Required for plumbing and fuel-gas installation, alteration, or repair work in the City of Somerton, governed by the 2012 International Plumbing Code (IPC) as adopted and amended by the City (Ordinance No. 2019-002). Includes a standalone flat-fee Water Heater Replacement/Installation and a Gas Clearance.

Verified 2026-07-06 · Source

When you need this permit

  • Plumbing permit required for fixtures, traps, sewers, water heaters, water piping, drainage/vent piping, lawn sprinkler backflow protection, and interceptors
  • Governed by the 2012 IPC as adopted by the City of Somerton, with local amendments
  • Fuel Gas permit required separately for gas-piping systems, gas furnaces/heaters, gas boilers/compressors, and gas air-handling units, governed by the 2012 International Fuel Gas Code
  • Water Heater Replacement/Installation and Gas Clearance (South West or other) both use the City's general Permit Application form and are flat-fee, same-location replacements
  • Base fee for issuing a plumbing permit is $20 (or $25 per Resolution No. 2026-004); base fee for a fuel gas permit is $50

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Issuing Each Plumbing Permit (Base Fee)City of Somerton Plumbing and Gas Fee Sheet lists $20; Resolution No. 2026-004 (effective 7/1/2026) lists $25 as the current base fee — the Resolution is the more recent authoritative source
$20 (Plumbing Fee Sheet) / $25 (Resolution No. 2026-004)
Water Heater/Plumbing Replacement (Same Location)Resolution No. 2026-004, Building Safety Fees section (flat fee, same as the standalone application form's GL Code 501 fee structure)
$50
Gas ClearanceResolution No. 2026-004, Building Safety Fees section
$50
Issuing Each Fuel Gas Permit (Base Fee)City of Somerton Plumbing and Gas Fee Sheet; Resolution No. 2026-004
$50
Plumbing Fixture or Trap (incl. water/drainage piping and backflow protection)City of Somerton Plumbing and Gas Fee Sheet, Category 01
$7 per fixture
Building Sewer / Trailer Park SewerCity of Somerton Plumbing and Gas Fee Sheet
$15 per sewer
Private Sewage Disposal SystemCity of Somerton Plumbing and Gas Fee Sheet
$40 per system
Water Heater and/or VentCity of Somerton Plumbing and Gas Fee Sheet
$7 per unit
Gas Piping System (1-5 outlets / additional outlets)City of Somerton Plumbing and Gas Fee Sheet, Category 03
$5-$7 for 1-5 outlets; $1 per additional outlet
Supplemental Permit (original not expired/canceled/finaled)City of Somerton Plumbing and Gas Fee Sheet lists $7 for both plumbing and gas supplemental permits; Resolution No. 2026-004 updates the plumbing supplemental permit fee to $17
$7 (Plumbing Fee Sheet) / $17 (Plumbing, Resolution 2026-004) / $7 (Gas)

Review timeline

Plan reviewSomerton’s published plan-review target
8–11 business days

How long did your Plumbing Permit permit actually take in Somerton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

See the full Somerton inspection guide — scheduling & re-inspection fees →

Tips

  • Per the City's A.R.S. § 9-835 Building Permit Processing Time Frames document, 'Residential Building – Elec./Plumb./Mech.' carries an 11-business-day overall review time (1 day administrative completeness, 5 days 1st review, 5 days 2nd review if needed) — the same category covers electrical, plumbing, and mechanical permits together.
  • A straightforward Water Heater Replacement/Installation (same location) or Gas Clearance is a flat $50 counter-issued fee under GL Code 501 on the general Permit Application, not the itemized unit fee schedule.
  • Fuel gas work is technically permitted separately from plumbing (separate $50 base fee) even though both are covered on the same combined 'Plumbing and Gas Fee Sheet.'

Frequently asked questions

Yes — Water Heater Replacement/Installation (same location) is a flat $50 fee using the City's general Permit Application, per Resolution No. 2026-004.

In Somerton, the published Issuing Each Plumbing Permit (Base Fee) is: $20 (Plumbing Fee Sheet) / $25 (Resolution No. 2026-004). Additional published fees: Water Heater/Plumbing Replacement (Same Location) — $50; Gas Clearance — $50; Issuing Each Fuel Gas Permit (Base Fee) — $50; Plumbing Fixture or Trap (incl. water/drainage piping and backflow protection) — $7 per fixture; Building Sewer / Trailer Park Sewer — $15 per sewer; Private Sewage Disposal System — $40 per system; Water Heater and/or Vent — $7 per unit; Gas Piping System (1-5 outlets / additional outlets) — $5-$7 for 1-5 outlets; $1 per additional outlet; Supplemental Permit (original not expired/canceled/finaled) — $7 (Plumbing Fee Sheet) / $17 (Plumbing, Resolution 2026-004) / $7 (Gas). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Per the City's A.R.S. § 9-835 Building Permit Processing Time Frames document, plumbing work is reviewed under 'Residential Building – Elec./Plumb./Mech.,' which carries an overall review time of 11 business days (1 day administrative completeness, 5 days first review, 5 days second review if needed).

You'll need: Building/Plumbing/Gas Permit Application; Building Contractor's Information. See the required-documents checklist on this page for details on each.

Somerton requires 3 inspection(s) for a plumbing permit, in order: Underground/Slab, Rough-In, Final. Schedule each through City of Somerton Community Development Department — Building Safety and Code Enforcement (928-722-7399).

Apply through City of Somerton Community Development Department — Building Safety and Code Enforcement at 143 N. State Ave. (2nd Floor), P.O. Box 638, Somerton, AZ 85350. Phone: 928-722-7399, email: MariaYbarra@Somertonaz.gov. Office hours: City Hall hours as of August 12, 2024: closed every other Friday (contact 928-722-7400 for the current schedule); Building Inspector observes modified Summer Hours during peak heat months. To schedule a building inspection, call (928) 722-7399 before 3:00 PM Monday-Friday, or email Maria Ybarra (Permit Technician), at least one business day in advance. Plans/applications may be submitted via the On-line Permit Portal, by email, or in person at 143 N. State Ave.. Official information: https://www.somertonaz.gov/departments/community_development_services/building_safety_and_code_enforcement.php.

Somerton, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9, Chapter 7, Article 1, §§ 9-801 et seq.). The City of Somerton independently adopts and administers its own construction codes through its Community Development Department / Building Safety and Code Enforcement Office. Source: City of Somerton Ordinance No. 2019-002 (passed and ordained September 17, 2019, effective December 17, 2019), repealing and replacing Somerton City Code Article 7-1-1 (Building Reference Codes) and Article 7-1-7 (Permits).; 2018 International Building Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(A), effective 12/17/2019.; 2018 International Residential Code for one- and two-family dwellings, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(B).; 2018 International Existing Building Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(C).; 2018 International Property Maintenance Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(D).; 2018 International Swimming Pool and Spa Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(E).; National Fire Protection Association Code, 2018 Edition (NFPA-1, Fire Code), with Appendices, as published by the National Fire Protection Association, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(F).; National Electrical Code NFPA-70, 2014 Edition, with Appendices, as published by the National Fire Protection Association, adopted by reference with certain City of Somerton amendments (one edition behind the 2018 ICC suite). Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(G); confirmed current as of July 2026 on the City's Building Safety and Code Enforcement webpage, which lists 'Current adopted Building Codes, as of December 17, 2019.'; 2012 International Fuel Gas Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(H).; 2012 International Mechanical Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(I).; 2012 International Plumbing Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(J).; 2009 International Energy Conservation Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(K).; Each of these code editions was independently cross-checked against the City's own Building Safety and Code Enforcement webpage (accessed July 2026, server-rendered content, not just a stale directory listing) and against the individually published amendment PDFs for each code (2018 IBC, 2018 IRC, 2018 IEBC, 2014 NEC, 2012 IFGC, 2012 IMC, 2012 IPC, 2009 IECC), all hosted at the City's own cms2.revize.com document repository — none had been superseded by a newer adoption ordinance as of this review. Source: City of Somerton Building Safety and Code Enforcement webpage; individual code-amendment PDFs (e.g., cms2.revize.com/revize/somertonaz/2018%20IBC.pdf, 2014%20NEC.pdf, 2012%20IFGC.pdf, 2012%20IMC.pdf, 2012%20IPC.pdf, 2009%20IECC.pdf).; Permits are required in connection with the issuance of certificates and collection of fees under each adopted code; exemptions from permit requirements follow the exemptions in each adopted code as amended. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-7 (Permits).. Local amendments apply — see the Somerton overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Somerton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.