Demolition Permit in Arvada, Colorado

Required for full or partial demolition of residential and commercial structures in Arvada. Processed as a flat-rate permit distinguishing minor interior demolition from major building demolition; asbestos/hazardous material compliance with Colorado Department of Public Health and Environment (CDPHE) standards is required as part of the application.

Verified 2026-07-17 · Source

When you need this permit

  • Demolition must comply with Colorado Department of Public Health and Environment (CDPHE) standards; proof of compliance (e.g., asbestos inspection) is required with the application
  • Utility disconnects should be verified/arranged as part of the demolition scope
  • Apply via eTRAKiT (arvadapermits.org) or in person at City Hall

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Residential Demolition — Minor InteriorTable 18-5, Residential Flat-Rate Permit Fees
$67.00
Residential Demolition — Major BuildingTable 18-5
$135.50
Commercial Demolition — Minor InteriorTable 18-3, Miscellaneous Permits, Inspections and Other Fees
$67.00
Commercial Demolition — Major BuildingTable 18-3
$136.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Arvada building department
~0–3 business days

How long did your Demolition Permit permit actually take in Arvada?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Verification that demolition is complete and site meets City requirements

See the full Arvada inspection guide — scheduling & re-inspection fees →

Tips

  • Arvada's demolition fees are flat-rate and inexpensive ($67-$136 depending on scope and minor-vs-major classification) — the bulk of cost/time for a demolition project is typically CDPHE asbestos compliance, not the City permit fee itself.
  • Confirm utility disconnects (gas, electric, water, sewer) are arranged before demolition begins to avoid inspection delays.

Frequently asked questions

Arvada requires a demolition permit for: Demolition must comply with Colorado Department of Public Health and Environment (CDPHE) standards; proof of compliance (e.g., asbestos inspection) is required with the application; Utility disconnects should be verified/arranged as part of the demolition scope; Apply via eTRAKiT (arvadapermits.org) or in person at City Hall. If your project isn't listed, confirm with City of Arvada — Building Safety Division at 720-898-7620 before starting work.

Minor interior demolition is $67.00 (both residential and commercial). Major building demolition is $135.50 for residential or $136.00 for commercial, per the City's Table 18-3 and Table 18-5 fee schedules.

Plan review for a demolition permit in Arvada typically runs 0–3 business days. This is an estimate, not a published figure — confirm current review times with City of Arvada — Building Safety Division at 720-898-7620.

You'll need: Demolition Permit Application (eTRAKiT); CDPHE Compliance Documentation. See the required-documents checklist on this page for details on each.

Arvada requires 1 inspection(s) for a demolition permit, in order: Final. Schedule each through City of Arvada — Building Safety Division (720-898-7620).

Apply through City of Arvada — Building Safety Division at 8101 Ralston Road, Arvada, CO 80002. Phone: 720-898-7620, email: buildingpermits@arvada.org. Office hours: Mon–Fri, 8 a.m.–5 p.m.; permits are applied for and paid online via eTRAKiT at arvadapermits.org — permits are no longer processed over the counter. Official information: https://www.arvadaco.gov/332/Building-Permits.

Arvada, Colorado has adopted: 2024 International Building Code (IBC) — CONFIRMED LIVE 2026-07-17: the City's 'Adopted building codes and design criteria' page (arvadaco.gov/165) now lists the 2024 IBC under 'Current adopted building codes (adopted March 24, 2026)', with the 2018 IBC moved to 'Previous adopted building codes (in effect October 2020-March 2026)'; the City's '2026 Building Code updates' page (arvadaco.gov/1388) confirms in past tense that 'The changes went into effect on July 1, 2026.' Permits submitted before July 1, 2026 could still use the 2018 IBC. CAVEAT: as of 2026-07-17 some Arvada operational permit-type pages had NOT been updated to reflect this switch — see per-permitType notes for mechanical/plumbing and re-roofing, which still cite 2018-cycle codes as current; 2024 International Residential Code (IRC) — same confirmed-live status as the IBC line above (arvadaco.gov/165, arvadaco.gov/1388, both verified 2026-07-17); includes the reorganized Chapter 3 and new ADU/tiny-house/3D-printed-home appendices per arvadaco.gov/1461 (Significant Changes list); 2024 International Fuel Gas Code (IFGC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17; 2024 International Mechanical Code (IMC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17; HOWEVER the live Residential Mechanical & Plumbing operational page (arvadaco.gov/434, verified 2026-07-17) still states 'Requirements follow the 2018 IRC and 2018 IECC, adopted by the City of Arvada... we have an upcoming code adoption' — a direct, unresolved contradiction between two of Arvada's own live pages; confirm current status directly with Building Safety Division for mechanical/plumbing submittals; 2024 International Plumbing Code (IPC) — same contradiction as the IMC line above: arvadaco.gov/165 lists 2024 IPC as current, but the live arvadaco.gov/434 operational page (verified 2026-07-17) still frames the 2024 IPC as an 'upcoming' change and cites 2018 IPC as governing; 2024 International Property Maintenance Code (IPMC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17, replacing the 2009 IPMC (deleting 45 prior municipal amendments per arvadaco.gov/1461); Colorado Model Low Energy Carbon Code, based on the 2024 International Energy Conservation Code (IECC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17, replacing the 2018 IECC; includes EV-ready/electric-ready/solar-ready mandates per arvadaco.gov/1388 and arvadaco.gov/1446; 2024 International Fire Code (IFC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17; 2024 International Existing Building Code (IEBC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17; 2023 National Electrical Code (NEC) / NFPA 70 — CONFIRMED still the governing electrical code as of 2026-07-17 per the City's own explicit statement on arvadaco.gov/1446 ('For Builders: Detailed changes coming in 2026'): 'Please note that the 2023 National Electrical Code will remain the electrical code for the City of Arvada, however the City does expect to begin implementing the 2026 NEC later on in 2026, when the State of Colorado begins implementation.' NOTE: arvadaco.gov/165's 'Current adopted building codes' list also includes an entry for '2026 National Electrical Code' — this appears to be an inconsistency/premature listing on that summary page, since the more specific, explicit 1446 page confirms 2023 NEC remains in effect pending State of Colorado action; treating 2023 NEC as the operative code per the more explicit source; 2024 International Swimming Pool and Spa Code (ISPSC) — listed under 'Current adopted building codes' on arvadaco.gov/165 as of 2026-07-17; Arvada Wildfire Resiliency Code (based on the Colorado Wildfire Resiliency Code) — CONFIRMED LIVE 2026-07-17: listed under 'Current adopted building codes' on arvadaco.gov/165, and arvadaco.gov/1388 states in past tense 'The City has adopted the Arvada Wildfire Resiliency Code, our first wildfire codes.' First Arvada-specific wildfire code; requires structural hardening and defensible space for new buildings, additions, accessory structures over 120 sq ft, and re-roofing/re-siding projects that replace more than 25% of the roof covering or exterior siding, within identified wildfire risk zones (map based on Jefferson County's wildfire map per arvadaco.gov/1461). CAVEAT: the live Re-Roofing operational page (arvadaco.gov/417, verified 2026-07-17) does not reference this code and still states 'Ice Barrier (Ice and Water Shield) not required' — directly contradicting arvadaco.gov/165's design-criteria section, which states 'Ice and Water Shield is required in Arvada... this is a change per our new adopted building codes.' This specific point is an unresolved live contradiction on Arvada's own website as of 2026-07-17. Local amendments apply — see the Arvada overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-17.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Arvada building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.