EV Charger / EVSE Permit in Somerton, Arizona
The City of Somerton has no separate electric-vehicle-charging-station permit or dedicated EV/EVSE fee line-item. An EV charger installation is treated as electrical work under the same Electrical Permit process documented in this file's Electrical Permit entry (governed by the 2014 NEC as adopted), with the itemized Electrical Fee Sheet's 'Power Apparatus' unit-fee category (Category 06, which explicitly covers motors, generators, transformers, A/C units, heat pumps, and similar equipment tiered by HP/kW/kVA rating) the closest applicable fee line for a rated charging unit, plus the standard $50 base fee for issuing an electrical permit.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for the EV charger circuit, governed by the 2014 NEC as adopted by the City of Somerton with local amendments — same requirement and application track as this file's Electrical Permit entry
- No dedicated EV/EVSE checkbox, application form, or fee line was found on the City's Building Permit Applications page, Electrical Fee Sheet, or Resolution No. 2026-004 fee schedule
- Fee computed from the itemized Electrical Fee Sheet unit-fee categories applicable to the installed equipment (e.g., Power Apparatus Category 06, tiered by HP/kW/kVA rating, for a rated charging unit; or Service Entrance Panel fees if a panel upgrade is also performed), plus the standard $50 base fee for issuing an electrical permit
- Licensed electrical contractor ROC number/class or Owner-Builder exemption declaration required, same as the general Electrical Permit Owner-builderContractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Wiring, box placement, and panel connections before walls are closed
- 2
Final / Clearance
Charging equipment installed, circuit labeled, protections verified per 2014 NEC
See the full Somerton inspection guide — scheduling & re-inspection fees →
Tips
- Somerton has no EV-specific permit category — apply through the same general Electrical Permit process, and expect the fee to be computed from the itemized unit-fee schedule (most likely the Power Apparatus category for a rated charging unit) rather than a flat EV charger fee.
- If your installation requires a panel upgrade to support the charger's amperage, budget for the separate Service Entrance Panel fee line in addition to the Power Apparatus fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Somerton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Somerton
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Arizona →
Look up this fee in a different city →