Demolition Permit — Berthoud, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.berthoud.org/DocumentCenter/View/7219/2026-Fee-Schedule
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Demolition Permit in Berthoud, Colorado
Required for demolition of structures in Berthoud, billed as a flat over-the-counter fee. A separate, additional 'Historic Building Alteration/Demolition' Planning Division application fee applies if the structure has historic designation.
Verified 2026-07-06 · Source
When you need this permit
- Governed by the 2024 IBC/IRC and 2024 IEBC as locally amended
- Contractor must hold a Town of Berthoud Trade Contractor license (demolition/excavation falls under the Trade Contractor category) Contractor
- Historic Building Alteration/Demolition requires a separate Planning Division application and fee if the structure carries historic designation
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Inspection
Site cleared, utilities properly capped/disconnected, debris removed per approved plan
See the full Berthoud inspection guide — scheduling & re-inspection fees →
Tips
- Demolition is billed under the Over-the-Counter One-Stop Fees track ($150 base + $25 admin + $25 tech = $200 total) — the same flat-fee structure as AC, furnace replacement, gas piping, and re-roofing permits.
- If your structure has historic designation, budget for a separate $100 Historic Building Alteration/Demolition Planning Division fee in addition to the $200 Building Department demolition permit fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Berthoud building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Berthoud
Demolition Permit in other cities
Compare demolition permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Berthoud project checklist
Describe your project once and get every permit, document, and fee it triggers in Berthoud — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →