Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of San Luis independently adopts and administers its own construction codes through its Development Services Department, Building Safety Division. Source: City of San Luis Building Inspections & Codes page (sanluisaz.gov/departments/development_services/building_safety/building_inspections_codes).2018 International Building Code (IBC), adopted by reference as the City's current uniform building code. Source: City of San Luis Building Inspections & Codes page, 'Current Codes' list, verified live July 2026.2018 International Residential Code (IRC), adopted by reference as the City's current one- and two-family dwelling code. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.2018 International Existing Building Code (IEBC), adopted by reference, governing repair, alteration, addition, and change of occupancy of existing buildings. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference, governing swimming pool, spa, and pool barrier construction. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.2018 International Property Maintenance Code (IPMC), adopted by reference, governing maintenance of existing structures and premises. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.2014 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference — one edition behind the current 2023 NEC cycle used by several neighboring Arizona cities; independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026 (not simply carried over from a stale directory). Source: City of San Luis Building Inspections & Codes page, verified live July 2026.2012 International Mechanical Code (IMC), adopted by reference — independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.2012 International Plumbing Code (IPC), adopted by reference — independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.2009 International Energy Conservation Code (IECC), adopted by reference — independently confirmed still listed as current on the City's live Building Inspections & Codes page as of July 2026; this is a notably older energy-code edition than most Arizona municipalities' current adoptions. Source: City of San Luis Building Inspections & Codes page, verified live July 2026.All of the above codes (2018 IBC, IRC, IEBC, ISPSC, IPMC; 2014 NEC; 2012 IMC, IPC; 2009 IECC) are amended by City of San Luis Ordinance No. 390, per the City's Building Inspections & Codes page. The full text of Ordinance No. 390 was not separately located on the live site as a standalone downloadable document during this verification pass; the codes-adopted list itself is sourced directly to the City's official Building Inspections & Codes webpage, which is the authoritative live citation. Source: City of San Luis Building Inspections & Codes page (sanluisaz.gov/departments/development_services/building_safety/building_inspections_codes).Manufactured homes and mobile homes: the City's Development Services fee schedule notes Manufactured Home (MH) Permit Fees for pit-set and ground-set installations are now referred to the 'State of AZ' rather than a City-set flat fee (Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing regulates factory-built construction/installation standards per A.R.S. § 41-4001 et seq.); the City separately issues a Building Permit Processing Time Frame track for 'Manufactured Home' and 'Park Model' placement (2 business days 1st review, 2 business days 2nd review, 5 business days overall). Source: City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees document; City of San Luis Building Permit Processing Time Frames (A.R.S. § 9-835 compliance document).

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family residential construction in the City of San Luis. Reviewed against the 2018 IRC as adopted and amended by City of San Luis Ordinance No. 390. Applications are submitted to the Development Services Department, Building Safety Division.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for new single-family residential construction within San Luis city limits
  • Plans must comply with the 2018 IRC as adopted and amended by City of San Luis Ordinance No. 390
  • Complete Building Permit Application with project address, subdivision name, APN, and valuation
  • Complete set of construction plans/drawings showing full scope of work; electronic PDF preferred, or 2 hard-copy sets for residential
  • Site Plan required
  • Work must be performed by a duly licensed Arizona contractor unless the owner will solely occupy the structure (owner-builder exception, subject to A.R.S. §§ 32-1151/32-1154 penalties if violated)
  • Permit becomes null and void if work does not begin within 180 days of issuance, or is suspended/abandoned for 180 days

Required documents

  • RequiredBuilding Permit ApplicationCity of San Luis Building Permit Application form, submitted to the Building Safety Division (P.O. Box 3750 - 1090 E. Union Street, San Luis, AZ 85349)
  • RequiredConstruction Plans/DrawingsComplete plan set showing scope of work; electronic PDF preferred, or 2 hard-copy sets for residential projects
  • RequiredSite PlanLot dimensions and structure location

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation$50 (valuation $1-$500); $50 + $4 per additional $100 to $2,000; $80 + $16 per additional $1,000 to $25,000; $450 + $12 per additional $1,000 to $50,000; $740 + $8 per additional $1,000 to $100,000; $1,140 + $6 per additional $1,000 to $500,000; $3,720 + $6 per additional $1,000 to $1,000,000; $6,450 + $4 per additional $1,000 above $1,000,000City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees, Schedule of Building Permit Fees (IBC/IRC/IEBC/IPMC); valuation determined using ICC Building Valuation Data published each February in Building Safety Magazine
Plan Check Fee (Residential)65% of Building Permit FeeCity of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees; paid at time of application submittal; includes up to 3 resubmittals
Deposit for Residential Plan Check (remodel/addition)$75Credited toward the Plan Check fee when the Building Permit is purchased
Reissue Certificate of Occupancy$50City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees

Residential Addition / Remodel Permit

Verified

Required for room additions, remodels, and patio structures added to existing residential dwellings in San Luis. Reviewed against the 2018 IRC as adopted and amended by City of San Luis Ordinance No. 390.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for residential additions, alterations, and patio covers/structures
  • Complete Building Permit Application (checkbox for 'Addition/Patio' project type)
  • Complete set of construction plans/drawings; 2 hard-copy sets for residential if not submitting electronically
  • Site Plan showing existing structure, addition footprint, and setbacks
  • A $75 deposit applies toward the Plan Check fee for residential plan checks involving remodeling or additions

Required documents

  • RequiredBuilding Permit ApplicationCheckbox option 'Addition/Patio', submitted to the Building Safety Division
  • RequiredSite PlanShowing existing structure, addition footprint, and setbacks

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on ValuationSame valuation-based table as new residential construction (see Residential Building Permit)City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees, Schedule of Building Permit Fees
Plan Check Fee (Residential)65% of Building Permit FeePaid at time of application submittal; includes up to 3 resubmittals
Deposit for Residential Plan Check (remodeling or additions)$75Credited toward the Plan Check fee when the Building Permit is purchased

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in San Luis, governed by the 2014 National Electrical Code (NEC) as adopted and amended by City of San Luis Ordinance No. 390.

Verified 2026-07-06 · Source

Requirements

  • Electrical permit required for service panels, feeder circuits, branch circuits, and other hard-wired electrical work
  • Governed by the 2014 NEC as adopted by City of San Luis Ordinance No. 390
  • Complete Building Permit Application listing electrical subcontractor name, phone, and license number
  • Contractor must hold a City of San Luis Business License and Arizona ROC license number

Required documents

  • RequiredBuilding/Electrical Permit ApplicationIncludes a Subcontractors table for Electric/Plumbing/HVAC with name, phone, and license number fields

Fee schedule

Fee typeAmountNotes
Issuance of each electrical permit (Residential)$50City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees, Electrical Code Fees
Issuance of each electrical permit (Commercial)$50City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees
Each service entrance panel up to and including 200 amps$20In addition to the base permit fee
Each service entrance panel up to and including 800 amps$40In addition to the base permit fee
Each service entrance panel over 800 amps$60In addition to the base permit fee
Each temporary construction service$15In addition to the base permit fee
Each feeder circuit$5In addition to the base permit fee
Each branch circuit$2In addition to the base permit fee
Each electrical pedestal for a Manufactured Home lot or space$30In addition to the base permit fee
Each supplemental permit (original not expired/cancelled/finaled)$10City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair work in San Luis, governed by the 2012 International Plumbing Code (IPC) as adopted and amended by City of San Luis Ordinance No. 390.

Verified 2026-07-06 · Source

Requirements

  • Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping
  • Governed by the 2012 IPC as adopted by City of San Luis Ordinance No. 390
  • Complete Building Permit Application listing plumbing subcontractor name, phone, and license number

Required documents

  • RequiredBuilding/Plumbing Permit ApplicationIncludes a Subcontractors table for Plumbing with name, phone, and license number fields

Fee schedule

Fee typeAmountNotes
Issuance of each plumbing permit (Residential)$50City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees, Plumbing Code Fees
Issuance of each plumbing permit (Commercial)$50City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees
Each plumbing fixture or trap (or set of fixtures on one trap)$7In addition to the base permit fee; includes water, drainage piping, and backflow protection
Each water heater and/or vent$7In addition to the base permit fee
Each gas-piping system, 1-5 outlets$10In addition to the base permit fee; each additional outlet is $2
Each private sewage disposal system$50In addition to the base permit fee
Each supplemental permit (original not expired/cancelled/finaled)$10City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations in San Luis, governed by the 2012 International Mechanical Code (IMC) as adopted and amended by City of San Luis Ordinance No. 390.

Verified 2026-07-06 · Source

Requirements

  • Mechanical permit required for installation, replacement, or relocation of HVAC equipment, furnaces, and ventilation systems
  • Governed by the 2012 IMC as adopted by City of San Luis Ordinance No. 390
  • Complete Building Permit Application listing HVAC subcontractor name, phone, and license number

Required documents

  • RequiredBuilding/Mechanical Permit ApplicationIncludes a Subcontractors table for HVAC with name, phone, and license number fields

Fee schedule

Fee typeAmountNotes
Issuance of each mechanical permit (Residential)$50City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees, Mechanical Code Fees
Issuance of each mechanical permit (Commercial)$50City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees
Installation/relocation of force-air or gravity-type furnace/burner, up to 100,000 Btu/h$15In addition to the base permit fee
Installation/relocation of force-air or gravity-type furnace/burner, over 100,000 Btu/h$18In addition to the base permit fee
Each evaporative cooler other than portable type$11In addition to the base permit fee
Each air-handling unit up to 10,000 cfm$11In addition to the base permit fee (over 10,000 cfm is $18)
Each supplemental permit (original not expired/cancelled/finaled)$10City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees

Residential Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop or ground-mount residential solar photovoltaic systems in San Luis. Governed by the 2014 NEC as adopted by City of San Luis Ordinance No. 390, with a dedicated flat-fee schedule tiered by system size.

Verified 2026-07-06 · Source

Requirements

  • Solar PV permit required for residential photovoltaic system installation; select 'Solar PV System' on the Building Permit Application
  • Governed by the 2014 NEC as adopted by City of San Luis Ordinance No. 390
  • Complete Building Permit Application with project valuation and electrical subcontractor information

Required documents

  • RequiredBuilding Permit Application (Solar PV System)Checkbox option 'Solar PV System' on the standard Building Permit Application

Fee schedule

Fee typeAmountNotes
Solar Photovoltaic System Permit — 0 to 10 kW$150City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees, Electrical Code Fees, '(NEW) Solar Photovoltaic System Permit Fees'
Solar Photovoltaic System Permit — above 10 kW$350City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees

EV Charger / EVSE Permit (Electrical Permit)

Verified

The City of San Luis has no dedicated EV charger/EVSE permit type or fee line — unlike solar PV, which received a dedicated flat-fee tier explicitly labeled '(NEW) Solar Photovoltaic System Permit Fees' on the City's Development Services fee schedule, no equivalent EV-charger line exists on that same document as of this research pass. An EV charging station (Level 2 or DC fast charger) installation is instead processed and billed as a standard Electrical Permit, governed by the 2014 National Electrical Code (NEC) as adopted and amended by City of San Luis Ordinance No. 390, using the same itemized component fee schedule (base issuance fee plus per-circuit/per-panel add-ons) documented in this file's electrical-permit entry.

Verified 2026-07-20 · Source

Requirements

  • Electrical permit required for the EV charger's dedicated circuit (branch circuit), any feeder circuit, and any service panel upgrade needed to support the charger's load
  • Governed by the 2014 NEC as adopted by City of San Luis Ordinance No. 390
  • Complete the Building/Electrical Permit Application listing the electrical subcontractor's name, phone, and license number
  • Contractor must hold a City of San Luis Business License and Arizona ROC license number
  • If the EV charger installation requires a service panel upgrade (e.g., to accommodate a new 40-60A circuit), that scope is billed under the same electrical permit's per-panel-size fee tier

Required documents

  • RequiredBuilding/Electrical Permit ApplicationSame application used for all electrical work in San Luis (includes a Subcontractors table for Electric/Plumbing/HVAC with name, phone, and license number fields); no dedicated EV-charger checkbox exists, so select the standard electrical permit type

Fee schedule

Fee typeAmountNotes
Issuance of each electrical permit (Residential)$50City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees, Electrical Code Fees — same base fee applied to any electrical permit including an EV charger circuit, since no dedicated EV-charger fee line exists
Each feeder circuit$5In addition to the base permit fee; applicable if the EV charger installation requires a new feeder circuit
Each branch circuit$2In addition to the base permit fee; the dedicated circuit run to a Level 2 EV charger would typically be billed under this line
Each service entrance panel up to and including 200 amps$20In addition to the base permit fee; applicable only if the EV charger installation requires a panel upgrade or new service entrance
Each service entrance panel up to and including 800 amps$40In addition to the base permit fee

Demolition Permit

Verified

Required for demolition of any residential or commercial structure in San Luis. Reviewed by the Building Safety Division under the City's A.R.S. § 9-835 timeframes.

Verified 2026-07-06 · Source

Requirements

  • Building permit required before demolishing a residential or commercial structure within San Luis city limits
  • Complete Building Permit Application specifying scope of demolition work
  • Site Plan showing the structure(s) to be demolished
  • Coordination with Yuma County / Arizona Department of Environmental Quality (ADEQ) may be required for asbestos abatement (NESHAP) prior to demolition — confirm current requirements directly with the Building Safety Division and ADEQ, as the City's own published materials do not detail a specific county-level demolition coordination step the way some other Arizona cities do

Required documents

  • RequiredBuilding Permit Application (Demolition)Submitted to the Building Safety Division
  • RequiredSite PlanLot dimensions and location of structure(s) to be demolished

Fee schedule

Fee typeAmountNotes
Demolition Permits$50City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees, Fee Schedule for IBC, IRC, IEBC, IPMC

Manufactured Home / Park Model Placement Permit

Verified

Required for placement of a manufactured home or park model on a lot or space in San Luis. Construction/installation standards for the factory-built unit itself are regulated by the State of Arizona; the City issues the local placement permit covering foundation/tie-down, zoning compliance, electrical pedestal connection, and site improvements.

Verified 2026-07-06 · Source

Requirements

  • City building permit required for placement of a manufactured home (pit-set or ground-set) or park model on a lot or space within San Luis city limits
  • Factory-built construction/installation standards for the unit itself are regulated directly by the State of Arizona (Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing, A.R.S. § 41-4001 et seq.) — the City's own Manufactured Home permit fee line item now refers applicants to the 'State of AZ' rather than charging a separate flat City fee for the pit-set/ground-set fee itself
  • Electrical pedestal for a manufactured home lot or space requires a separate electrical permit fee
  • Complete Building Permit Application specifying manufactured home or park model placement

Required documents

  • RequiredBuilding Permit ApplicationSubmitted to the Building Safety Division, specifying manufactured home/park model placement
  • RequiredSite PlanLot dimensions, setbacks, and placement location

Fee schedule

Fee typeAmountNotes
MH Permit Fee — Pit SetReferred to State of AZCity of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees; prior City flat fee of $300 (pit-set) has been superseded by a reference to State of Arizona fee/regulation rather than a City-set dollar figure
MH Permit Fee — Ground SetReferred to State of AZCity of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees; prior City flat fee of $150 (ground-set) has been superseded by a reference to State of Arizona fee/regulation rather than a City-set dollar figure
Each electrical pedestal for a Manufactured Home lot or space$30City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees, Electrical Code Fees

Fire Sprinkler Permit

Verified

Required for installation or alteration of fire sprinkler systems in San Luis. A dedicated checkbox category on the City's standard Building Permit Application, billed per square foot rather than by valuation.

Verified 2026-07-06 · Source

Requirements

  • Fire sprinkler permit required for new sprinkler system installation; select 'Fire Sprinkler' on the Building Permit Application
  • Fire sprinkler alterations of 1-25 heads may be issued as an over-the-counter permit at no fee; 26-50 heads also no fee (with a $1.00 charge per additional device over 50)
  • Reviewed by the Building Safety Division in coordination with the Fire Department

Required documents

  • RequiredBuilding Permit Application (Fire Sprinkler)Checkbox option 'Fire Sprinkler' on the standard Building Permit Application

Fee schedule

Fee typeAmountNotes
Fire Sprinkler Permits (new system, per square foot)$2.92 per square footCity of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees, Fee Schedule for IBC, IRC, IEBC, IPMC
Fire Sprinkler alterations — 1-25 heads$0 (over-the-counter permit)City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees, Fire Code Fees
Fire Sprinkler alterations — 26-50 heads$0 (for each additional device over 50, $1.00 charge)City of San Luis Development Services and Public Works Application and Permit — Notice and Proposed Fees, Fire Code Fees

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the San Luis building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /arizona/yuma-county/san-luis/as-of/2026-07-06/

Snapshot date: 2026-07-06

Commit: e952c53

Reproducible from PermitBase’s version-controlled dataset, commit e952c53.