Skip to main content
PermitBase

This is PermitBase’s published record for Somerton as of 2026-08-01. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Somerton building permits

Verified

Somerton, Arizona — as published 2026-08-01.

Verified 2026-07-06 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9, Chapter 7, Article 1, §§ 9-801 et seq.). The City of Somerton independently adopts and administers its own construction codes through its Community Development Department / Building Safety and Code Enforcement Office. Source: City of Somerton Ordinance No. 2019-002 (passed and ordained September 17, 2019, effective December 17, 2019), repealing and replacing Somerton City Code Article 7-1-1 (Building Reference Codes) and Article 7-1-7 (Permits).2018 International Building Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(A), effective 12/17/2019.2018 International Residential Code for one- and two-family dwellings, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(B).2018 International Existing Building Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(C).2018 International Property Maintenance Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(D).2018 International Swimming Pool and Spa Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(E).National Fire Protection Association Code, 2018 Edition (NFPA-1, Fire Code), with Appendices, as published by the National Fire Protection Association, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(F).National Electrical Code NFPA-70, 2014 Edition, with Appendices, as published by the National Fire Protection Association, adopted by reference with certain City of Somerton amendments (one edition behind the 2018 ICC suite). Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(G); confirmed current as of July 2026 on the City's Building Safety and Code Enforcement webpage, which lists 'Current adopted Building Codes, as of December 17, 2019.'2012 International Fuel Gas Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(H).2012 International Mechanical Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(I).2012 International Plumbing Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(J).2009 International Energy Conservation Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(K).Each of these code editions was independently cross-checked against the City's own Building Safety and Code Enforcement webpage (accessed July 2026, server-rendered content, not just a stale directory listing) and against the individually published amendment PDFs for each code (2018 IBC, 2018 IRC, 2018 IEBC, 2014 NEC, 2012 IFGC, 2012 IMC, 2012 IPC, 2009 IECC), all hosted at the City's own cms2.revize.com document repository — none had been superseded by a newer adoption ordinance as of this review. Source: City of Somerton Building Safety and Code Enforcement webpage; individual code-amendment PDFs (e.g., cms2.revize.com/revize/somertonaz/2018%20IBC.pdf, 2014%20NEC.pdf, 2012%20IFGC.pdf, 2012%20IMC.pdf, 2012%20IPC.pdf, 2009%20IECC.pdf).Permits are required in connection with the issuance of certificates and collection of fees under each adopted code; exemptions from permit requirements follow the exemptions in each adopted code as amended. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-7 (Permits).

Permit types & fees

New Residential Building Permit

Verified

Required for new single-family residential construction in the City of Somerton. Reviewed against the 2018 IRC and City of Somerton amendments (Ordinance No. 2019-002, effective December 17, 2019). Applications are submitted via the City's On-line Permit Portal, by email, or in person at 143 N. State Ave.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for new single-family residential construction within Somerton city limits
  • Plans reviewed against the 2018 IRC and City of Somerton amendments; City is located within Seismic Design Category D, basic wind speed 115 mph
  • Two (2) sets of scaled plans required, including: Site Plan, Foundation Plan, Floor Plan, Elevations Plan, Plumbing & Electrical Plans, and Framing Details
  • Zoning designation (R1-6, R1-8, or R1-10), setbacks, lot coverage, and maximum building height must be identified on the submittal
  • Plans for structurally complex dwellings must be prepared by an Arizona Licensed Architect or Arizona Registered Engineer; a one-story single-family dwelling does not require this
  • Building Application Form (New Residential) plus Building Contractor's Information page (licensed contractor info or Owner-Builder exemption under A.R.S. §32-1121A.5/A.6) required
  • Disclosure required regarding whether the property is within the 65/70/75 dB noise contour or High Noise and Accident Potential Zone of Marine Corps Air Station-Yuma/Yuma International Airport

Required documents

  • RequiredBuilding Application Form (New Residential)City of Somerton Building Application Form, New Residential box checked, submitted via On-line Permit Portal, email, or in person at 143 N. State Ave.
  • RequiredTwo (2) Sets of Scaled PlansSite Plan, Foundation Plan, Floor Plan, Elevations Plan, Plumbing & Electrical Plans, Framing Details; zoning, setbacks/lot coverage, and max building height noted
  • RequiredBuilding Contractor's Information / Owner-Builder ExemptionLicensed contractor name, ROC license number and class, or A.R.S. §32-1121A.5/A.6 owner-builder/owner-developer exemption declaration

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Valuation-Based$1-$500: $50; $501-$2,000: $50 for first $500 plus $4 per add'l $100; $2,001-$25,000: $80 for first $2,000 plus $16 per add'l $1,000; $25,001-$50,000: $450 for first $25,000 plus $12 per add'l $1,000; $50,001-$100,000: $740 for first $50,000 plus $8 per add'l $1,000; $100,001-$500,000: $1,140 for first $100,000 plus $6 per add'l $1,000; $500,001-$1,000,000: $3,720 for first $500,000 plus $6 per add'l $1,000; $1,000,001+: $6,450 for first $1,000,000 plus $4 per add'l $1,000City of Somerton Permit Fees Sheet; valuation calculated per square footage using the ICC Building Safety Journal Building Valuation Data Table, August 2023 edition (Resolution No. 2026-004, Exhibit 'A'), with a construction-type multiplier
Plan Check Fee65% of the building permit feeCity of Somerton Permit Fees Sheet; includes up to 2 resubmittals and 2 inspections per phase per Resolution No. 2026-004
Phased, Partial, or Deferred Submittal Permits200% of single permit fee (initial and subsequent permits)City of Somerton Permit Fees Sheet — reflects added coordination time for multi-phase projects
Expedited Plan ReviewDouble the plan review feeResolution No. 2026-004 — expedited timeline is 3 business days (residential) / 10 business days (commercial)

Residential Remodel / Addition Permit

Verified

Required for residential remodels, room additions, garage conversions, and re-roofing projects that do not qualify for the City's limited re-roof exemption, in the City of Somerton. Reviewed against the 2018 IRC as adopted and amended by the City (Ordinance No. 2019-002). The City's Remodel Application form is used for this category and lists a Roofing Contractor as one of the licensed-trade line items alongside general, electrical, plumbing, and other trades — Somerton does not publish a separate stand-alone roofing permit type or fee.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for residential remodels, additions, garage conversions, and re-roofing projects not covered by the exemption below
  • Exemption: re-roofing with the SAME roofing material, provided no more than two layers of asphalt shingles are applied over an existing asphalt shingle roof, does not require a permit
  • Two (2) sets of scaled plans required: Site Plan, Foundation Plan, Floor Plan, Elevations Plan, Plumbing & Electrical Plans, Framing Details; zoning (R1-6/R1-8/R1-10), setbacks/lot coverage, and max building height noted
  • Building Application Form (Remodel), indicating Residential or Non-Residential type of remodel
  • Licensed Contractors list on the Remodel application includes separate line items for General, Mechanical, Electrical, Plumbing, Concrete, Framing, Insulation, Roofing, Drywall, Exterior Stucco, Painting, Cabinet, Trim Finishers, Flooring, Landscaping, and Block Wall contractors
  • Fee for remodeling projects is based on job cost (material and labor), not square footage valuation

Required documents

  • RequiredBuilding Application Form (Remodel)City of Somerton Building Application Form, 'Remodel' selected under Other, with Residential/Non-Residential checkbox
  • RequiredTwo (2) Sets of Scaled PlansSite Plan, Foundation Plan, Floor Plan, Elevations Plan, Plumbing & Electrical Plans, Framing Details
  • RequiredBuilding Contractor's Information / Licensed Contractors ListLists all trade contractors involved (including Roofing Contractor line item), ROC license numbers, or Owner-Builder exemption declaration

Fee schedule

Fee typeAmountNotes
Remodel/Alteration Fee — Based on Job CostCalculated from job cost (material and labor); new construction/additional square footage on an existing building is charged per-foot per the ICC Valuation TableCity of Somerton Permit Fees Sheet; Resolution No. 2026-004, 'Remodels and Alterations to an Existing Building or Structure' section
Two or More Trades Involved in Remodel/Alteration$100Resolution No. 2026-004, Remodels and Alterations section; also stated on the Electrical and Mechanical Fee Sheets
Plan Check Fee65% of the building permit feeCity of Somerton Permit Fees Sheet

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in the City of Somerton, governed by the 2014 National Electrical Code (NEC) as adopted and amended by the City (Ordinance No. 2019-002). Includes a standalone flat-fee Electrical (APS) Clearance for turning on power with no other work.

Verified 2026-07-06 · Source

Requirements

  • Electrical permit required for service panels, feeder/branch circuits, fixtures, appliances, power apparatus, signs, and other hard-wired electrical work
  • Governed by the 2014 NEC as adopted by the City of Somerton, with local amendments
  • Electrical (APS) Clearance — for turning on service with no other work performed — is a distinct flat-fee, same general-permit-application track
  • Detailed unit fee schedule applies (base fee plus itemized per-fixture/per-circuit/per-service fees)
  • Building Application Form or dedicated Permit Application (Electrical Clearance/Main Panel Upgrade) required depending on scope

Required documents

  • RequiredBuilding/Electrical Permit ApplicationGeneral Permit Application form (checkbox for Electrical Clearance: Residential/Commercial) or Main Panel Upgrade Application, submitted via portal, email, or in person
  • RequiredBuilding Contractor's InformationLicensed electrical contractor ROC number and class, or Owner-Builder exemption declaration

Fee schedule

Fee typeAmountNotes
Issuing Each Electrical Permit (Base Fee)$50City of Somerton Electrical Fee Sheet; Resolution No. 2026-004, Electrical Permit Fees section
Electrical (APS) Clearance (existing main panel, restore service only, no other work)$50
Resolution No. 2026-004, Building Safety Fees section; Show full citation

Resolution No. 2026-004, Building Safety Fees section; also listed as $45 'Clearance – Existing Main Panel to restore service ONLY' on the Electrical Fee Sheet issuance-fee line — the $50 flat 'Electrical (APS) Clearance' line item in the current master fee resolution is the authoritative current figure

Supplemental Permit (original not expired/canceled/finaled)$7City of Somerton Electrical Fee Sheet; Resolution No. 2026-004
Service Entrance Panel up to 200 amps$50City of Somerton Electrical Fee Sheet; Resolution No. 2026-004
Service Entrance Panel up to 800 amps$75City of Somerton Electrical Fee Sheet; Resolution No. 2026-004
Temporary Power Service$45-$50City of Somerton Electrical Fee Sheet ($45 per service); Resolution No. 2026-004 lists $50 for 'Each Temporary Power Service' plus a separate $45 line for temporary pole/pedestal service with decorative lighting/sales-lot use
Feeder Circuit / Branch Circuit$5 per feeder circuit; $2 per branch circuitCity of Somerton Electrical Fee Sheet; Resolution No. 2026-004
Receptacle/Switch/Light Fixtures$1.50 each for first 20 fixtures, $1.00 each additionalCity of Somerton Electrical Fee Sheet, Category 02/03 Unit Fee Schedule
Fixed Residential/Non-Residential Appliances (up to 1 HP/kW/kVA)$5 per eachCity of Somerton Electrical Fee Sheet, Category 04/05
Power Apparatus (motors, generators, transformers, A/C, heat pumps, etc.)$5 (up to 1 HP/kW) to $67 (over 100 HP/kW), tiered by ratingCity of Somerton Electrical Fee Sheet, Category 06
Services (600V or less, over 200-1,000A / over 600V or 1,000A)$50 (≤200A); $75 (201-1,000A); $125 (over 600V or 1,000A)City of Somerton Electrical Fee Sheet, Category 08
Two or More Trades Involved$100City of Somerton Electrical Fee Sheet, Category 01

Plumbing Permit

Verified

Required for plumbing and fuel-gas installation, alteration, or repair work in the City of Somerton, governed by the 2012 International Plumbing Code (IPC) as adopted and amended by the City (Ordinance No. 2019-002). Includes a standalone flat-fee Water Heater Replacement/Installation and a Gas Clearance.

Verified 2026-07-06 · Source

Requirements

  • Plumbing permit required for fixtures, traps, sewers, water heaters, water piping, drainage/vent piping, lawn sprinkler backflow protection, and interceptors
  • Governed by the 2012 IPC as adopted by the City of Somerton, with local amendments
  • Fuel Gas permit required separately for gas-piping systems, gas furnaces/heaters, gas boilers/compressors, and gas air-handling units, governed by the 2012 International Fuel Gas Code
  • Water Heater Replacement/Installation and Gas Clearance (South West or other) both use the City's general Permit Application form and are flat-fee, same-location replacements
  • Base fee for issuing a plumbing permit is $20 (or $25 per Resolution No. 2026-004); base fee for a fuel gas permit is $50

Required documents

  • RequiredBuilding/Plumbing/Gas Permit ApplicationGeneral Permit Application (Water Heater Replacement/Installation or Gas Clearance checkbox) or Building Application Form for larger plumbing scope, submitted via portal, email, or in person
  • RequiredBuilding Contractor's InformationLicensed plumbing contractor ROC number and class, or Owner-Builder exemption declaration

Fee schedule

Fee typeAmountNotes
Issuing Each Plumbing Permit (Base Fee)$20 (Plumbing Fee Sheet) / $25 (Resolution No. 2026-004)City of Somerton Plumbing and Gas Fee Sheet lists $20; Resolution No. 2026-004 (effective 7/1/2026) lists $25 as the current base fee — the Resolution is the more recent authoritative source
Water Heater/Plumbing Replacement (Same Location)$50Resolution No. 2026-004, Building Safety Fees section (flat fee, same as the standalone application form's GL Code 501 fee structure)
Gas Clearance$50Resolution No. 2026-004, Building Safety Fees section
Issuing Each Fuel Gas Permit (Base Fee)$50City of Somerton Plumbing and Gas Fee Sheet; Resolution No. 2026-004
Plumbing Fixture or Trap (incl. water/drainage piping and backflow protection)$7 per fixtureCity of Somerton Plumbing and Gas Fee Sheet, Category 01
Building Sewer / Trailer Park Sewer$15 per sewerCity of Somerton Plumbing and Gas Fee Sheet
Private Sewage Disposal System$40 per systemCity of Somerton Plumbing and Gas Fee Sheet
Water Heater and/or Vent$7 per unitCity of Somerton Plumbing and Gas Fee Sheet
Gas Piping System (1-5 outlets / additional outlets)$5-$7 for 1-5 outlets; $1 per additional outletCity of Somerton Plumbing and Gas Fee Sheet, Category 03
Supplemental Permit (original not expired/canceled/finaled)$7 (Plumbing Fee Sheet) / $17 (Plumbing, Resolution 2026-004) / $7 (Gas)City of Somerton Plumbing and Gas Fee Sheet lists $7 for both plumbing and gas supplemental permits; Resolution No. 2026-004 updates the plumbing supplemental permit fee to $17

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations in the City of Somerton, governed by the 2012 International Mechanical Code (IMC) as adopted and amended by the City (Ordinance No. 2019-002). Includes a standalone flat-fee A/C Unit Replacement Permit.

Verified 2026-07-06 · Source

Requirements

  • Mechanical permit required for installation, replacement, or relocation of furnaces, boilers, compressors, air handlers, evaporative coolers, and ventilation/exhaust equipment
  • Governed by the 2012 IMC as adopted by the City of Somerton, with local amendments
  • A/C Unit Replacement (ground or roof-mounted) uses the City's general Permit Application form and requires unit size/specifications and a site plan indication
  • Base fee for issuing a mechanical permit is $50, with itemized additional fees by equipment category and capacity

Required documents

  • RequiredA/C Replacement / General Permit ApplicationCity of Somerton general Permit Application, 'A/C Unit Replacement' checkbox (Ground or Roof), with unit size and site plan indication
  • RequiredBuilding Contractor's InformationLicensed mechanical/HVAC contractor ROC number and class, or Owner-Builder exemption declaration
  • RequiredEquipment SpecificationsManufacturer cut sheets/specifications required for A/C unit replacement (marked '**Specifications Required' on the application)

Fee schedule

Fee typeAmountNotes
A/C Replacement Permit$50Resolution No. 2026-004, Building Safety Fees section; matches GL Account 10-32-21, Code 501 shown on the A/C Replacement Application form
Issuing Each Mechanical Permit (Base Fee)$50City of Somerton Mechanical Fee Sheet; Resolution No. 2026-004
Forced-Air/Gravity-Type Furnace (up to 100,000 BTU/H)$15 per installationCity of Somerton Mechanical Fee Sheet, Category 02
Forced-Air/Gravity-Type Furnace (over 100,000 BTU/H)$18 per installationCity of Somerton Mechanical Fee Sheet, Category 02
Boiler/Compressor or Absorption System (tiered by horsepower/BTU)$15 (up to 3 HP/100,000 BTU/H) to $93 (over 50 HP/1,750,000 BTU/H)City of Somerton Mechanical Fee Sheet, Category 05
Air-Handling Unit (up to 10,000 cfm / over 10,000 cfm)$11 / $18 per unitCity of Somerton Mechanical Fee Sheet, Category 06
Evaporative Cooler (other than portable)$11 per coolerCity of Somerton Mechanical Fee Sheet, Category 07
Supplemental Permit (original not expired/canceled/finaled)$7City of Somerton Mechanical Fee Sheet, Category 01
Two or More Trades Involved$100City of Somerton Mechanical Fee Sheet, Category 01

Residential Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop or ground-mounted residential solar photovoltaic systems in the City of Somerton. Applications are submitted on the City's dedicated Solar Installation Building Application, which captures system size (inverter power in kW), module/inverter counts, roof area/coverage, and roof type (flat or pitched).

Verified 2026-07-06 · Source

Requirements

  • Solar PV installation requires a building permit via the City's dedicated Solar Installation Building Application
  • Application must specify Service ID, Meter ID, total inverter power (kW), number of PV modules, number of inverters, total roof area, roof coverage percentage, and roof type (flat or pitched)
  • Two (2) sets of scaled plans required: Site Plan, Foundation Plan, Floor Plan, Elevations Plan, Plumbing & Electrical Plans, Framing Details
  • Governed by the 2014 NEC as adopted by the City of Somerton for electrical interconnection work
  • Fee is tiered by system size: 0-10kW vs. above 10kW

Required documents

  • RequiredSolar Installation Building ApplicationCity of Somerton dedicated Solar Installation form capturing system specifications (kW, module/inverter counts, roof type/coverage)
  • RequiredTwo (2) Sets of Scaled PlansSite Plan, Elevations Plan, Foundation Plan, Floor Plan, Plumbing & Electrical Plans, Framing Details
  • RequiredBuilding Contractor's InformationLicensed solar/electrical contractor ROC number and class, or Owner-Builder exemption declaration

Fee schedule

Fee typeAmountNotes
Solar Photovoltaic System Permit Fee (0 to 10 kW)$150Resolution No. 2026-004, Building Safety Fees section
Solar Photovoltaic System Permit Fee (above 10 kW)$350Resolution No. 2026-004, Building Safety Fees section
Solar Photovoltaic System Permit Fee — Residential and Non-Residential Installation (alternate line item in same Resolution)$100
Resolution No. 2026-004 lists this as a second, separately-labeled Solar Photovoltaic System Permit Fee line immediately below the tiered $150/$350 table; Show full citation

Resolution No. 2026-004 lists this as a second, separately-labeled Solar Photovoltaic System Permit Fee line immediately below the tiered $150/$350 table; the tiered figures are treated as the primary/authoritative fee structure since they are more specific to system size, but this flat $100 alternate line item appears in the same current fee resolution and should be confirmed with Community Development staff at time of application if it applies to a specific installation type

Demolition Permit

Verified

Required for demolition of any structure in the City of Somerton, using the City's dedicated Demolition Building Application. A flat fee applies and the City requires two inspections for demolition permits.

Verified 2026-07-06 · Source

Requirements

  • Building permit required before demolishing any structure within Somerton city limits
  • Application must indicate number of buildings and housing units affected
  • Building Application Form ('Other: Demolition' checked) plus Building Contractor's Information page required
  • Two inspections are required for demolition permits per the City's fee schedule

Required documents

  • RequiredDemolition Building ApplicationCity of Somerton Building Application Form, 'Other: Demolition' indicated, submitted via portal, email, or in person
  • RequiredBuilding Contractor's Information / Owner-Builder ExemptionLicensed demolition contractor ROC number and class, or Owner-Builder exemption declaration

Fee schedule

Fee typeAmountNotes
Demolition Permit$50Resolution No. 2026-004, Building Safety Fees section: 'Demolition Permit (will require 2 inspections) — $50'

Fence / Block Wall Permit

Verified

Required for block, Mexican brick, or other masonry perimeter wall/fence construction of 6 feet in height or greater in the City of Somerton. Uses the City's general Permit Application (Wall Fence checkbox) and must conform to City of Yuma Standard Detail Drawing No. 3-310, which Somerton has adopted by reference for non-retaining concrete block wall construction.

Verified 2026-07-06 · Source

Requirements

  • Building permit required from the City Building Official when wall height is 6 feet or greater
  • Construction must conform to City of Yuma Standard Detail Drawing No. 3-310 (Non-Retaining Concrete Block Wall): grouted vertical reinforcing steel (#4 bars at 24 in. O.C.), Class 'B' concrete footing, ASTM C-90 Grade 'A' concrete block, plumb walls, expansion joints at maximum 50-ft spacing
  • Application must specify type of block, size of rebar, and footing depth x width
  • Building safety inspection required prior to placing footing concrete and grouting activities
  • Walls may not extend into visibility triangles at alleys, driveways, and street intersections
  • Graffiti-inhibiting coating required for walls within City right-of-way

Required documents

  • RequiredWall/Fence Permit ApplicationCity of Somerton general Permit Application, 'Wall Fence: Block, Mexican brick or other' checkbox, with type of block, rebar size, and footing dimensions specified
  • RequiredBuilding Contractor's InformationLicensed block wall contractor ROC number and class, or Owner-Builder exemption declaration

Fee schedule

Fee typeAmountNotes
Wall/Fence Construction Permit$50Resolution No. 2026-004, Building Safety Fees section ('Fence Construction Permit — $50'); matches GL Account 10-32-21, Code 501 shown on the Block Wall Application form

EV Charger / EVSE Permit

Verified

The City of Somerton has no separate electric-vehicle-charging-station permit or dedicated EV/EVSE fee line-item. An EV charger installation is treated as electrical work under the same Electrical Permit process documented in this file's Electrical Permit entry (governed by the 2014 NEC as adopted), with the itemized Electrical Fee Sheet's 'Power Apparatus' unit-fee category (Category 06, which explicitly covers motors, generators, transformers, A/C units, heat pumps, and similar equipment tiered by HP/kW/kVA rating) the closest applicable fee line for a rated charging unit, plus the standard $50 base fee for issuing an electrical permit.

Verified 2026-07-20 · Source

Requirements

  • Electrical permit required for the EV charger circuit, governed by the 2014 NEC as adopted by the City of Somerton with local amendments — same requirement and application track as this file's Electrical Permit entry
  • No dedicated EV/EVSE checkbox, application form, or fee line was found on the City's Building Permit Applications page, Electrical Fee Sheet, or Resolution No. 2026-004 fee schedule
  • Fee computed from the itemized Electrical Fee Sheet unit-fee categories applicable to the installed equipment (e.g., Power Apparatus Category 06, tiered by HP/kW/kVA rating, for a rated charging unit; or Service Entrance Panel fees if a panel upgrade is also performed), plus the standard $50 base fee for issuing an electrical permit
  • Licensed electrical contractor ROC number/class or Owner-Builder exemption declaration required, same as the general Electrical Permit

Required documents

  • RequiredBuilding/Electrical Permit ApplicationGeneral Permit Application form (no dedicated EV/EVSE checkbox), submitted via portal, email, or in person
  • RequiredBuilding Contractor's InformationLicensed electrical contractor ROC number and class, or Owner-Builder exemption declaration

Fee schedule

Fee typeAmountNotes
Issuing Each Electrical Permit (Base Fee)$50City of Somerton Electrical Fee Sheet; Resolution No. 2026-004, Electrical Permit Fees section — no dedicated EV/EVSE fee line exists
Power Apparatus (closest applicable category for a rated charging unit)$5 (up to 1 HP/kW) to $67 (over 100 HP/kW), tiered by ratingCity of Somerton Electrical Fee Sheet, Category 06 — covers motors, generators, transformers, A/C, heat pumps, and similar rated equipment; not an EV-specific line, but the closest published category matching a rated charging unit
Service Entrance Panel up to 200 amps (if panel upgrade required)$50City of Somerton Electrical Fee Sheet; Resolution No. 2026-004

Commercial Building Permit

Verified

Required for new commercial and industrial building construction in the City of Somerton, reviewed against the 2018 IBC with City of Somerton amendments (Ordinance No. 2019-002, effective December 17, 2019). The City maintains a dedicated Commercial/Industrial Building Application packet — distinct from the residential forms — that bundles the Building Application Form (Commercial/Multi-Family, Commercial, Industrial, and Sign checkboxes), a Commercial and Industrial Project Data Sheet, a Landscape Data Sheet, a Plan Check Review Submittal Checklist for Commercial and Multi-Family Site Plans, and the Building Contractor's Information pages. Applications are submitted via the City's On-line Permit Portal, by email, or in person at 143 N. State Ave. The application states in red: 'Per A.R.S § 9-835, INCOMPLETE SUBMITTALS WILL NOT BE ACCEPTED.'

Verified 2026-08-01 · Source

Requirements

  • Building permit required for new commercial/industrial construction within Somerton city limits; reviewed against the 2018 IBC as adopted and amended by the City (Ordinance No. 2019-002), with the 2014 NEC, 2012 IFGC, 2012 IMC, 2012 IPC, and 2009 IECC governing the respective trades
  • Design criteria: City of Somerton is within Seismic Design Category D; basic (ultimate) wind speed is 115 mph
  • Plans for particular occupancies must be prepared by an Arizona Licensed Architect or Arizona Registered Engineer in accordance with state law; at initial submittal, drawings, calculations, and supporting documents must bear the preparing professional's name and license number
  • Commercial and Industrial Project Data Sheet required: gross/net site acreage, existing zoning, lot coverage %, total building area, building and landscape setbacks (required vs. provided), parking spaces required/provided, and proposed screening; an additional 10-foot buffer area is required if the site is adjacent to AG-zoned (agricultural) land
  • Plan Check Review Submittal Checklist quantities: Site Plan — five (5) 24"x36" prints with Registered Arizona Architect or Civil Engineer seal and signature; Preliminary Grading and Drainage Plan — three (3) prints with Registered Arizona Civil Engineer stamp (stormwater retention calculations required); Landscaping Plan — two (2) prints; Floor Plan — one (1) print with AZ Registered Architect stamp; Elevations — one (1) print with AZ Registered Architect stamp; Outdoor Lighting — two (2) prints with catalogue cuts for all exterior fixtures
  • Engineering (structural) plans and calculations: two (2) complete sets of structural calculations (and truss calculations if applicable) with the architect's or engineer's original wet signature and stamp on both sets; structural design criteria (wind, seismic) shown on plans
  • State Energy Conservation Information: all new and existing structures with conditioned space must provide energy calculations, with all energy-calculation requirements shown on the plans
  • A separate Sign Package application (with its own fee) is required for all multi-tenant, commercial, and industrial projects
  • When submitting through the On-line Permit Portal, the full plan set (site plan, architectural, structural, mechanical, plumbing, electrical) must be one combined PDF file, with truss calculations, structural calculations, and supporting documents (e.g., geotechnical report) as separate PDFs
  • Building Contractor's Information page required: licensed contractor ROC number and class per trade, or Owner-Builder/Owner-Developer exemption under A.R.S. §32-1121A.5/A.6
  • Disclosure required regarding whether the property is within the 65/70/75 dB noise contour or High Noise and Accident Potential Zone of Marine Corps Air Station-Yuma/Yuma International Airport

Required documents

  • RequiredBuilding Application Form (Commercial/Industrial packet)City of Somerton Building Application Form with Commercial/Multi-Family, Commercial, Industrial, or Sign checkbox, including Subject Property Information (job cost, number of buildings) and mandatory property-owner signature
  • RequiredCommercial and Industrial Project Data Sheet + Landscape Data SheetSite acreage, zoning, lot coverage, building/landscape setbacks, parking counts, screening, landscape setbacks per Zoning Ordinance Sections 11(F)/11(G), and monument/wall-signage data
  • RequiredSite Plan, Grading & Drainage, Landscaping, Floor Plan, Elevations, Outdoor Lighting printsPer the Plan Check Review Submittal Checklist: 5 site-plan prints (AZ Architect or Civil Engineer seal), 3 grading/drainage prints (AZ Civil Engineer stamp), 2 landscaping prints, 1 floor-plan print and 1 elevations print (AZ Architect stamp), 2 outdoor-lighting prints, all 24"x36" folded to ~9"x12"
  • RequiredStructural Plans and CalculationsTwo complete wet-stamped/wet-signed sets of structural (and truss, if applicable) calculations cross-referenced to plans, per the Drawing Submittal Requirements for New Commercial/Industrial Plans
  • RequiredBuilding Contractor's InformationLicensed contractor names, ROC license numbers and classes for each trade, or A.R.S. §32-1121A.5/A.6 owner-builder/owner-developer exemption declaration
  • OptionalSign Package ApplicationSeparate application and fee, stated as required for all multi-tenant, commercial, and industrial projects; two scaled prints with sign dimensions, materials, illumination, and site plan/elevation locations (Zoning Ordinance Section 9)

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Valuation-Based$1-$500: $50; $501-$2,000: $50 for first $500 plus $4 per add'l $100; $2,001-$25,000: $80 for first $2,000 plus $16 per add'l $1,000; $25,001-$50,000: $450 for first $25,000 plus $12 per add'l $1,000; $50,001-$100,000: $740 for first $50,000 plus $8 per add'l $1,000; $100,001-$500,000: $1,140 for first $100,000 plus $6 per add'l $1,000; $500,001-$1,000,000: $3,720 for first $500,000 plus $6 per add'l $1,000; $1,000,001+: $6,450 for first $1,000,000 plus $4 per add'l $1,000
City of Somerton Permit Fees Sheet — one valuation table for new structures (no separate commercial-only table); Show full citation

City of Somerton Permit Fees Sheet — one valuation table for new structures (no separate commercial-only table); valuation is calculated per square foot using the ICC Building Safety Journal Building Valuation Data Table, August 2023 edition (Resolution No. 2026-004, Exhibit 'A'), with a construction-type multiplier

Plan Check Fee65% of the building permit feeCity of Somerton Permit Fees Sheet; per Resolution No. 2026-004 the fee for all permits includes plan-check review with up to 2 resubmittals and 2 inspections per phase
Deferred Submittals for Separate Construction Plans Components (Commercial)$300Resolution No. 2026-004, Building Safety Fees section (residential equivalent is $100)
Phased, Partial, or Deferred Submittal Permits200% of single permit fee (initial and subsequent permits)City of Somerton Permit Fees Sheet — reflects added coordination time for multi-phase projects
Expedited Plan Review (Commercial: 10 business days)Double the plan review feeResolution No. 2026-004, Additional Fees section
Temporary Certificate of Occupancy$100Resolution No. 2026-004, Additional Fees section

Commercial Tenant Improvement Permit

Verified

Required for interior remodels, alterations, and build-outs of existing commercial space in the City of Somerton. Tenant Improvement is a genuinely distinct review track here: the City publishes a dedicated 'Drawing Submittal Requirements for Tenant Improvement Plan' guideline (separate from its New Commercial/Industrial guideline), its A.R.S. § 9-835 timeframes document carries a distinct 'Commercial Building – Addition or Alteration' row, and TI fees follow the Remodels and Alterations fee structure (per-trade unit fees / job cost) rather than the square-footage valuation method used for new commercial buildings. Applications use the City's Building Application Form (Remodel) with the Non-Residential box checked, submitted via the On-line Permit Portal, email, or in person.

Verified 2026-08-01 · Source

Requirements

  • Building permit required for tenant improvements/alterations to existing commercial space; reviewed against the 2018 IBC and 2018 International Existing Building Code as adopted and amended by the City (Ordinance No. 2019-002)
  • Plot Plan: fully dimensioned site plan with existing lot lines, all existing improvements, existing use of all adjacent structures on and off site, existing/proposed utilities, and existing disabled-access conditions with proposed site changes
  • Floor Plan: fully dimensioned, identifying all existing occupied spaces; existing exiting system (number, width, distance, direction, hardware) including corridors; all occupancy separations clearly identified with the fire-resistive rating of each; proposed construction shown; existing and new T-bar ceiling details
  • Wall Section: typical wall section indicating stud size, height, spacing, insulation, wall finish, and structural connections
  • Plumbing Plan: isometric and schematic of water, gas, and drain-waste-vent systems with line sizes and materials; cross-sections at existing firewalls and ceilings
  • Mechanical Plan: isometric/schematic of existing and new duct locations and sizes, return air, fire dampers, combustion air method and amount, existing and new HVAC unit locations, and complete details of any new kitchen hood systems
  • Electrical Plan: single-line diagram of existing and new systems (service location, feeder sizes, panel locations, conductor sizes, disconnect size, overcurrent protection, grounding), panel schedule with circuit identification, all outlet/fixture/equipment locations, hazardous electrical locations as applicable, and complete electrical load calculations
  • State Energy Conservation Information: energy calculations are required for all new AND existing structures with conditioned space, with all requirements shown on the plans
  • Building Application Form (Remodel) with the Non-Residential checkbox, plus the Licensed Contractors list (general, mechanical, electrical, plumbing, drywall, flooring, and other trade line items) or Owner-Builder exemption under A.R.S. §32-1121A.5/A.6

Required documents

  • RequiredBuilding Application Form (Remodel — Non-Residential)City of Somerton Building Application Form, 'Remodel' selected with the Non-Residential checkbox, submitted via portal, email, or in person at 143 N. State Ave.
  • RequiredTenant Improvement Plan SetPer the City's Drawing Submittal Requirements for Tenant Improvement Plan: Plot Plan, Floor Plan, Wall Section, Required Details, Plumbing Plan, Mechanical Plan, Electrical Plan, and State Energy Conservation calculations; for portal submittals the full set must be one combined PDF
  • RequiredBuilding Contractor's Information / Licensed Contractors ListAll trade contractors involved with ROC license numbers and classes, or Owner-Builder exemption declaration

Fee schedule

Fee typeAmountNotes
Remodel/Alteration Fee — Job Cost / Per-Trade Unit FeesCalculated from job cost (material and labor) per the Permit Fees Sheet; Resolution No. 2026-004's 'Remodels and Alterations to an Existing Building or Structure' section directs that remodel/alteration work be calculated using the per-trade unit fee schedules (electrical, mechanical, plumbing, fuel gas), while new construction/additional square footage added to an existing building is charged per-foot per the ICC Valuation TableBoth published methods are stated here as the City publishes them; confirm the computed total with Community Development at submittal
Two or More Trades Involved in Remodel/Alteration$100Resolution No. 2026-004, Remodels and Alterations section; also stated on the Electrical and Mechanical Fee Sheets
Plan Check Fee65% of the building permit feeCity of Somerton Permit Fees Sheet
Change of Use Permit / Certificate of Occupancy Update$50 base fee + required Remodel and Alteration feesResolution No. 2026-004, Building Safety Fees section — 'Required for all new businesses in existing buildings'
Deferred Submittals for Separate Construction Plans Components (Commercial)$300Resolution No. 2026-004, Building Safety Fees section
Expedited Plan Review (Commercial: 10 business days)Double the plan review feeResolution No. 2026-004, Additional Fees section
Temporary Certificate of Occupancy$100Resolution No. 2026-004, Additional Fees section

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Somerton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-20)Later version (2026-08-20) →View current record →All versions →

Permalink: /arizona/yuma-county/somerton/as-of/2026-08-01/

Snapshot date: 2026-08-01

Commit: 854b4c1

Reproducible from PermitBase’s version-controlled dataset, commit 854b4c1.