VerifiedRequired for room additions, remodels, and new accessory structures over 200 square feet on existing one- and two-family dwellings in Prescott Valley. Reviewed against the 2018 IRC as adopted and amended by the Town.
Verified 2026-07-06 · Source
Requirements
- Building permit required for new additions, remodels, and accessory structures larger than 144 square feet (Zoning) / 200 square feet (Building)
- New Additions require: site plan, working drawings and specifications, floor plan
- New Accessory Building requires a site plan, and if larger than 144 square feet, working drawings and specifications (Zoning Fee applies at $16.05-$160.50 per Site Plan Review tier for accessory buildings 144 sq ft or less)
- A remodel is defined by the Town as work done to improve an existing single-family home
- Plans must comply with Town of Prescott Valley Design Criteria (115 mph wind, IRC; Exposure C; Seismic Design Category C; 30 psf roof snow load)
Required documents
- RequiredAddition Alteration Application (2025 revised)Town of Prescott Valley submittal application for room additions and remodels, submitted via the GoPost ePlan portal
- RequiredAccessory Structure Zoning Application (≤200 sq ft) / Accessory Structure Building Application (>200 sq ft)Town application depending on accessory structure size
- RequiredSite Plan (2025 revised)Showing existing structure, addition/accessory footprint, and setbacks
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Total Valuation | Same six-tier Total Valuation schedule as new residential construction ($26.75 minimum at $1-$500 valuation, scaling up per the valuation brackets) | Town of Prescott Valley Comprehensive Fee Schedule, Development Services: Building Permit Fees |
| Plan Review Fee — Tier III Residential (all non-commercial permits) | 65% of the Building Permit Fee, including Electrical, Plumbing, and Mechanical Fees | Town of Prescott Valley Comprehensive Fee Schedule |
| Deposit — Residential Additions/Remodels for Valuation <$5,000 | $26.75 | Town of Prescott Valley Comprehensive Fee Schedule; may be required at time of application |
| Deposit — Residential Additions/Remodels for Valuation $5,001 to $10,000 | $53.50 | Town of Prescott Valley Comprehensive Fee Schedule; may be required at time of application |
| Deposit — Residential Additions/Remodels for Valuation $10,001 to $15,000 | $64.20 | Town of Prescott Valley Comprehensive Fee Schedule; may be required at time of application |
| Deposit — Residential Additions/Remodels for Valuation $15,001 to $25,000 | $80.25 | Town of Prescott Valley Comprehensive Fee Schedule; may be required at time of application |
| Deposit — Residential Additions/Remodels for Valuation >$25,000 | $107.00 | Town of Prescott Valley Comprehensive Fee Schedule; may be required at time of application |
| Accessory Building Permit — Zoning Site Plan Review (144 sq ft or less) | $16.05 to $160.50 (per Site Plan Review, tiered) | Town of Prescott Valley Comprehensive Fee Schedule, Development Services: Zoning Fees |
Electrical Permit
VerifiedRequired for electrical installation, alteration, or repair work in Prescott Valley, governed by the 2017 National Electrical Code (NEC) as adopted by the Town. Applications are submitted via the Town's GoPost ePlan portal using the Miscellaneous Electrical Application.
Verified 2026-07-06 · Source
Requirements
- Electrical permit required for new electrical work, service replacement, resizing, panel work, generators, and other hard-wired electrical additions/removals/alterations
- Governed by the 2017 NEC as adopted by the Town of Prescott Valley (Chapter 7 of the Town Code, effective January 1, 2020)
- Standard scope (adding, removing, or altering electric) requires a Site Plan with 1-Line Diagram
- Electrical services greater than 400 amps require a Site Plan with 1-Line Diagram PLUS engineering approval/calculations
- Adding or changing a generator requires a Site Plan with 3-Line Diagram, generator location and clearance distances from existing structures, fuel storage type/size/location/distances, pipe sizing for LPG or natural gas line, and manufacturer's specifications for the generator and all system components
- Proof of Valid Contractor's License and Electric Service Entrance Verification Sheet (if applicable) required at submittal
- Apply via the Town's GoPost ePlan online portal
Required documents
- RequiredElectrical Application / Miscellaneous Electrical ApplicationTown of Prescott Valley permit application, submitted via GoPost ePlan portal
- OptionalElectric Service Entrance Verification SheetRequired if adding, removing, or altering electric service
- RequiredSite Plan with 1-Line Diagram (or 3-Line Diagram for generators)Required for all electrical scope; engineering approval/calculations additionally required for services over 400 amps
- RequiredProof of Valid Contractor's LicenseTown of Prescott Valley form affirming A.R.S. Title 32, Chapter 11 contractor licensure
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee | Greater of $32.10 or $0.04 per square foot | Town of Prescott Valley Comprehensive Fee Schedule, Development Services: Mechanical, Electrical, and Plumbing Fees; charged in addition to any applicable building permit fee |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair work in Prescott Valley, governed by the 2018 International Plumbing Code (IPC) as adopted by the Town. Applications are submitted via the Town's GoPost ePlan portal using the Miscellaneous Plumbing Application.
Verified 2026-07-06 · Source
Requirements
- Plumbing permit required for installation, alteration, or repair of plumbing systems, water/gas piping, and gas appliances
- Governed by the 2018 IPC and 2018 IFGC as adopted by the Town of Prescott Valley
- Adding, removing, altering, or replacing piping (water or gas) requires a Site Plan with 1-Line Diagram showing pipe size, lengths, burial depth, type of piping, and BTU/CFH calculations for gas
- Adding, removing, or altering a propane tank, gas fire pit, gas-fueled generator, or gas appliance requires manufacturer's specifications
- A water meter application located in Yavapai County (outside Town water service) requires an issued New Residential Permit from Yavapai County
- Water Heater replacement uses a dedicated Water Heater Application; manufacturer's specifications required only if changing water heater type
- Apply via the Town's GoPost ePlan online portal
Required documents
- RequiredPlumbing Application / Miscellaneous Plumbing Application ChecklistTown of Prescott Valley submittal application, submitted via GoPost ePlan portal
- OptionalWater Heater Application (2025 revised)Dedicated Town application for water heater replacement/installation
- RequiredSite Plan with 1-Line DiagramRequired for piping work: pipe size, lengths, burial depth, piping type, BTU/CFH gas calculations
- OptionalManufacturer's SpecificationsRequired for gas appliances, propane tanks, gas fire pits, gas-fueled generators, or a change in water heater type
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit Fee | Greater of $53.50 or $0.03 per square foot | Town of Prescott Valley Comprehensive Fee Schedule, Development Services: Mechanical, Electrical, and Plumbing Fees; charged in addition to any applicable building permit fee |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations in Prescott Valley, governed by the 2018 International Mechanical Code (IMC) as adopted by the Town. Applications are submitted via the Town's GoPost ePlan portal using the Miscellaneous Mechanical Application Checklist.
Verified 2026-07-06 · Source
Requirements
- Mechanical permit required for adding, removing, altering, or replacing (not like-for-like) mechanical/HVAC equipment
- Governed by the 2018 IMC as adopted by the Town of Prescott Valley
- Non-like-for-like scope requires a Site Plan with a mechanical layout PLUS manufacturer's specifications and calculations
- Wood Stove/Fireplace installations require a floor plan, manufacturer's specifications, and installation requirements (separate line item under 'When Do I Need a Permit?')
- Apply via the Town's GoPost ePlan online portal
Required documents
- RequiredMechanical Application / Miscellaneous Mechanical Application ChecklistTown of Prescott Valley submittal application for HVAC scope, submitted via GoPost ePlan portal
- RequiredSite Plan with Mechanical LayoutRequired if adding, removing, altering, or replacing (non-like-for-like) mechanical/HVAC equipment
- RequiredManufacturer's Specifications and CalculationsRequired alongside the site plan for non-like-for-like mechanical/HVAC work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit Fee | Greater of $26.75 or $0.02 per square foot | Town of Prescott Valley Comprehensive Fee Schedule, Development Services: Mechanical, Electrical, and Plumbing Fees; charged in addition to any applicable building permit fee |
Re-Roofing Permit
VerifiedRequired for residential and commercial re-roofing in Prescott Valley. Governed by the 2018 IRC/IBC roofing provisions and the Town's Re-Roof Application (updated 12/2024).
Verified 2026-07-06 · Source
Requirements
- Building permit required for re-roofing; the Re-Roof Application requires the site location and approximate value (valuation of labor and materials) of the re-roof project
- Application must state whether the roof material type is changing, whether any detached buildings are also being re-roofed (and if so, how many), and whether the structure is a mobile/manufactured home
- If the structure is a mobile/manufactured home AND the roof type is changing, engineering approval must be provided
- Proof of Valid Contractor's License required at submittal
- Apply via the Town's GoPost ePlan online portal
Required documents
- RequiredRe-Roof Application (updated 12/2024)Town of Prescott Valley submittal application for re-roofing, submitted via GoPost ePlan portal
- RequiredProof of Valid Contractor's LicenseTown of Prescott Valley form affirming A.R.S. Title 32, Chapter 11 contractor licensure
- OptionalEngineering ApprovalRequired only if the structure is a mobile/manufactured home and the roof type is changing
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Total Valuation of re-roof labor and materials | Same six-tier Total Valuation schedule as new residential construction ($26.75 minimum at $1-$500 valuation, scaling per the valuation brackets) | Town of Prescott Valley Comprehensive Fee Schedule, Development Services: Building Permit Fees; the Re-Roof Application itself collects 'Valuation of labor and materials' as the fee basis |
Residential Solar Photovoltaic (PV) Permit
VerifiedRequired for installation of rooftop residential solar photovoltaic systems in Prescott Valley. Governed by the Town's Solar Submittal Requirements document and the 2017 NEC as adopted by the Town. Applications are submitted via the GoPost ePlan portal using the Solar Application.
Verified 2026-07-06 · Source
Requirements
- Site plan locating all PV equipment on the drawing: PV array, combiner/junction boxes, disconnects, inverters, meter and service panel/tie-in locations, general structure footprint and property-line relation, and a roof plan showing location and physical size of all PV panels, b-vents, attic vents, and plumbing vents
- Manufacturer's specification sheets (cut sheets) with UL listing information for the PV panels, connection boxes, and PV inverter(s)
- Complete 3-line electrical diagram specifying system size (DC-STC nameplate rating), module manufacturer/model/specs (VOC, VMP, ISC, IMP), array specs with temperature-corrected max VOC, number of strings, string fuse rating, conductor sizing, grounding, overcurrent protection/disconnects, inverter specs, and grid interconnection details (AC load panel back-feed breaker rating, bus-bar/main breaker rating, line/load side tap)
- Mounting/racking system details: manufacturer's spec sheets with roof calculations designed for 115 mph wind speed, Exposure Category C, and 30 psf roof snow load per IRC R324.4.1/R324.4.1.1, including fastener type/size/spacing, OR an Arizona-stamped engineer's verification letter if a custom racking system does not span three or more trusses/rafters
- Structural information: size/type/spacing of roof framing members, roof sheathing type/thickness, number of roofing material layers, and whether the array is flush- or tilt-mounted
- Any photovoltaic system 12 kW DC or larger must be stamped by an Arizona-registered engineer
- APS (Arizona Public Service) residential service meter location requirements apply for grid interconnection
Required documents
- RequiredSolar ApplicationTown of Prescott Valley Building Permit application for solar PV installation, submitted via GoPost ePlan portal
- RequiredSolar Submittal Information / Solar Submittal RequirementsTown of Prescott Valley Help Form detailing the full minimum-content plan-submittal checklist (site plan, cut sheets, 3-line diagram, mounting/racking details, structural information)
- OptionalArizona-Stamped Engineer's Verification LetterRequired for systems 12 kW DC or larger, or for custom racking systems that do not span three or more trusses/rafters
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Total Valuation (system cost) | Same six-tier Total Valuation schedule as new residential construction ($26.75 minimum at $1-$500 valuation, scaling per the valuation brackets) | Town of Prescott Valley Comprehensive Fee Schedule, Development Services: Building Permit Fees |
| Electrical Permit Fee (in addition to Building Permit Fee) | Greater of $32.10 or $0.04 per square foot | Town of Prescott Valley Comprehensive Fee Schedule, Development Services: Mechanical, Electrical, and Plumbing Fees — solar PV installations are electrical work and incur this fee alongside the valuation-based building permit fee |
Demolition Permit
VerifiedRequired for demolition of any residential or commercial structure in Prescott Valley. Applications are submitted via the GoPost ePlan portal using the Demolition Application (2025 revised).
Verified 2026-07-06 · Source
Requirements
- Building permit required before demolishing a residential or commercial structure within Prescott Valley town limits
- Application requires description of work, valuation of labor and materials, and square footage of the structure being demolished
- Additional information may be requested depending on the specific project
- In some cases, an inspection must be scheduled BEFORE demolition work begins rather than only after completion
- Proof of Valid Contractor's License required at submittal
- Apply via the Town's GoPost ePlan online portal
Required documents
- RequiredDemolition Application (2025 revised, updated 12/2024)Town of Prescott Valley submittal application for demolition permits, submitted via GoPost ePlan portal
- RequiredProof of Valid Contractor's LicenseTown of Prescott Valley form affirming A.R.S. Title 32, Chapter 11 contractor licensure
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Total Valuation of demolition labor and materials | Same six-tier Total Valuation schedule as new residential construction ($26.75 minimum at $1-$500 valuation, scaling per the valuation brackets) | Town of Prescott Valley Comprehensive Fee Schedule, Development Services: Building Permit Fees; the Demolition Application collects 'Valuation of labor and materials' and 'Square Footage' as the fee basis |
Fence and Retaining Wall Permit
VerifiedRequired for new or replacement fences and retaining walls in Prescott Valley, with a heightened submittal bar for fences over 6 feet (commercial only) and for retaining walls.
Verified 2026-07-06 · Source
Requirements
- Fence permit required for new fences/walls; the Fence Application (2025 revised) asks whether the fence is a replacement and, if so, whether there are changes to height or material
- Fences over 6 feet are restricted to commercial applications only, and require a Detail Drawing submitted with the application
- Fences 6 feet and under (residential or commercial) do not require the additional Detail Drawing
- Retaining Wall permits require: site plan, length and height, and structural cross-section calculations (submitted using the Retaining Wall Application, filed under the Town's Fence Permit category)
- Applicants must contact Arizona Blue Stake (811) before digging to avoid impacting nearby utility lines
- Fences higher than 6 feet (commercial) require inspections scheduled through the permitting counter
Required documents
- RequiredFence Application (2025 revised, updated 12/2024)Town of Prescott Valley submittal application for fences, submitted via GoPost ePlan portal
- OptionalRetaining Wall Application (2025 revised)Town of Prescott Valley submittal application for retaining walls, requiring site plan, dimensions, and structural cross-section/calculations
- OptionalDetail DrawingRequired only for commercial fences over 6 feet in height
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Total Valuation | Same six-tier Total Valuation schedule as new residential construction ($26.75 minimum at $1-$500 valuation, scaling per the valuation brackets) | Town of Prescott Valley Comprehensive Fee Schedule, Development Services: Building Permit Fees; no separate flat-dollar fence/wall line item is published — fences and retaining walls are billed against the general valuation-based Building Permit Fee table |
EV Charger / EVSE Permit
VerifiedPrescott Valley has no EV-charger-specific permit type or fee line. An EV charger (EVSE) circuit is electrical work governed by the 2017 NEC as adopted by the Town, filed on the same Miscellaneous Electrical Application used for any other electrical addition/alteration, and billed under the Town's general Electrical Permit fee. No EV charger, electric vehicle, or EVSE line item was found on the Town's Comprehensive Fee Schedule, the Electrical Application, or its Permit Center page.
Verified 2026-07-20 · Source
Requirements
- Electrical permit required for the EV charger circuit installation (adding/altering electric service)
- Governed by the 2017 NEC as adopted by the Town of Prescott Valley (Chapter 7 of the Town Code, effective January 1, 2020)
- A Site Plan with 1-Line Diagram is required for the standard scope of adding, removing, or altering electric
- Electrical services greater than 400 amps require a Site Plan with 1-Line Diagram plus engineering approval/calculations (relevant if a panel/service upgrade is needed to support the charger)
- Proof of Valid Contractor's License and Electric Service Entrance Verification Sheet (if applicable) required at submittal
- Apply via the Town's GoPost ePlan online portal
Required documents
- RequiredElectrical Application / Miscellaneous Electrical ApplicationTown of Prescott Valley permit application, submitted via GoPost ePlan portal; there is no separate EV-charger-specific application form
- RequiredSite Plan with 1-Line DiagramRequired for the EVSE circuit addition/alteration scope
- RequiredProof of Valid Contractor's LicenseTown of Prescott Valley form affirming A.R.S. Title 32, Chapter 11 contractor licensure
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee (no EV-specific line item found) | Greater of $32.10 or $0.04 per square foot | Town of Prescott Valley Comprehensive Fee Schedule, Development Services: Mechanical, Electrical, and Plumbing Fees; the same fee used for any other electrical addition/alteration. No EV-charger-specific fee category was found. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Prescott Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.