EV Charger / EVSE Permit in Ault, Colorado
Required for installation of a residential electric vehicle charging circuit in Ault. Filed as an electrical permit and inspected locally by SAFEbuilt Colorado under contract to the Town, applying the 2023 NEC. No EV-charger-specific fee line item is published in the Town's Exhibit B Fee Schedule — an EV charger circuit is billed under the same mechanism as all other electrical work: the current State of Colorado Electrical Board fee schedule plus the maximum 15% local surcharge allowed under CRS 12-23-117(3).
Verified 2026-07-20 · Source
When you need this permit
- Governed by the 2023 NEC as referenced in the Town's SAFEbuilt Residential Application Check List
- Electrical contractors must hold a current Colorado State Electrical Board (DORA) license
- Electrical plans (single-line diagram/load calculations) required as part of the submittal packet
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Wiring and circuit installed before concealment
- 2
Final Inspection
Charger installed, circuit verified, unit energized
See the full Ault inspection guide — scheduling & re-inspection fees →
Tips
- Ault has no distinct EV charger/EVSE fee line — like all electrical work in the Town, it passes through the Colorado State Electrical Board's own fee schedule plus the maximum 15% local surcharge Colorado statute allows.
- Because the base rate resets whenever the State Electrical Board updates its own schedule, confirm the current DORA Electrical Board fee table before budgeting.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ault building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Ault
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Ault project checklist
Describe your project once and get every permit, document, and fee it triggers in Ault — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.