Skip to main content
PermitBase

Mechanical / HVAC Permit in Somerton, Arizona

Required for heating, ventilation, and air conditioning installations in the City of Somerton, governed by the 2012 International Mechanical Code (IMC) as adopted and amended by the City (Ordinance No. 2019-002). Includes a standalone flat-fee A/C Unit Replacement Permit.

Verified 2026-07-06 · Source

When you need this permit

  • Mechanical permit required for installation, replacement, or relocation of furnaces, boilers, compressors, air handlers, evaporative coolers, and ventilation/exhaust equipment
  • Governed by the 2012 IMC as adopted by the City of Somerton, with local amendments
  • A/C Unit Replacement (ground or roof-mounted) uses the City's general Permit Application form and requires unit size/specifications and a site plan indication
  • Base fee for issuing a mechanical permit is $50, with itemized additional fees by equipment category and capacity

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

A/C Replacement PermitResolution No. 2026-004, Building Safety Fees section; matches GL Account 10-32-21, Code 501 shown on the A/C Replacement Application form
$50
Issuing Each Mechanical Permit (Base Fee)City of Somerton Mechanical Fee Sheet; Resolution No. 2026-004
$50
Forced-Air/Gravity-Type Furnace (up to 100,000 BTU/H)City of Somerton Mechanical Fee Sheet, Category 02
$15 per installation
Forced-Air/Gravity-Type Furnace (over 100,000 BTU/H)City of Somerton Mechanical Fee Sheet, Category 02
$18 per installation
Boiler/Compressor or Absorption System (tiered by horsepower/BTU)City of Somerton Mechanical Fee Sheet, Category 05
$15 (up to 3 HP/100,000 BTU/H) to $93 (over 50 HP/1,750,000 BTU/H)
Air-Handling Unit (up to 10,000 cfm / over 10,000 cfm)City of Somerton Mechanical Fee Sheet, Category 06
$11 / $18 per unit
Evaporative Cooler (other than portable)City of Somerton Mechanical Fee Sheet, Category 07
$11 per cooler
Supplemental Permit (original not expired/canceled/finaled)City of Somerton Mechanical Fee Sheet, Category 01
$7
Two or More Trades InvolvedCity of Somerton Mechanical Fee Sheet, Category 01
$100

Review timeline

Plan reviewSomerton’s published plan-review target
8–11 business days

How long did your Mechanical / HVAC Permit permit actually take in Somerton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified

See the full Somerton inspection guide — scheduling & re-inspection fees →

Tips

  • Per the City's A.R.S. § 9-835 Building Permit Processing Time Frames document, 'Residential Building – Elec./Plumb./Mech.' carries an 11-business-day overall review time (1 day administrative completeness, 5 days 1st review, 5 days 2nd review if needed).
  • A/C Unit Replacement is a flat $50 counter-issued fee (GL Code 501) using the general Permit Application — equipment cut sheets/specifications are required.
  • Remodel/alteration work involving 2+ trades is billed an additional flat $100 fee on top of the itemized mechanical unit fees.

Frequently asked questions

Somerton requires a mechanical / hvac permit for: Mechanical permit required for installation, replacement, or relocation of furnaces, boilers, compressors, air handlers, evaporative coolers, and ventilation/exhaust equipment; Governed by the 2012 IMC as adopted by the City of Somerton, with local amendments; A/C Unit Replacement (ground or roof-mounted) uses the City's general Permit Application form and requires unit size/specifications and a site plan indication; Base fee for issuing a mechanical permit is $50, with itemized additional fees by equipment category and capacity. If your project isn't listed, confirm with City of Somerton Community Development Department — Building Safety and Code Enforcement at 928-722-7399 before starting work.

$50 flat fee, per Resolution No. 2026-004 and the City of Somerton A/C Replacement Application (GL Account 10-32-21, Code 501). Equipment specifications must be submitted with the application.

Per the City's A.R.S. § 9-835 Building Permit Processing Time Frames document, mechanical work is reviewed under 'Residential Building – Elec./Plumb./Mech.,' which carries an overall review time of 11 business days (1 day administrative completeness, 5 days first review, 5 days second review if needed).

You'll need: A/C Replacement / General Permit Application; Building Contractor's Information; Equipment Specifications. See the required-documents checklist on this page for details on each.

Somerton requires 2 inspection(s) for a mechanical / hvac permit, in order: Rough-In, Final. Schedule each through City of Somerton Community Development Department — Building Safety and Code Enforcement (928-722-7399).

Apply through City of Somerton Community Development Department — Building Safety and Code Enforcement at 143 N. State Ave. (2nd Floor), P.O. Box 638, Somerton, AZ 85350. Phone: 928-722-7399, email: MariaYbarra@Somertonaz.gov. Office hours: City Hall hours as of August 12, 2024: closed every other Friday (contact 928-722-7400 for the current schedule); Building Inspector observes modified Summer Hours during peak heat months. To schedule a building inspection, call (928) 722-7399 before 3:00 PM Monday-Friday, or email Maria Ybarra (Permit Technician), at least one business day in advance. Plans/applications may be submitted via the On-line Permit Portal, by email, or in person at 143 N. State Ave.. Official information: https://www.somertonaz.gov/departments/community_development_services/building_safety_and_code_enforcement.php.

Somerton, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9, Chapter 7, Article 1, §§ 9-801 et seq.). The City of Somerton independently adopts and administers its own construction codes through its Community Development Department / Building Safety and Code Enforcement Office. Source: City of Somerton Ordinance No. 2019-002 (passed and ordained September 17, 2019, effective December 17, 2019), repealing and replacing Somerton City Code Article 7-1-1 (Building Reference Codes) and Article 7-1-7 (Permits).; 2018 International Building Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(A), effective 12/17/2019.; 2018 International Residential Code for one- and two-family dwellings, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(B).; 2018 International Existing Building Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(C).; 2018 International Property Maintenance Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(D).; 2018 International Swimming Pool and Spa Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(E).; National Fire Protection Association Code, 2018 Edition (NFPA-1, Fire Code), with Appendices, as published by the National Fire Protection Association, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(F).; National Electrical Code NFPA-70, 2014 Edition, with Appendices, as published by the National Fire Protection Association, adopted by reference with certain City of Somerton amendments (one edition behind the 2018 ICC suite). Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(G); confirmed current as of July 2026 on the City's Building Safety and Code Enforcement webpage, which lists 'Current adopted Building Codes, as of December 17, 2019.'; 2012 International Fuel Gas Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(H).; 2012 International Mechanical Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(I).; 2012 International Plumbing Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(J).; 2009 International Energy Conservation Code, with Appendices, as published by the International Code Council, adopted by reference with certain City of Somerton amendments. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-1(K).; Each of these code editions was independently cross-checked against the City's own Building Safety and Code Enforcement webpage (accessed July 2026, server-rendered content, not just a stale directory listing) and against the individually published amendment PDFs for each code (2018 IBC, 2018 IRC, 2018 IEBC, 2014 NEC, 2012 IFGC, 2012 IMC, 2012 IPC, 2009 IECC), all hosted at the City's own cms2.revize.com document repository — none had been superseded by a newer adoption ordinance as of this review. Source: City of Somerton Building Safety and Code Enforcement webpage; individual code-amendment PDFs (e.g., cms2.revize.com/revize/somertonaz/2018%20IBC.pdf, 2014%20NEC.pdf, 2012%20IFGC.pdf, 2012%20IMC.pdf, 2012%20IPC.pdf, 2009%20IECC.pdf).; Permits are required in connection with the issuance of certificates and collection of fees under each adopted code; exemptions from permit requirements follow the exemptions in each adopted code as amended. Source: City of Somerton Ordinance No. 2019-002, Article 7-1-7 (Permits).. Local amendments apply — see the Somerton overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Somerton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.