Somerton building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Somerton, Arizona.
Last verified 2026-07-06 · Source · Embed this page’s badge · Version history
Building department
- Address
- 143 N. State Ave. (2nd Floor), P.O. Box 638, Somerton, AZ 85350
- Phone
- 928-722-7399
- Office hours
- City Hall hours as of August 12, 2024: closed every other Friday (contact 928-722-7400 for the current schedule); Building Inspector observes modified Summer Hours during peak heat months. To schedule a building inspection, call (928) 722-7399 before 3:00 PM Monday-Friday, or email Maria Ybarra (Permit Technician), at least one business day in advance. Plans/applications may be submitted via the On-line Permit Portal, by email, or in person at 143 N. State Ave.
- Website
- Official site
- Permit portal
- Apply online at Somerton's portal
Inspection guide
See how inspections work in Somerton — sequence, scheduling & re-inspection fees.
Codes adopted
Arizona has no statewide building code for non-state buildings; codes are adopted locally. According to the International Code Council, codes are adopted locally in Arizona and are predominantly the I-codes, with different cities and counties choosing their own editions and local amendments. The Arizona State Fire Code (adopting the 2018 IFC) applies only to state and county buildings, public and private schools, and non-residential occupancies in areas without a locally adopted fire code — it does not establish a statewide residential or commercial building code floor. Each city and county adopts its own code editions independently, resulting in different I-Code years and amendment sets across jurisdictions. There is no state-mandated minimum edition; enforcement is entirely local. Always confirm the adopted edition and any local amendments with the specific jurisdiction before submitting plans.
- Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9, Chapter 7, Article 1, §§ 9-801 et seq.). The City of Somerton independently adopts and administers its own construction codes through its Community Development Department / Building Safety and Code Enforcement Office. Source: City of Somerton Ordinance No. 2019-002 (passed and ordained September 17, 2019, effective December 17, 2019), repealing and replacing Somerton City Code Article 7-1-1 (Building Reference Codes) and Article 7-1-7 (Permits).
- 2018 International Building Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(A), effective 12/17/2019.
- 2018 International Residential Code for one- and two-family dwellings, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(B).
- 2018 International Existing Building Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(C).
- 2018 International Property Maintenance Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(D).
- 2018 International Swimming Pool and Spa Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(E).
- National Fire Protection Association Code, 2018 Edition (NFPA-1, Fire Code), with Appendices, as published by the National Fire Protection Association, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(F).
- National Electrical Code NFPA-70, 2014 Edition, with Appendices, as published by the National Fire Protection Association, adopted by reference with certain City of Somerton amendments (one edition behind the 2018 ICC suite). Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(G); confirmed current as of July 2026 on the City's Building Safety and Code Enforcement webpage, which lists 'Current adopted Building Codes, as of December 17, 2019.'
- 2012 International Fuel Gas Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(H).
- 2012 International Mechanical Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(I).
- 2012 International Plumbing Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(J).
- 2009 International Energy Conservation Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(K).
- Each of these code editions was independently cross-checked against the City's own Building Safety and Code Enforcement webpage (accessed July 2026, server-rendered content, not just a stale directory listing) and against the individually published amendment PDFs for each code (2018 IBC, 2018 IRC, 2018 IEBC, 2014 NEC, 2012 IFGC, 2012 IMC, 2012 IPC, 2009 IECC), all hosted at the City's own cms2.revize.com document repository — none had been superseded by a newer adoption ordinance as of this review. Source: City of Somerton Building Safety and Code Enforcement webpage; individual code-amendment PDFs (e.g., cms2.revize.com/revize/somertonaz/2018%20IBC.pdf, 2014%20NEC.pdf, 2012%20IFGC.pdf, 2012%20IMC.pdf, 2012%20IPC.pdf, 2009%20IECC.pdf).
- Permits are required in connection with the issuance of certificates and collection of fees under each adopted code; exemptions from permit requirements follow the exemptions in each adopted code as amended. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-7 (Permits).
Permit types & fees
New Residential Building Permit
Required for new single-family residential construction in the City of Somerton. Reviewed against the 2018 IRC and City of Somerton amendments (Ordinance No. 2019-002, effective December 17, 2019). Applications are submitted via the City's On-line Permit Portal, by email, or in person at 143 N. State Ave.
Residential Remodel / Addition Permit
Required for residential remodels, room additions, garage conversions, and re-roofing projects that do not qualify for the City's limited re-roof exemption, in the City of Somerton. Reviewed against the 2018 IRC as adopted and amended by the City (Ordinance No. 2019-002). The City's Remodel Application form is used for this category and lists a Roofing Contractor as one of the licensed-trade line items alongside general, electrical, plumbing, and other trades — Somerton does not publish a separate stand-alone roofing permit type or fee.
Electrical Permit
Required for electrical installation, alteration, or repair work in the City of Somerton, governed by the 2014 National Electrical Code (NEC) as adopted and amended by the City (Ordinance No. 2019-002). Includes a standalone flat-fee Electrical (APS) Clearance for turning on power with no other work.
Plumbing Permit
Required for plumbing and fuel-gas installation, alteration, or repair work in the City of Somerton, governed by the 2012 International Plumbing Code (IPC) as adopted and amended by the City (Ordinance No. 2019-002). Includes a standalone flat-fee Water Heater Replacement/Installation and a Gas Clearance.
Mechanical / HVAC Permit
Required for heating, ventilation, and air conditioning installations in the City of Somerton, governed by the 2012 International Mechanical Code (IMC) as adopted and amended by the City (Ordinance No. 2019-002). Includes a standalone flat-fee A/C Unit Replacement Permit.
Residential Solar Photovoltaic (PV) Permit
Required for installation of rooftop or ground-mounted residential solar photovoltaic systems in the City of Somerton. Applications are submitted on the City's dedicated Solar Installation Building Application, which captures system size (inverter power in kW), module/inverter counts, roof area/coverage, and roof type (flat or pitched).
Demolition Permit
Required for demolition of any structure in the City of Somerton, using the City's dedicated Demolition Building Application. A flat fee applies and the City requires two inspections for demolition permits.
Fence / Block Wall Permit
Required for block, Mexican brick, or other masonry perimeter wall/fence construction of 6 feet in height or greater in the City of Somerton. Uses the City's general Permit Application (Wall Fence checkbox) and must conform to City of Yuma Standard Detail Drawing No. 3-310, which Somerton has adopted by reference for non-retaining concrete block wall construction.
EV Charger / EVSE Permit
The City of Somerton has no separate electric-vehicle-charging-station permit or dedicated EV/EVSE fee line-item. An EV charger installation is treated as electrical work under the same Electrical Permit process documented in this file's Electrical Permit entry (governed by the 2014 NEC as adopted), with the itemized Electrical Fee Sheet's 'Power Apparatus' unit-fee category (Category 06, which explicitly covers motors, generators, transformers, A/C units, heat pumps, and similar equipment tiered by HP/kW/kVA rating) the closest applicable fee line for a rated charging unit, plus the standard $50 base fee for issuing an electrical permit.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- No data reported
- Trailing 12 months
- 1units
5 of 12 months reported · #76 in Arizona coverage by units
- Year to date (2026 YTD through 2026-05)
- 27units
27 buildings · $7.4M valuation
4 month(s) reported to Census
- Full year 2025
- 32units
32 buildings · $9.4M valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Arizona building activity
Tips & gotchas
- Arizona has no statewide mandatory building code — the City of Somerton independently adopts and amends its own construction codes (Ordinance No. 2019-002, effective December 17, 2019) and runs its own Community Development Department / Building Safety and Code Enforcement Office; it does not defer to Yuma County for permitting within city limits, though it does incorporate a City of Yuma construction standard (No. 3-310) by reference for block walls.
- Somerton's code adoption is an unusually granular multi-edition stack, verified individually rather than assumed uniform: 2018 IBC, 2018 IRC, 2018 IEBC, 2018 IPMC, 2018 ISPSC, 2018 NFPA-1 (Fire), 2014 NEC, 2012 IFGC, 2012 IMC, 2012 IPC, and 2009 IECC — all confirmed current as of July 2026 against the City's own live Building Safety and Code Enforcement webpage and the individually hosted amendment PDFs; none had been superseded by a newer adoption ordinance.
- Building permit fees for new construction are valuation-based using the ICC Building Safety Journal Building Valuation Data Table, August 2023 edition (Exhibit 'A' of Resolution No. 2026-004), while remodels are billed on job cost (material + labor); Plan Check fee is 65% of the building permit fee, and phased/partial/deferred submittals are billed at 200% of the single permit fee.
- A.R.S. § 9-835 Building Permit Processing Time Frames are formally published (contact: Sergio Jimenez, Building Inspector, 928-722-5083) with distinct Administrative Completeness / 1st Review / 2nd Review business-day allotments for every major permit category — most residential categories (New, Addition/Alteration, Elec./Plumb./Mech., Solar PV, Demolition, Standard Floor Plans) total 11 business days overall (1/5/5); Manufactured Home and Park Model are fastest at 5 business days overall (1/2/2); larger categories like Commercial Building - New/Shell/Multi-Family New run 27 business days overall (2/15/10).
- Somerton does NOT publish a distinct stand-alone roofing/re-roofing permit type or fee — re-roofing that isn't exempt (same material, ≤2 layers of asphalt shingles over an existing asphalt-shingle roof) is processed via the general Remodel Application, which lists 'Roofing Contractor' as one of many trade line items.
- A cluster of common trade-specific work is billed as flat $50 fees on the City's general Permit Application rather than the itemized unit-fee schedules: Water Heater/Plumbing Replacement (same location), Demolition Permit (requires 2 inspections), A/C Replacement Permit, Fence Construction Permit, Gas Clearance, and Electrical (APS) Clearance — all confirmed in Resolution No. 2026-004 and cross-matched to the GL Account 10-32-21 / Code 501 shown on the standalone application forms.
- Solar Photovoltaic System Permit Fee has two differently-structured line items within the SAME current fee resolution (No. 2026-004): a tiered $150 (0-10kW) / $350 (above 10kW) table, and a separate flat $100 'Residential and Non-Residential Installation' line immediately below it. This record treats the tiered table as primary since it is more specific to system size, but flags the discrepancy — applicants should confirm the applicable fee with Community Development staff at submittal.
- A block/masonry wall or fence requires a City building permit only once it reaches 6 feet in height or greater; construction must conform to City of Yuma Standard Detail Drawing No. 3-310 (Non-Retaining Concrete Block Wall), which Somerton incorporates by reference rather than publishing its own independent wall detail.
- The 'Fence/Block Wall' permit category is not separately itemized in the City's own A.R.S. § 9-835 timeline document — this record applies the general 'Residential Building – Addition or Alteration' timeline (11 business days) as the closest published analog, since block-wall applications are reviewed by the same Building Safety plan-review process; this is flagged as an inference rather than a distinct published fence-specific timeline.
- Every remodel/alteration project involving two or more trades carries an additional flat $100 fee on top of the trade-specific fees, per the Electrical Fee Sheet, Mechanical Fee Sheet, and Resolution No. 2026-004.
- Owner-Builder / Owner-Developer contractor-licensing exemptions under A.R.S. §32-1121A.5 and A.R.S. §32-1121A.6 are built into every City of Somerton Building Application form; critically, the Handyman Exemption (A.R.S. §32-1121.14) explicitly does NOT apply once a building permit is required or total material/labor cost reaches $750.
- The AZBO Directory's 'Amendment' framing for each adopted code edition (2018 I-Codes, 2014 NEC, 2012 IFGC/IMC/IPC, 2009 IECC) was independently verified against Ordinance No. 2019-002 and against each code's individually published City amendment PDF — the directory listing was accurate and not stale as of this July 2026 review.
- The Building Safety and Code Enforcement webpage, Plan Review Procedures page, and Building Permit Applications page are all built on a Revize CMS (cms2.revize.com) that renders full page content server-side but obfuscates email addresses via JavaScript and serves document links as bare relative paths resolving to the CMS document root (cms2.revize.com/revize/somertonaz/) rather than the page's own URL path — a plain header-less fetch of the .gov pages returns HTTP 403, but adding realistic browser headers (User-Agent, Accept, Referer) succeeds without needing Wayback Machine fallback for any of these pages.