Building Permit in Clovis, California
Clovis publishes eight local design values, a clear permit-exemption list, and an inspection process that ends in a telephone call to the inspector personally. Paper still has a place here: commercial projects take four plan sets, wet signed and stamped.
Verified 2026-09-19 · Source
When you need this permit
- WHEN A PERMIT IS NEEDED: "A permit is required to build, construct, remodel, repair, demolish, remove or move any house, building or structure."
- THE EXEMPTIONS ARE ENUMERATED: a one-story detached accessory building used as a tool or storage shed or playhouse "provided the floor area does not exceed 120 square feet"; "Fences not over 7 feet high", wood or block, with a caution to check with Planning on a corner lot; retaining walls "not over 4 feet in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge or impounding Class I, II or III-A-liquids"; "Platforms, walks and driveways not more than 30 inches above grade and not over any basement or story below"; "Painting, papering and similar finish work"; and prefabricated pools entirely above grade whose capacity "does not exceed 5,000 gallons".
- COMMERCIAL DRAWINGS MUST BE WET SIGNED: new commercial permit requirements "include submitting drawings, plans and calculations that must be wet signed and stamped by a licensed California Architect or Engineer."
- PLAN SET COUNTS DIFFER BY OCCUPANCY: "Residential: One set for initial submittal. Commercial: Four sets for commercial projects."
- SOLAR HAS THREE ROUTES AND ONE OF THEM IS CLOSED TO OWNERS: in person, online through the CSS portal, or "Submitting a SolarApp application (SB-379) via CSS portal" - and "NOTE: The 3rd method is for contractors only (Owner builders are required to use method 1 or 2)." Owner-builder
Required documents
Check off what you have — your progress is saved on this device.
Fee schedule
The city publishes a Letter to Industry Proposed Fee Increase and recurring Notice to Industry Valuation Update letters, the latest dated 2025-08-18 in its filename, which indicates fees are resolved… Show full citationHide
The city publishes a Letter to Industry Proposed Fee Increase and recurring Notice to Industry Valuation Update letters, the latest dated 2025-08-18 in its filename, which indicates fees are resolved through a periodically updated valuation table. Neither letter was opened, so no schedule, amount or multiplier is asserted.Review timeline
Inspection process
- 1
The portal route: look up your inspector, then telephone them
The Building Division page gives five steps: "To request a time for Inspections, please go to the CSS portal, and complete the following steps. Go to the top of the page and click on Today's Inspections. Look for your permit number. Look at who your inspector for the day is. Their phone number will be next to their name. Call the inspector to see what times are available." The city adds its own caveat: "Inspectors may not be able to accommodate your time request due to work load."
- 2
The FAQ route: a central line, 24 hours ahead
The FAQs page answers the same question differently: "After you receive a building permit, inspection requests can be called for at (559) 324-2337. Inspection requests must be made 24 hours in advance so that field personnel can be scheduled." Both routes are published by the city on its own site; this record reports both rather than choosing between them.
- 3
Today's Building Inspections is public
The daily inspection list is published and is the first step of the city's own scheduling instructions, since it is where the assigned inspector's name and phone number appear. No data from it is reproduced in this record.
See the full Clovis inspection guide — scheduling & re-inspection fees →
Tips
- COMMERCIAL TAKES FOUR WET-SIGNED PLAN SETS; residential takes one for initial submittal.
- THE AUTOMATED SOLAR ROUTE IS CLOSED TO OWNER-BUILDERS - contractors only. Owner-builder
- THE CITY PUBLISHES TWO DIFFERENT INSPECTION-REQUEST ROUTES; confirm which applies before relying on either.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-09-19.
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clovis building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Clovis's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Clovis yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Clovis lands. Privacy.
Building Permit in other cities
Compare building permit fees across California →
Look up this fee in a different city →
Now live
Build your Clovis project checklist
Describe your project once and get every permit, document, and fee it triggers in Clovis — in one checklist. Free, for any city and any number of projects.
Get started →