Demolition Permit in Arvada, Colorado
Required for full or partial demolition of residential and commercial structures in Arvada. Processed as a flat-rate permit distinguishing minor interior demolition from major building demolition; asbestos/hazardous material compliance with Colorado Department of Public Health and Environment (CDPHE) standards is required as part of the application.
Verified 2026-07-01 · Source
When you need this permit
- Demolition must comply with Colorado Department of Public Health and Environment (CDPHE) standards; proof of compliance (e.g., asbestos inspection) is required with the application
- Utility disconnects should be verified/arranged as part of the demolition scope
- Apply via eTRAKiT (arvadapermits.org) or in person at City Hall
Required documents
- Req
Demolition Permit Application (eTRAKiT)
Online application through arvadapermits.org
- Req
CDPHE Compliance Documentation
Proof of compliance with Colorado Department of Public Health and Environment standards (e.g., asbestos inspection/abatement documentation) where applicable
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Demolition — Minor Interior | $67.00 | Table 18-5, Residential Flat-Rate Permit Fees |
| Residential Demolition — Major Building | $135.50 | Table 18-5 |
| Commercial Demolition — Minor Interior | $67.00 | Table 18-3, Miscellaneous Permits, Inspections and Other Fees |
| Commercial Demolition — Major Building | $136.00 | Table 18-3 |
Review timeline
~0–3 business days
Typical estimate — confirm current times with the Arvada building department
Inspection process
- 1
Final
Verification that demolition is complete and site meets City requirements
Tips
- Arvada's demolition fees are flat-rate and inexpensive ($67-$136 depending on scope and minor-vs-major classification) — the bulk of cost/time for a demolition project is typically CDPHE asbestos compliance, not the City permit fee itself.
- Confirm utility disconnects (gas, electric, water, sewer) are arranged before demolition begins to avoid inspection delays.
Frequently asked questions
- How much does a demolition permit cost in Arvada?
- Minor interior demolition is $67.00 (both residential and commercial). Major building demolition is $135.50 for residential or $136.00 for commercial, per the City's Table 18-3 and Table 18-5 fee schedules.
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
- City of Arvada — Building Safety Division — official building department
- City of Arvada — Building Fee Schedule (Table 18-3 and Table 18-5, demolition fee lines)
- City of Arvada — Building Permits
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Arvada building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Arvada
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.