Plumbing Permit — Berthoud, Colorado · Requirements sheet
Reviewed 2026-07-06 · Source: https://www.berthoud.org/DocumentCenter/View/7032/2024-I-Code-Amendment-
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Berthoud, Colorado
Required for installation, alteration, or repair of plumbing systems in Berthoud, governed by the 2024 International Plumbing Code (IPC) as locally amended (or the corresponding chapters of the 2024 IRC for one- and two-family work). Plumbers must hold an active Colorado State Plumbing Board (DORA) license, contemporaneously verified by the Town — the same state-anchored model as electrical, with the Town's own Trade Contractor license fee waived for plumbing contractors.
Reviewed 2026-07-06 · Source
When you need this permit
- Governed by the 2024 IPC (Chapters 1-13) as adopted, or the 2024 IRC plumbing provisions for one- and two-family dwellings, both locally amended (12-inch sewer depth, 12-inch roof drain extension, DWV rough testing by water or air without evidence of leakage)
- Plumbers must hold a current Colorado State Plumbing Board (DORA) license; verified contemporaneously by Town/SAFEbuilt staff per the Town's posted HB19-1086 procedure (CRS Title 12 Article 155)
- A Town of Berthoud Trade Contractor license is required for the business entity, but the Town charges NO separate license fee for Plumbing Contractors specifically, per Ordinance No. 1376 Appendix A Contractor
- Graywater systems (where installed in new homes) must comply with Colorado State Regulation 86; the Town is the designated local agency for graywater oversight and requires graywater specifications and connections to be identified on permit drawings
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Plumbing (DWV)
Drain-waste-vent system tested by water or air without evidence of leakage before concealment
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified; graywater system verified against NSF 350/Regulation 86 where applicable
See the full Berthoud inspection guide — scheduling & re-inspection fees →
Tips
- Like electrical, Berthoud waives its own Trade Contractor license fee for plumbing contractors specifically — but your Colorado DORA Plumbing Board license status is actively verified by the Town, not just checked once at initial registration. Contractor
- Graywater systems are only permitted in new homes where the plumbing was originally designed for graywater reuse — this is not a retrofit option, and specifications must be shown on the original permit drawings.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Berthoud building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Berthoud
Plumbing Permit in other cities
Compare plumbing permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Berthoud project checklist
Describe your project once and get every permit, document, and fee it triggers in Berthoud — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →