EV Charger / EVSE Permit — Arvada, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://arvadaco.gov/DocumentCenter/View/6885/2026-Building-Permit-Guide-and-Schedule
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Arvada, Colorado
Required for installation of a residential electric vehicle charging circuit in Arvada. The City of Arvada Building Division issues and inspects the permit as an electrical permit, and prices it as its own distinct flat-rate line item — 'Residential EV Charger' — under Table 18-5 (Residential Flat Rate Permit Fees) of the City's Building Permit Fee Guide and Administrative Fee Schedule (effective January 1, 2026), separate from the general valuation-based electrical permit fee (Table 18-1) and from the flat $60.00 Residential Electrical Service Change fee.
Verified 2026-07-20 · Source
When you need this permit
- A hardwired EV charger or new 240V circuit/outlet (e.g. NEMA 14-50) for EV charging requires a City of Arvada electrical permit and safety inspection
- Homeowner-occupants may pull the permit themselves for their own residence; otherwise a State of Colorado-licensed electrical contractor must be listed as contractor of record Owner-builder
- Billed as the flat-rate 'Residential EV Charger' line item (Table 18-5) — minor electric wiring is included, but a panel/service change or upgrade is not included in this permit fee and is billed separately
- A single line diagram is required with the application for homeowner-completed projects
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Wiring and conduit installed before walls closed
- 2
Final Electrical
Charger installed, circuit and disconnect verified, unit energized
See the full Arvada inspection guide — scheduling & re-inspection fees →
Tips
- Arvada prices a residential EV charger as its own $55.00 flat-rate electrical permit line item (Table 18-5) — distinct from the general valuation-based electrical permit fee and from the $60.00 Residential Electrical Service Change fee.
- If the EV charger install also requires a panel or service upgrade, that is a separate $60.00 flat-rate Residential Electrical Service Change line item, typically filed alongside the EV charger permit.
- Panel ratings over 200 amps require engineered, stamped plans and go through a longer technical review than the standard 0-3 business day turnaround.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Arvada building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Arvada
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Arvada project checklist
Describe your project once and get every permit, document, and fee it triggers in Arvada — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →