Commercial Tenant Improvement Permit in Somerton, Arizona
Required for interior remodels, alterations, and build-outs of existing commercial space in the City of Somerton. Tenant Improvement is a genuinely distinct review track here: the City publishes a dedicated 'Drawing Submittal Requirements for Tenant Improvement Plan' guideline (separate from its New Commercial/Industrial guideline), its A.R.S. § 9-835 timeframes document carries a distinct 'Commercial Building – Addition or Alteration' row, and TI fees follow the Remodels and Alterations fee structure (per-trade unit fees / job cost) rather than the square-footage valuation method used for new commercial buildings. Applications use the City's Building Application Form (Remodel) with the Non-Residential box checked, submitted via the On-line Permit Portal, email, or in person.
Verified 2026-08-01 · Source
When you need this permit
- Building permit required for tenant improvements/alterations to existing commercial space; reviewed against the 2018 IBC and 2018 International Existing Building Code as adopted and amended by the City (Ordinance No. 2019-002)
- Plot Plan: fully dimensioned site plan with existing lot lines, all existing improvements, existing use of all adjacent structures on and off site, existing/proposed utilities, and existing disabled-access conditions with proposed site changes
- Floor Plan: fully dimensioned, identifying all existing occupied spaces; existing exiting system (number, width, distance, direction, hardware) including corridors; all occupancy separations clearly identified with the fire-resistive rating of each; proposed construction shown; existing and new T-bar ceiling details
- Wall Section: typical wall section indicating stud size, height, spacing, insulation, wall finish, and structural connections
- Plumbing Plan: isometric and schematic of water, gas, and drain-waste-vent systems with line sizes and materials; cross-sections at existing firewalls and ceilings
- Mechanical Plan: isometric/schematic of existing and new duct locations and sizes, return air, fire dampers, combustion air method and amount, existing and new HVAC unit locations, and complete details of any new kitchen hood systems
- Electrical Plan: single-line diagram of existing and new systems (service location, feeder sizes, panel locations, conductor sizes, disconnect size, overcurrent protection, grounding), panel schedule with circuit identification, all outlet/fixture/equipment locations, hazardous electrical locations as applicable, and complete electrical load calculations
- State Energy Conservation Information: energy calculations are required for all new AND existing structures with conditioned space, with all requirements shown on the plans
- Building Application Form (Remodel) with the Non-Residential checkbox, plus the Licensed Contractors list (general, mechanical, electrical, plumbing, drywall, flooring, and other trade line items) or Owner-Builder exemption under A.R.S. §32-1121A.5/A.6 Owner-builderContractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In (Trades)
Electrical, plumbing, mechanical, and fuel-gas rough-in — including fire dampers and occupancy-separation penetrations shown on the approved TI plans — before walls and ceilings are closed
- 2
Final / Certificate of Occupancy
Completed work verified against approved plans; new businesses occupying existing buildings also require the Change of Use Permit / Certificate of Occupancy Update ($50 base + remodel fees)
See the full Somerton inspection guide — scheduling & re-inspection fees →
Tips
- Somerton treats TI as its own review track — use the City's dedicated 'Drawing Submittal Requirements for Tenant Improvement Plan' guideline, which is lighter than the new-commercial guideline (no foundation plan, roof plan, or landscape package) but adds existing-condition documentation: occupancy separations with fire-resistive ratings, existing exiting system, existing/new fire dampers, and T-bar ceiling details.
- If the tenant improvement supports a new business moving into an existing building, budget for the Change of Use Permit / Certificate of Occupancy Update — a $50 base fee plus required Remodel and Alteration fees, per Resolution No. 2026-004.
- The City publishes two fee bases for remodel work: the Permit Fees Sheet states remodeling fees are based on job cost (material and labor), while Resolution No. 2026-004 directs remodel/alteration work to the per-trade unit fee schedules; any new square footage added is charged per-foot per the ICC Valuation Table. Confirm the computed total with Community Development staff before budgeting.
- Every remodel/alteration involving two or more trades carries an additional flat $100 fee on top of the trade-specific fees.
- Fire sprinkler or fire alarm modifications triggered by the TI are reviewed under the separate 'Commercial Building - Fire' 11-business-day track, with Fire Department fees per Resolution No. 2026-004 (Fire Sprinkler alterations $38 for 1-25 heads / $71 for 26-50 heads; Fire Alarm $38-$104 by device count).
- New kitchen hood systems require complete details on the mechanical plan, per the TI drawing submittal requirements — relevant for restaurant build-outs.
- Energy calculations are required even for TI work in existing buildings whenever conditioned space is involved, under the 2009 IECC as adopted.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Somerton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Somerton.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Somerton
Commercial Tenant Improvement Permit in other cities
Compare commercial tenant improvement permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Somerton project checklist
Describe your project once and get every permit, document, and fee it triggers in Somerton — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →