Somerton building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Somerton, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
143 N. State Ave. (2nd Floor), P.O. Box 638, Somerton, AZ 85350
Phone
928-722-7399
Office hours
City Hall hours as of August 12, 2024: closed every other Friday (contact 928-722-7400 for the current schedule); Building Inspector observes modified Summer Hours during peak heat months. To schedule a building inspection, call (928) 722-7399 before 3:00 PM Monday-Friday, or email Maria Ybarra (Permit Technician), at least one business day in advance. Plans/applications may be submitted via the On-line Permit Portal, by email, or in person at 143 N. State Ave.

Published scheduling rules

  • The City does not publish a named commercial inspection-sequence checklist; the sequence above reflects the inspection stages required by the adopted codes (2018 IBC and trade codes) and the fee schedule's own line items (2 inspections per phase included; Temporary C of O available). To schedule any inspection, call (928) 722-7399 or email the Permit Technician at least one business day in advance. (Commercial Building Permit)

Inspection sequence

Applies to: Commercial Building Permit

  1. 1

    Foundation/Footing

    Reinforcement, anchor-bolt, and footing verification before concrete pour, per the 2018 IBC as adopted

  2. 2

    Underground/Rough-In (Trades)

    Electrical, plumbing, mechanical, and fuel-gas rough-in before concealment, per the adopted 2014 NEC, 2012 IPC, 2012 IMC, and 2012 IFGC

  3. 3

    Framing

    Structural framing, connections, and fire-resistive assemblies against the approved wet-stamped plans

  4. 4

    Final / Certificate of Occupancy

    Completed work verified against approved plans before occupancy; a Temporary Certificate of Occupancy is available for $100 per Resolution No. 2026-004

Applies to: New Residential Building Permit

  1. 1

    Foundation/Footing

    Before concrete pour

  2. 2

    Framing

    Structural framing, connections, plumbing/electrical rough-in per 2018 IRC and City of Somerton amendments

  3. 3

    Final

    Completed work verified against approved plans prior to Certificate of Occupancy

Applies to: Plumbing Permit

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

Applies to: Commercial Tenant Improvement Permit

  1. 1

    Rough-In (Trades)

    Electrical, plumbing, mechanical, and fuel-gas rough-in — including fire dampers and occupancy-separation penetrations shown on the approved TI plans — before walls and ceilings are closed

  2. 2

    Final / Certificate of Occupancy

    Completed work verified against approved plans; new businesses occupying existing buildings also require the Change of Use Permit / Certificate of Occupancy Update ($50 base + remodel fees)

Applies to: Demolition Permit

  1. 1

    Pre-Demolition/Utility Disconnect Inspection

    Verifies utilities have been properly terminated before demolition begins

  2. 2

    Final Demolition Inspection

    Confirms complete removal of structure and site clearance; two inspections are required per Resolution No. 2026-004

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final / Clearance

    Devices installed, panel labeled, protections verified per 2014 NEC

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final / Clearance

    Charging equipment installed, circuit labeled, protections verified per 2014 NEC

Applies to: Fence / Block Wall Permit

  1. 1

    Footing/Pre-Pour

    Required prior to placing footing concrete and grouting activities per City of Yuma Standard No. 3-310

  2. 2

    Final

    Completed wall verified for height, reinforcement, and setback/visibility-triangle compliance

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified

Applies to: Residential Remodel / Addition Permit

  1. 1

    Foundation/Framing (if applicable)

    Required for additions and structural remodels prior to closing walls

  2. 2

    Final

    Completed work verified against approved plans

Applies to: Residential Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, electrical connections, and interconnection point verified

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Somerton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Somerton building permits

Get alerts for Somerton

We'll email you when Somerton's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.