Electric Vehicle (EV) Charging Station / EVSE Permit (Electric Upgrade OTC Permit) — Unincorporated Yavapai County, Arizona · Requirements sheet
Verified 2026-07-20 · Source: https://www.yavapaiaz.gov/files/sharedassets/public/v/1/development-and-permits/codes-amp-regulations/documents/buildingsafetyfeeschedule.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle (EV) Charging Station / EVSE Permit (Electric Upgrade OTC Permit) in Unincorporated Yavapai County, Arizona
Yavapai County Development Services has no dedicated EV charger/EVSE permit application or fee line. An EV charging station installation is billed under the county's existing Over-the-Counter (OTC) permit category 'Electric Upgrade, Repair, or Reconnection of Service' — the same OTC category used for panel upgrades and other electrical service work, per the county's Miscellaneous Permit Applications and Plan Review Criteria page, which lists the full OTC category set: Electric Upgrade, Repair, or Reconnection of Service; Natural Gas/Propane Installations or Conversions; Plumbing Repairs or Alterations; Woodstoves; Fireplace Inserts; Demolition; and Stucco. No electric-vehicle, EV charger, or EVSE term appears anywhere on that page or its listed submittal-requirement PDFs.
Verified 2026-07-20 · Source
When you need this permit
- No standalone EV charger/EVSE permit application exists; EV charging station circuit installation is permitted under the existing 'Electric Upgrade, Repair, or Reconnection of Service' Over-the-Counter (OTC) permit category
- OTC permits are issued without the full plan-review process applied to new construction -- apply through the same Customer Service & Permitting Unit counters (Prescott or Cottonwood) or the CitizenServe Online Permit Portal used for other permits
- Work must be performed/permitted consistent with the electrical code Yavapai County has adopted for general electrical work (see the county's electrical-permit sourcing referenced elsewhere in this record for the applicable NEC edition)
- As with the county's OTC panel-upgrade permit (referenced in the paired solar-pv-permit entry), confirm current OTC fee and submittal specifics directly with Development Services (928-771-3214), since the numeric OTC fee schedule is not available from published sources
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Yavapai County Development Services, 2019 Valuation & Fee Schedule (adopted by the Board of Supervisors 12/5/2018, effective 1/14/2019, still the current schedule in force -- "shall supercede any… Show full citationHide
Yavapai County Development Services, 2019 Valuation & Fee Schedule (adopted by the Board of Supervisors 12/5/2018, effective 1/14/2019, still the current schedule in force -- "shall supercede any previously adopted Building Safety fee schedules"), "UTILITIES" table: "SINGLE PERMIT; ELECTRICAL OR PLUMBING OR MECHANICAL EACH TRADE" -- $150.00 up to $5,000.00 valuation. The fee-schedule PDF remains linked from the live Building Safety Unit page; a Wayback Machine snapshot dated 2025-02-07 of the same PDF URL corroborates its content.Review timeline
Inspection process
- 1
Electrical
Standard electrical inspection tied to the OTC Electric Upgrade permit
See the full Unincorporated Yavapai County inspection guide — scheduling & re-inspection fees →
Tips
- There is no dedicated EV charger permit category in Yavapai County -- apply for the existing 'Electric Upgrade, Repair, or Reconnection of Service' OTC permit and specify EV charging equipment installation in the application scope.
- The OTC Electric Upgrade fee is $150.00 flat for installations valued up to $5,000 (typical for a residential EV charger circuit), per the county's 2019 Valuation & Fee Schedule (confirmed against an archived copy); call Development Services directly (928-771-3214) to reconfirm the current amount if needed.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Yavapai County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Yavapai County's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Unincorporated Yavapai County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Unincorporated Yavapai County lands. Privacy.
Other permits in Unincorporated Yavapai County
Electric Vehicle (EV) Charging Station / EVSE Permit (Electric Upgrade OTC Permit) in other cities
Look up this fee in a different city →