Accessory Dwelling Unit (ADU) Permit — Brighton, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://brightonco.gov/DocumentCenter/View/37580
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Dwelling Unit (ADU) Permit in Brighton, Colorado
Required for construction of an Accessory Dwelling Unit (ADU) — a permanently constructed dwelling unit, detached or attached to the primary residence, with independent living/sleeping/eating/cooking/sanitation facilities and its own entrance. Governed by the City's January 2026 ADU Homeowner Guide and Land Use Development Code Articles 4 and 5. Notably, the City Council has waived impact and permit fees for ADUs that do not require increased utility service capacity.
Verified 2026-07-06 · Source
When you need this permit
- One ADU allowed per lot where the primary residence is a compliant detached house or duplex
- ADU generally may not exceed the living area of the primary residence or 1,200 sq ft, whichever is less
- Non-permanent structures, mobile homes, motorhomes, and RVs are NOT allowed as ADUs; HUD-certified manufactured homes and state-certified factory-built homes ARE allowed
- Must comply with all current applicable building codes (2021 IRC/IBC as adopted)
- Existing utility services must adequately serve the ADU, or must be upsized at owner's cost and associated fees
- Setback, height, and other zoning criteria per Land Use Development Code Articles 4 and 5 (confirm specifics with the department for the applicable zone district)
- Submittal requires: plot plan; engineer-stamped soils report and foundation plan if a new foundation is needed; architectural drawings; stamped structural drawings if the ADU is detached, an addition, or alters the existing structure; IECC energy compliance documents if applicable; and Manual D & J calculations if applicable
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation (if new foundation required)
Before concrete pour
- 2
Framing
Structural framing complete before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment, especially where utility services are being extended or upsized
- 4
Final Inspection
All work complete per approved plans and applicable codes
See the full Brighton inspection guide — scheduling & re-inspection fees →
Tips
- Brighton City Council has waived impact and permit fees for ADUs, but ONLY if the project does not require an increase in utility service capacity — use tax and school/fire district fees remain due regardless. Confirm your utility connection sizing early, since triggering an upsize brings back standard fees for that portion of the work.
- If converting an existing residence into an ADU while building a new principal residence on the same lot, a SEPARATE permit application is required for the new principal residence in addition to the ADU conversion application.
- An ADU generally cannot exceed 1,200 sq ft or the primary residence's living area, whichever is less — call or email Community Development (303-655-2072) to confirm sizing, setbacks, and zone-district-specific criteria before design.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Brighton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Brighton
Accessory Dwelling Unit (ADU) Permit in other cities
Compare accessory dwelling unit (adu) permit fees across Colorado →
Look up this fee in a different city →