Electrical Permit in Somerton, Arizona

Required for electrical installation, alteration, or repair work in the City of Somerton, governed by the 2014 National Electrical Code (NEC) as adopted and amended by the City (Ordinance No. 2019-002). Includes a standalone flat-fee Electrical (APS) Clearance for turning on power with no other work.

Verified 2026-07-06 · Source

When you need this permit

  • Electrical permit required for service panels, feeder/branch circuits, fixtures, appliances, power apparatus, signs, and other hard-wired electrical work
  • Governed by the 2014 NEC as adopted by the City of Somerton, with local amendments
  • Electrical (APS) Clearance — for turning on service with no other work performed — is a distinct flat-fee, same general-permit-application track
  • Detailed unit fee schedule applies (base fee plus itemized per-fixture/per-circuit/per-service fees)
  • Building Application Form or dedicated Permit Application (Electrical Clearance/Main Panel Upgrade) required depending on scope

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Issuing Each Electrical Permit (Base Fee)City of Somerton Electrical Fee Sheet; Resolution No. 2026-004, Electrical Permit Fees section
$50
Electrical (APS) Clearance (existing main panel, restore service only, no other work)Resolution No. 2026-004, Building Safety Fees section; also listed as $45 'Clearance – Existing Main Panel to restore service ONLY' on the Electrical Fee Sheet issuance-fee line — the $50 flat 'Electrical (APS) Clearance' line item in the current master fee resolution is the authoritative current figure
$50
Supplemental Permit (original not expired/canceled/finaled)City of Somerton Electrical Fee Sheet; Resolution No. 2026-004
$7
Service Entrance Panel up to 200 ampsCity of Somerton Electrical Fee Sheet; Resolution No. 2026-004
$50
Service Entrance Panel up to 800 ampsCity of Somerton Electrical Fee Sheet; Resolution No. 2026-004
$75
Temporary Power ServiceCity of Somerton Electrical Fee Sheet ($45 per service); Resolution No. 2026-004 lists $50 for 'Each Temporary Power Service' plus a separate $45 line for temporary pole/pedestal service with decorative lighting/sales-lot use
$45-$50
Feeder Circuit / Branch CircuitCity of Somerton Electrical Fee Sheet; Resolution No. 2026-004
$5 per feeder circuit; $2 per branch circuit
Receptacle/Switch/Light FixturesCity of Somerton Electrical Fee Sheet, Category 02/03 Unit Fee Schedule
$1.50 each for first 20 fixtures, $1.00 each additional
Fixed Residential/Non-Residential Appliances (up to 1 HP/kW/kVA)City of Somerton Electrical Fee Sheet, Category 04/05
$5 per each
Power Apparatus (motors, generators, transformers, A/C, heat pumps, etc.)City of Somerton Electrical Fee Sheet, Category 06
$5 (up to 1 HP/kW) to $67 (over 100 HP/kW), tiered by rating
Services (600V or less, over 200-1,000A / over 600V or 1,000A)City of Somerton Electrical Fee Sheet, Category 08
$50 (≤200A); $75 (201-1,000A); $125 (over 600V or 1,000A)
Two or More Trades InvolvedCity of Somerton Electrical Fee Sheet, Category 01
$100

Review timeline

Plan reviewSomerton’s published plan-review target
8–11 business days

How long did your Electrical Permit permit actually take in Somerton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final / Clearance

    Devices installed, panel labeled, protections verified per 2014 NEC

See the full Somerton inspection guide — scheduling & re-inspection fees →

Tips

  • Per the City's A.R.S. § 9-835 Building Permit Processing Time Frames document, 'Residential Building – Elec./Plumb./Mech.' carries a 1-business-day Administrative Completeness Review, 5 business days for 1st review, and 5 business days for 2nd review (if needed), for an overall review time of 11 business days.
  • An Electrical (APS) Clearance to simply restore service with no other work is a flat $50 counter-issued fee — most straightforward clearances do not require the full plan-review cycle applicable to new service/panel work.
  • Remodel/alteration work involving 2+ trades (e.g., electrical plus plumbing) is billed an additional flat $100 fee beyond the itemized unit fees.

Frequently asked questions

Somerton requires an electrical permit for: Electrical permit required for service panels, feeder/branch circuits, fixtures, appliances, power apparatus, signs, and other hard-wired electrical work; Governed by the 2014 NEC as adopted by the City of Somerton, with local amendments; Electrical (APS) Clearance — for turning on service with no other work performed — is a distinct flat-fee, same general-permit-application track; Detailed unit fee schedule applies (base fee plus itemized per-fixture/per-circuit/per-service fees); Building Application Form or dedicated Permit Application (Electrical Clearance/Main Panel Upgrade) required depending on scope. If your project isn't listed, confirm with City of Somerton Community Development Department — Building Safety and Code Enforcement at 928-722-7399 before starting work.

The base fee for issuing an electrical permit is $50, per the City of Somerton Electrical Fee Sheet and Resolution No. 2026-004, with itemized additional fees for service entrances, panels, circuits, fixtures, appliances, and power apparatus depending on scope.

Per the City's A.R.S. § 9-835 Building Permit Processing Time Frames document, 'Residential Building – Elec./Plumb./Mech.' has an overall review time of 11 business days (1 day administrative completeness, 5 days first review, 5 days second review if needed).

You'll need: Building/Electrical Permit Application; Building Contractor's Information. See the required-documents checklist on this page for details on each.

Somerton requires 2 inspection(s) for an electrical permit, in order: Rough-In, Final / Clearance. Schedule each through City of Somerton Community Development Department — Building Safety and Code Enforcement (928-722-7399).

Apply through City of Somerton Community Development Department — Building Safety and Code Enforcement at 143 N. State Ave. (2nd Floor), P.O. Box 638, Somerton, AZ 85350. Phone: 928-722-7399, email: MariaYbarra@Somertonaz.gov. Office hours: City Hall hours as of August 12, 2024: closed every other Friday (contact 928-722-7400 for the current schedule); Building Inspector observes modified Summer Hours during peak heat months. To schedule a building inspection, call (928) 722-7399 before 3:00 PM Monday-Friday, or email Maria Ybarra (Permit Technician), at least one business day in advance. Plans/applications may be submitted via the On-line Permit Portal, by email, or in person at 143 N. State Ave.. Official information: https://www.somertonaz.gov/departments/community_development_services/building_safety_and_code_enforcement.php.

Somerton, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9, Chapter 7, Article 1, §§ 9-801 et seq.). The City of Somerton independently adopts and administers its own construction codes through its Community Development Department / Building Safety and Code Enforcement Office. Source: City of Somerton Ordinance No. 2019-002 (passed and ordained September 17, 2019, effective December 17, 2019), repealing and replacing Somerton City Code Article 7-1-1 (Building Reference Codes) and Article 7-1-7 (Permits).; 2018 International Building Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(A), effective 12/17/2019.; 2018 International Residential Code for one- and two-family dwellings, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(B).; 2018 International Existing Building Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(C).; 2018 International Property Maintenance Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(D).; 2018 International Swimming Pool and Spa Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(E).; National Fire Protection Association Code, 2018 Edition (NFPA-1, Fire Code), with Appendices, as published by the National Fire Protection Association, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(F).; National Electrical Code NFPA-70, 2014 Edition, with Appendices, as published by the National Fire Protection Association, adopted by reference with certain City of Somerton amendments (one edition behind the 2018 ICC suite). Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(G); confirmed current as of July 2026 on the City's Building Safety and Code Enforcement webpage, which lists 'Current adopted Building Codes, as of December 17, 2019.'; 2012 International Fuel Gas Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(H).; 2012 International Mechanical Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(I).; 2012 International Plumbing Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(J).; 2009 International Energy Conservation Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(K).; Each of these code editions was independently cross-checked against the City's own Building Safety and Code Enforcement webpage (accessed July 2026, server-rendered content, not just a stale directory listing) and against the individually published amendment PDFs for each code (2018 IBC, 2018 IRC, 2018 IEBC, 2014 NEC, 2012 IFGC, 2012 IMC, 2012 IPC, 2009 IECC), all hosted at the City's own cms2.revize.com document repository — none had been superseded by a newer adoption ordinance as of this review. Source: City of Somerton Building Safety and Code Enforcement webpage; individual code-amendment PDFs (e.g., cms2.revize.com/revize/somertonaz/2018%20IBC.pdf, 2014%20NEC.pdf, 2012%20IFGC.pdf, 2012%20IMC.pdf, 2012%20IPC.pdf, 2009%20IECC.pdf).; Permits are required in connection with the issuance of certificates and collection of fees under each adopted code; exemptions from permit requirements follow the exemptions in each adopted code as amended. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-7 (Permits).. Local amendments apply — see the Somerton overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Somerton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.