Accessory Dwelling Unit (ADU) Permit — Long Beach, California · Requirements sheet
Verified 2026-09-11 · Source: https://www.longbeach.gov/lbcd/building/permit-center/building-permits/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Dwelling Unit (ADU) Permit in Long Beach, California
Long Beach routes ADUs through its over-the-counter plan review: OTC Plan Review Permits 'can be obtained for minor construction projects requiring in-person plan reviews such as one one-story residential additions, accessory dwelling units (ADUs), and relocation of 50 or less fire sprinkler heads.'
Verified 2026-09-11 · Source
When you need this permit
- The review is in person at the counter - OTC permits 'can be obtained in person by visiting our Permit Center located at City Hall (411 W. Ocean Blvd., 2nd Fl.)'
- Appointment slots are published: 'Appointments are currently available on Monday - Friday, from 8 a.m. to 3:30 p.m., and on Wednesday from 9 a.m. to 3:30 p.m., excluding holidays.'
- ONE PROJECT PER VISIT: 'for each appointment scheduled we are limiting the number of projects that will be processed and reviewed to one (1) per visit.'
- The qualifying list is published separately in 'Information Bulletin IB-002 Over-the-Counter (OTC) Plan Review Service for Minor Projects .'
- Permits issue at the Development Permit Center to 'A licensed contractor who has a valid California State Contractor's License and an active Long Beach Business License .' or to 'A Homeowner of a one- or two-family dwelling and related accessory building or structure in accordance with Information Bulletin BU-029 / Eligibility to Obtain a Construction Permit .' Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Inspection
Through the Building and Safety Bureau after permit issuance.
Tips
- AN ADU IS AN OTC PROJECT HERE, WHICH MEANS IN PERSON, NOT ONLINE. The review happens at the counter during the appointment.
- ONE PROJECT PER APPOINTMENT. If you have an ADU and something else, that is two visits.
- PERMITS DIE ON A 90-DAY CLOCK, NOT THE 180 DAYS SOME CALIFORNIA CITIES USE: 'Permits become null and void if work authorized is not commenced within 90 days of the issuance or if such work is suspended or abandoned at any time after the work is commenced for a period of 90 days .'
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-09-11.
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Long Beach building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Long Beach's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Long Beach yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Long Beach lands. Privacy.
Other permits in Long Beach
Accessory Dwelling Unit (ADU) Permit in other cities
Compare accessory dwelling unit (adu) permit fees across California →
Look up this fee in a different city →
Now live
Build your Long Beach project checklist
Describe your project once and get every permit, document, and fee it triggers in Long Beach — in one checklist. Free, for any city and any number of projects.
Get started →