Accessory Structure Permit (incl. Accessory Dwelling / Structures) — Ault, Colorado · Requirements sheet
Verified 2026-07-23 · Source: https://www.aultcolorado.gov/api/blob/viewBlob?rf=t&i=jWOUgRxXBPBRfwPLVzJPFXAKFMoS%2FJ6UTGznMYlopOLvtXYVc36cO5EVpGUfB2RT
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Structure Permit (incl. Accessory Dwelling / Structures) in Ault, Colorado
Covers accessory structures in Ault (garages, sheds, accessory buildings, and similar), reviewed under 2024 IRC Accessory Structures provisions per SAFEbuilt's Building Guide for Homeowners. Ault's own Zoning Code (Title 15, Chapter 03) separately recognizes 'Accessory dwelling (incl. "carriage units")' as a distinct accessory-use category, permitted by right in the Town Residential, Rural Residential, and Agricultural districts (not listed as an allowed use in Commercial/Industrial), counted at .33 units toward a district's maximum density; the building-permit submittal process itself is not ADU-specific, so this entry still covers the closest genuinely-applicable building-permit pathway.
Verified 2026-07-23 · Source
When you need this permit
- Building permit application and applicable Residential Application Check List submittal items scaled to the accessory structure's size/use
- Structural plans required if the structure includes site-built framing beyond a prefabricated/pre-engineered shed
- Electrical plans required if the structure will be wired
- Zoning eligibility for a habitable accessory dwelling unit ('carriage unit'): by-right use in the Town Residential, Rural Residential, and Agricultural zoning districts per Ault's Zoning Code (Title 15, Chapter 03); not listed as an allowed use in the Commercial or Industrial districts
- For the Town Residential District specifically, accessory buildings require a minimum 5-foot side and rear setback (smaller than the setbacks that apply to principal structures)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation (if applicable)
- 2
Final Inspection
See the full Ault inspection guide — scheduling & re-inspection fees →
Tips
- 2026-07-23 re-chase update: Ault's own Zoning Code text was recovered via the Wayback Machine (the Town's prior municipal-code portal, myaultgov.org, is now defunct/unresolvable by DNS, and the Town's current site states the Municipal Code is 'available upon request' only, not published online) — archived captures dated 2022-12-05 and 2023-09-28 confirm the ordinance treats an 'Accessory dwelling (incl. "carriage units")' as a Principal Use by Right in the Town Residential, Rural Residential, and Agricultural districts (counted at .33 units toward max density), and NOT as an allowed use in the Commercial or Industrial districts.
- Because no live, currently-hosted copy of the Municipal Code is publicly accessible today, this zoning detail reflects the Town's own last-archived, actually-published ordinance text rather than a same-day live confirmation — verify with Ault Planning & Zoning (970-834-2844) that no subsequent amendment has changed ADU/carriage-unit district eligibility or the density-counting formula before relying on it for a specific project.
- The building-permit submittal itself (structural/electrical plans, Residential Application Check List items) is unaffected by this zoning detail — zoning use-eligibility and the building-permit process are separate steps, both required for a habitable ADU.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ault building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Ault
Accessory Structure Permit (incl. Accessory Dwelling / Structures) in other cities
Compare accessory structure permit (incl. accessory dwelling / structures) fees across Colorado →
Look up this fee in a different city →
Now live
Build your Ault project checklist
Describe your project once and get every permit, document, and fee it triggers in Ault — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →