Required for installation, alteration, or repair of electrical systems in Brighton. Governed by the 2023 NEC as adopted (Municipal Code Article 15-12). The City of Brighton is its own certified electrical permitting and inspection authority — it does NOT defer electrical permits to the Colorado State Electrical Board. Electrical contractors register with the City under Article 15-12 ('Electrical Code registrants') rather than the general Class A-E contractor license ladder, and must separately hold applicable Colorado state electrical licensure to perform the work.

Verified 2026-07-06 · Source

When you need this permit

  • Governed by the 2023 NEC as adopted by the City of Brighton (Municipal Code Article 15-12); Article 15-12-40 substitutes the Chief Building Official of the City of Brighton for 'authority having jurisdiction' throughout the Code
  • Electrical contractors must register with the City pursuant to Article 15-12 ('Electrical Code registrants') — this is explicitly carved out from, and distinct from, the general Class A-E/P/M contractor license scheme under Article 15-16 Contractor
  • Article 15-12-30 replaces all NEC references to permit, inspection, grading, and certificate-of-occupancy fees with 'the current City of Brighton Fee Resolution'
  • Billed under the City's single unified valuation-based Permit Fee schedule (not a separate state-anchored fee table)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit Fee (same unified valuation-based schedule as Building/Plumbing/Mechanical)Brighton does not publish a separate state-anchored electrical fee table (unlike some peer Colorado jurisdictions) — electrical work is billed under the same unified Permit Fee schedule as Building/Plumbing/Mechanical
$23.50 minimum, scaling per the valuation tiers in the 2026 Community Development Fee Schedule
Residential Housing Electrical Inspection2026 Community Development Fee Schedule, Miscellaneous Inspections and Fees; the 2025-87 amendment adds an exception for accessory structures
$126.00 per unit
Plan Review Fee
65% of the permit fee (if plan review is required)
Re-inspection FeePer established policy authorized by the Building Official
$100.00
Construction Use Tax
3.75% of 50% of total project valuation, applied only where a taxable materials valuation applies

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Brighton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment

  2. 2

    Final Inspection

    Devices installed, panel labeled, system energized and verified

See the full Brighton inspection guide — scheduling & re-inspection fees →

Tips

  • Brighton runs its OWN electrical permitting and inspection program (Municipal Code Article 15-12) rather than deferring to the Colorado State Electrical Board (DORA) — but electricians performing the work must still separately hold applicable Colorado state electrical licensure; the City's Article 15-12 'registration' is a local compliance layer, not a substitute for state licensure.
  • Electrical contractors are explicitly EXCEPTED from the general Class A-E contractor license under Article 15-16-20(b)(6) — don't apply for a Class A-E City contractor license for electrical work; register instead under Article 15-12. Contractor

Frequently asked questions

Brighton requires an electrical permit for: Governed by the 2023 NEC as adopted by the City of Brighton (Municipal Code Article 15-12); Article 15-12-40 substitutes the Chief Building Official of the City of Brighton for 'authority having jurisdiction' throughout the Code; Electrical contractors must register with the City pursuant to Article 15-12 ('Electrical Code registrants') — this is explicitly carved out from, and distinct from, the general Class A-E/P/M contractor license scheme under Article 15-16; Article 15-12-30 replaces all NEC references to permit, inspection, grading, and certificate-of-occupancy fees with 'the current City of Brighton Fee Resolution'; Billed under the City's single unified valuation-based Permit Fee schedule (not a separate state-anchored fee table). If your project isn't listed, confirm with City of Brighton Community Development Department, Permitting Division at 303-655-2017 before starting work.

In Brighton, the published Electrical Permit Fee (same unified valuation-based schedule as Building/Plumbing/Mechanical) is: $23.50 minimum, scaling per the valuation tiers in the 2026 Community Development Fee Schedule. Additional published fees: Residential Housing Electrical Inspection — $126.00 per unit; Plan Review Fee — 65% of the permit fee (if plan review is required); Re-inspection Fee — $100.00; Construction Use Tax — 3.75% of 50% of total project valuation, applied only where a taxable materials valuation applies. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Brighton does not publish a plan-review timeline for this permit. Contact City of Brighton Community Development Department, Permitting Division at 303-655-2017 for current turnaround.

You'll need: Electrical Permit Application; City of Brighton Electrical Code Registration. See the required-documents checklist on this page for details on each.

Brighton requires 2 inspection(s) for an electrical permit, in order: Rough Electrical, Final Inspection. Schedule each through City of Brighton Community Development Department, Permitting Division (303-655-2017).

Apply through City of Brighton Community Development Department, Permitting Division at 500 S 4th Avenue, Brighton, CO 80601. Phone: 303-655-2017, email: 1stop@brightonco.gov. Office hours: City of Brighton main line 303-655-2000; Building Permit Counter direct line 303-655-2017; Homeowner Inspection Line 303-655-2151; Community Development general line 303-655-2072. City Hall closes at noon on Fridays, and all Community Development functions (planning and zoning, permitting and inspections) end at noon on Fridays as well.. Official information: https://www.brightonco.gov/222/Permitting.

Brighton, Colorado has adopted: 2021 International Building Code (IBC) — City of Brighton 'Building Code Editions, Design Loads, Etc.' sheet, Codes & Information page; 2021 International Residential Code (IRC); 2021 International Mechanical Code (IMC); 2021 International Plumbing Code (IPC); 2021 International Fuel Gas Code (IFGC); 2021 International Fire Code (IFC); 2021 International Energy Conservation Code (IECC); 2021 International Property Maintenance Code (IPMC); 2021 International Existing Building Code (IEBC); 2021 International Swimming Pool and Spa Code (ISPSC); 2023 National Electrical Code (NEC); ICC A117-17 (Accessible and Usable Buildings and Facilities); Effective date of the 2021 I-Code revisions: January 1, 2023. Effective date of the 2023 NEC adoption: July 1, 2023 — both per the City's own published 'Building Code Editions, Design Loads, Etc.' sheet (Codes & Information page), which is treated as the current, governing adopted-code list for this file.; Note on code-page currency: Brighton's Municode-hosted Chapter 15, Article 15-12 ('National Electrical Code') still codifies the '2005 National Electrical Code' verbatim in its Municode text — this is a known lag between the codified ordinance text on Municode and the live, actively-maintained Codes & Information page, which explicitly states the 2023 NEC is adopted effective 7/1/2023. The live department page is treated as authoritative for current code edition, consistent with the same lag pattern documented for other Colorado home-rule jurisdictions in this corpus (e.g. Vail's Minimum Submittal Requirements PDFs).. Local amendments apply — see the Brighton overview page for the full list.

Brighton runs its own electrical permitting and inspection program under Municipal Code Article 15-12 (adopting the NEC with the Chief Building Official as the local authority having jurisdiction) — it does not defer electrical permit issuance or inspection to the Colorado State Electrical Board. Electricians must still hold applicable Colorado state electrical licensure to perform the work; the City layers its own local registration (not the general Class A-E contractor license) on top of that state licensure.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Brighton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.