Electrical Permit — Ault, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.aultcolorado.gov/api/blob/viewBlob?rf=t&i=%2BCQ%2Fs7AkfERlUud5SVjcPVs4QxyHRb%2BmFM2x%2BT8XOitnQ3AGCI5w83RcnPz%2BJ8ot
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electrical Permit in Ault, Colorado
Required for electrical installation, alteration, or repair work in Ault. Fees are set under the State of Colorado Electrical Board fee schedule plus a 15% local surcharge (the maximum allowed under CRS 12-23-117(3)); permit issuance and inspection are administered locally by SAFEbuilt Colorado under contract to the Town, applying the 2023 NEC.
Verified 2026-07-06 · Source
When you need this permit
- Governed by the 2023 NEC as referenced in the Town's SAFEbuilt Residential Application Check List
- Electrical contractors must hold a current Colorado State Electrical Board (DORA) license; the Town's fee schedule explicitly ties electrical fees to the 'most current version of the State of Colorado Electrical Board fee schedule' plus 15%
- Electrical plans (panel locations, receptacles, lighting plan or one-line diagram and load calculations for commercial work) required as part of the relevant submittal packet
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Wiring and panel installed before concealment
- 2
Final Inspection
Devices installed, panel labeled, system verified
See the full Ault inspection guide — scheduling & re-inspection fees →
Tips
- Electrical fees in Ault are structurally different from building/plumbing/mechanical fees: they pass through the Colorado State Electrical Board's own fee schedule plus the maximum 15% local surcharge Colorado statute allows, rather than using the Town's local 1997 UBC valuation table.
- Because the base rate resets whenever the State Electrical Board updates its own schedule, confirm the current DORA Electrical Board fee table before budgeting, rather than relying on a prior year's figure.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ault building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Ault
Electrical Permit in other cities
Compare electrical permit fees across Colorado →
Look up this fee in a different city →