Unincorporated Yavapai County building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Yavapai County, Arizona.

Verified 2026-07-07 · Source

How to schedule

Inspections are requested through the building department below.

Address
1120 Commerce Drive, Prescott, AZ 86305 (also: 10 S. 6th Street, Cottonwood, AZ 86326)
Phone
928-771-3214
Office hours
Permit Technicians available 7:00 AM - 5:00 PM Monday through Friday. Two public counters: Prescott (1120 Commerce Drive, 928-771-3214, fax 928-771-3432) and Cottonwood (10 S. 6th Street, 928-639-8151). All permit applications are submitted through the CitizenServe Online Permit Portal (https://www4.citizenserve.com/Portal/PortalController?Action=showHomePage&ctzPagePrefix=Portal_&installationID=300). Source: https://www.yavapaiaz.gov/Development-and-Permits/Development-Services/Customer-Service-Permitting-Unit

Inspection sequence

Applies to: Residential Building Permit (New Single-Family Residence, Addition, Remodel, Accessory Structure)

  1. 1

    Footing/Foundation

    Before concrete pour — verify footing depth (per amended frost-depth table) and reinforcement per 2024 IRC

  2. 2

    Framing

    After framing, sheathing, and rough-in trades complete, before insulation or wall cover

  3. 3

    Insulation

    Insulation installed per 2012 IECC before wall cover

  4. 4

    Final

    All work complete per approved plans; scheduled through the CitizenServe portal

Applies to: Commercial Building Permit (New Construction, Multi-Family, Remodel, Accessory Structure)

  1. 1

    Footing/Foundation

    Before concrete pour, per 2024 IBC

  2. 2

    Framing/Structural

    After structural framing complete, before wall cover

  3. 3

    Final

    All work complete per approved plans

Applies to: Grading Permit

  1. 1

    Grading/Drainage Inspection

    Verify grading performed per approved plans, cross-sections, and drainage devices per the Grading Ordinance

  2. 2

    Compaction Verification (engineered grading only)

    Compaction report confirming fill compacted to minimum 90% maximum density where supporting a structure

  3. 3

    Final

    Grading complete per approved plans; SWPPP measures in place if applicable

Applies to: Manufactured, Modular, Factory-Built, and Park Model Home Permit

  1. 1

    Foundation / Set Inspection

    County inspection of foundation, blocking, and tie-down/anchoring system before occupancy

  2. 2

    Utility Connections

    Verify electrical, plumbing, and gas connections to the unit per adopted codes

  3. 3

    Final

    Unit fully set, connected, and skirted per approved permit and Arizona Department of Housing requirements

Applies to: Pool / Spa Permit (Residential and Public/Semi-Public)

  1. 1

    Pre-Gunite / Steel

    Verify rebar and rough plumbing before gunite/shotcrete application per 2024 ISPSC/IRC

  2. 2

    Barrier Inspection

    Pool/spa barrier inspected per 2024 ISPSC barrier requirements before the pool is filled

  3. 3

    Final

    All work complete; pool/spa filled; barrier fully in place

Applies to: Septic / Onsite Wastewater System Permit

  1. 1

    Site Investigation

    Soil/site evaluation performed to determine suitability and required system type before permit issuance

  2. 2

    Installation Inspection

    Septic system components inspected before backfill/cover

  3. 3

    Final

    System complete and operational per approved permit

Unincorporated Yavapai County building permits

Get alerts for Unincorporated Yavapai County

We'll email you when Unincorporated Yavapai County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.