Change of Use / Change of Occupancy — Berthoud, Colorado · Requirements sheet
Verified 2026-08-13 · Source: https://www.berthoud.org/178/Planning-Department
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use / Change of Occupancy in Berthoud, Colorado
Berthoud has no standalone 'change of use permit' by that name — confirmed absent from the Town's Building Department and Planning Department pages and from the 2026 Schedule of Rates, Charges and Fees' Application Fees section, all checked directly this session. A change in use is instead addressed through the Development Code's Table 3.3 land-use framework (Berthoud Municipal Code Section 30-3, current version effective December 10, 2025), which marks each land use as either a principal use (allowed by right) or a conditional use (requiring a Conditional Use Permit / Use by Special Review) within each zone district, plus — on the building-code side — the 2024 International Existing Building Code's Change of Occupancy provisions already adopted by the Town (Berthoud Municipal Code Chapter 11.3). Distinctively for this corpus, the Berthoud Fire Protection District (BFPD) ALSO runs its own separate 'Change of Occupancy' planning/zoning review with a real, published $100.00 flat fee — a genuinely third reviewing authority beyond the Town's zoning and building-code tracks.
Verified 2026-08-13 · Source
When you need this permit
- No standalone change-of-use permit, application, or checklist is published by the Town of Berthoud; confirmed absent from the Building Department page, the Planning Department page, and the 2026 Fee Schedule's Application Fees section, all checked directly this session
- Development Code Table 3.3 (Berthoud Municipal Code Section 30-3, current version effective December 10, 2025) lists, for each zone district (AG, TN, R1, R2, R3, R4, R5, C1, C2, M1, M2), whether a given land use is a principal use (marked ■, allowed by right) or a conditional use (marked □, requiring approval of a Conditional Use Permit / Use by Special Review) — confirmed directly against the Town's current code via its eLaws mirror
- For a land use not specifically listed in Table 3.3, Town Administration makes a written determination of whether the proposed use is 'similar' to a listed principal or conditional use; if deemed similar to a conditional use, it is processed as a conditional use under the Code (Section 30-3-104)
- If the proposed use is a conditional use rather than a use by right in the applicable zone district, a Conditional Use Permit / Use by Special Review application is required under Section 30-3-106: a land use application form, a current title commitment (dated within 30 days of submittal), a written statement describing the use and how it meets the review criteria, a site development map (topography, buildings, parking, utilities, drainage), preliminary building plans and elevations, and a property ownership report for parcels within 300 feet
- Review proceeds through an optional pre-application conference, staff completeness certification, published/mailed public notice (newspaper plus mailing to property owners and mineral interest holders within 300 feet, and referral agencies), a Planning Commission recommendation, and a Board of Trustees public hearing and final decision against seven approval criteria (zoning conformance, comprehensive plan alignment, adequate public utilities, no substantial character alteration, efficient traffic circulation, and mitigation of negative impacts, among others)
- Separately, the Berthoud Fire Protection District (BFPD) reviews 'Change of Occupancy' as its own line item under its Planning and Zoning Review Fees schedule, with a real published $100.00 flat fee — confirmed directly via BFPD's own Consolidated Fee Schedule effective January 1, 2026; this is a genuinely distinct review from both the Town's zoning-side Conditional Use process and the Town's building-code-side review below
- On the building-code side, the Town's adopted 2024 International Existing Building Code (IEBC), already documented in this file's codesAdopted list (Berthoud Municipal Code Chapter 11.3), governs the physical/life-safety compliance requirements that apply when a building's occupancy classification changes, independent of whether the underlying land use also requires zoning approval
- If the change of use involves any construction, remodeling, alteration, or a change in occupancy classification requiring building-code compliance work, the ordinary Town Building Permit process applies (see this file's residential-addition-remodel and commercial-tenant-improvement entries) — billed under the general valuation-based Building Permit Fee table, with no distinct change-of-use fee line
- Contact the Planning & Building Department directly (970-532-2643 option 3; building@berthoud.org) to confirm current practice for a specific change-of-use scenario, since no single consolidated process or fee page addresses this exact scenario end-to-end
Required documents
Check off what you have — your progress is saved on this device.
Fee schedule
Review timeline
Inspection process
- 1
Zoning/Use Compliance Review
Planning Commission review and Board of Trustees public hearing against the Section 30-3-106 approval criteria, required only if the proposed use is a conditional use rather than a use by right
- 2
BFPD Change of Occupancy Review
Separate review by the Berthoud Fire Protection District under its own Planning and Zoning Review Fees schedule ($100.00)
See the full Berthoud inspection guide — scheduling & re-inspection fees →
Tips
- Berthoud has no single, standalone 'change of use permit' — start by checking Development Code Table 3.3 for your specific zone district to see whether your proposed use is a principal use (■, by right, no zoning approval needed) or a conditional use (□, requiring the $7,500 Conditional Use Permit / Use by Special Review process).
- Don't overlook the Berthoud Fire Protection District's own separate $100 Change of Occupancy review — it's a real, distinctly-published line item on BFPD's own fee schedule, on top of whatever the Town itself charges for zoning or building-permit review of the same use change.
- If your change of use also involves construction, remodeling, or a formal change in occupancy classification, the 2024 IEBC (already adopted by the Town) and the ordinary Building Permit process apply independently of, and in addition to, any zoning-side Conditional Use review.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Berthoud building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Berthoud
Change of Use / Change of Occupancy in other cities
Compare change of use / change of occupancy fees across Colorado →
Look up this fee in a different city →