Residential Solar Photovoltaic (PV) Permit in Somerton, Arizona

Required for installation of rooftop or ground-mounted residential solar photovoltaic systems in the City of Somerton. Applications are submitted on the City's dedicated Solar Installation Building Application, which captures system size (inverter power in kW), module/inverter counts, roof area/coverage, and roof type (flat or pitched).

Verified 2026-07-06 · Source

When you need this permit

  • Solar PV installation requires a building permit via the City's dedicated Solar Installation Building Application
  • Application must specify Service ID, Meter ID, total inverter power (kW), number of PV modules, number of inverters, total roof area, roof coverage percentage, and roof type (flat or pitched)
  • Two (2) sets of scaled plans required: Site Plan, Foundation Plan, Floor Plan, Elevations Plan, Plumbing & Electrical Plans, Framing Details
  • Governed by the 2014 NEC as adopted by the City of Somerton for electrical interconnection work
  • Fee is tiered by system size: 0-10kW vs. above 10kW

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Solar Photovoltaic System Permit Fee (0 to 10 kW)Resolution No. 2026-004, Building Safety Fees section
$150
Solar Photovoltaic System Permit Fee (above 10 kW)Resolution No. 2026-004, Building Safety Fees section
$350
Solar Photovoltaic System Permit Fee — Residential and Non-Residential Installation (alternate line item in same Resolution)Resolution No. 2026-004 lists this as a second, separately-labeled Solar Photovoltaic System Permit Fee line immediately below the tiered $150/$350 table; the tiered figures are treated as the primary/authoritative fee structure since they are more specific to system size, but this flat $100 alternate line item appears in the same current fee resolution and should be confirmed with Community Development staff at time of application if it applies to a specific installation type
$100

Review timeline

Plan reviewSomerton’s published plan-review target
8–12 business days

How long did your Residential Solar Photovoltaic (PV) Permit permit actually take in Somerton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, electrical connections, and interconnection point verified

See the full Somerton inspection guide — scheduling & re-inspection fees →

Tips

  • Per the City's A.R.S. § 9-835 Building Permit Processing Time Frames document, 'Residential Building – Solar PV' carries a 1-business-day Administrative Completeness Review, 5 business days for 1st review, and 5 business days for 2nd review (if needed), for an overall review time of 11 business days; the corresponding Commercial/Residential Multi-Family Solar PV category is 12 business days (2/5/5) — the 8-12 day range in this record reflects both tracks.
  • The application requires you to specify whether the roof is flat or pitched, plus total roof area and coverage percentage — have this data ready before submitting.
  • There are two differently-structured Solar PV fee line items in the current Resolution No. 2026-004 (a tiered $150/$350-by-size table and a separate flat $100 line) — confirm with Community Development which applies to your specific project before budgeting.

Frequently asked questions

Somerton requires a residential solar photovoltaic (pv) permit for: Solar PV installation requires a building permit via the City's dedicated Solar Installation Building Application; Application must specify Service ID, Meter ID, total inverter power (kW), number of PV modules, number of inverters, total roof area, roof coverage percentage, and roof type (flat or pitched); Two (2) sets of scaled plans required: Site Plan, Foundation Plan, Floor Plan, Elevations Plan, Plumbing & Electrical Plans, Framing Details; Governed by the 2014 NEC as adopted by the City of Somerton for electrical interconnection work; Fee is tiered by system size: 0-10kW vs. above 10kW. If your project isn't listed, confirm with City of Somerton Community Development Department — Building Safety and Code Enforcement at 928-722-7399 before starting work.

Per Resolution No. 2026-004 (effective July 1, 2026), the Solar Photovoltaic System Permit Fee is $150 for installations rated 0 to 10 kW and $350 for installations rated above 10 kW.

Per the City's A.R.S. § 9-835 Building Permit Processing Time Frames document, 'Residential Building – Solar PV' has an overall review time of 11 business days (1 day administrative completeness, 5 days first review, 5 days second review if needed).

You'll need: Solar Installation Building Application; Two (2) Sets of Scaled Plans; Building Contractor's Information. See the required-documents checklist on this page for details on each.

Somerton requires 2 inspection(s) for a residential solar photovoltaic (pv) permit, in order: Rough Electrical, Final. Schedule each through City of Somerton Community Development Department — Building Safety and Code Enforcement (928-722-7399).

Apply through City of Somerton Community Development Department — Building Safety and Code Enforcement at 143 N. State Ave. (2nd Floor), P.O. Box 638, Somerton, AZ 85350. Phone: 928-722-7399, email: MariaYbarra@Somertonaz.gov. Office hours: City Hall hours as of August 12, 2024: closed every other Friday (contact 928-722-7400 for the current schedule); Building Inspector observes modified Summer Hours during peak heat months. To schedule a building inspection, call (928) 722-7399 before 3:00 PM Monday-Friday, or email Maria Ybarra (Permit Technician), at least one business day in advance. Plans/applications may be submitted via the On-line Permit Portal, by email, or in person at 143 N. State Ave.. Official information: https://www.somertonaz.gov/departments/community_development_services/building_safety_and_code_enforcement.php.

Somerton, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9, Chapter 7, Article 1, §§ 9-801 et seq.). The City of Somerton independently adopts and administers its own construction codes through its Community Development Department / Building Safety and Code Enforcement Office. Source: City of Somerton Ordinance No. 2019-002 (passed and ordained September 17, 2019, effective December 17, 2019), repealing and replacing Somerton City Code Article 7-1-1 (Building Reference Codes) and Article 7-1-7 (Permits).; 2018 International Building Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(A), effective 12/17/2019.; 2018 International Residential Code for one- and two-family dwellings, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(B).; 2018 International Existing Building Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(C).; 2018 International Property Maintenance Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(D).; 2018 International Swimming Pool and Spa Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(E).; National Fire Protection Association Code, 2018 Edition (NFPA-1, Fire Code), with Appendices, as published by the National Fire Protection Association, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(F).; National Electrical Code NFPA-70, 2014 Edition, with Appendices, as published by the National Fire Protection Association, adopted by reference with certain City of Somerton amendments (one edition behind the 2018 ICC suite). Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(G); confirmed current as of July 2026 on the City's Building Safety and Code Enforcement webpage, which lists 'Current adopted Building Codes, as of December 17, 2019.'; 2012 International Fuel Gas Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(H).; 2012 International Mechanical Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(I).; 2012 International Plumbing Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(J).; 2009 International Energy Conservation Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(K).; Each of these code editions was independently cross-checked against the City's own Building Safety and Code Enforcement webpage (accessed July 2026, server-rendered content, not just a stale directory listing) and against the individually published amendment PDFs for each code (2018 IBC, 2018 IRC, 2018 IEBC, 2014 NEC, 2012 IFGC, 2012 IMC, 2012 IPC, 2009 IECC), all hosted at the City's own cms2.revize.com document repository — none had been superseded by a newer adoption ordinance as of this review. Source: City of Somerton Building Safety and Code Enforcement webpage; individual code-amendment PDFs (e.g., cms2.revize.com/revize/somertonaz/2018%20IBC.pdf, 2014%20NEC.pdf, 2012%20IFGC.pdf, 2012%20IMC.pdf, 2012%20IPC.pdf, 2009%20IECC.pdf).; Permits are required in connection with the issuance of certificates and collection of fees under each adopted code; exemptions from permit requirements follow the exemptions in each adopted code as amended. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-7 (Permits).. Local amendments apply — see the Somerton overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Somerton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.