Plumbing Permit in Bennett, Colorado

Required for installation, alteration, or repair of plumbing systems in Bennett. Unlike electrical (which is 'Set by State'), the Town's own fee schedule bills Plumbing Permits under 'See Building Permit' — confirming the Town of Bennett runs its OWN local plumbing permitting/review process on its valuation-based Building Permit fee table, rather than deferring to the Colorado State Plumbing Board. Governed by the 2024 IPC as adopted (2018 IPC for pre-transition permits). Contractors need a Colorado State Master Plumber License/Plumbing Contractor License plus a Town of Bennett Plumbing Registration ($75).

Verified 2026-07-06 · Source

When you need this permit

  • Governed by the 2024 International Plumbing Code (IPC) as adopted effective July 1, 2026 (2018 IPC for permits issued/grandfathered before that date)
  • Fee billed on the Town's own Building Permit valuation table ('See Building Permit' per the fee schedule), NOT the state schedule used for electrical
  • Contractors must hold a current Colorado State Master Plumber License and Colorado State Plumbing Contractor License Contractor
  • Contractors must additionally hold a Town of Bennett Plumbing Registration ($75.00 per the June 2026 Schedule of Fees)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plumbing Permit Fee (same valuation-based schedule as Building Permit)Fee schedule lists Plumbing Permit as 'See Building Permit'
$23.50 minimum, scaling per the valuation tiers in the June 2026 Schedule of Fees
Minimum Valuation — Water Heater install/replacementTown of Bennett Permit Valuations guide
$1,800 each
Minimum Valuation — Backflow preventer
$375 each
Minimum Valuation — Pressure Reducing Valve (PRV)
$375 each
Minimum Valuation — Sewer service (on property)
$200 per linear foot of trench
Minimum Valuation — Water service (on property)
$90 per linear foot of trench
Town of Bennett Plumbing Registration
$75.00
Plan Review (Administrative) Fee
65% of Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit permit actually take in Bennett?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified

See the full Bennett inspection guide — scheduling & re-inspection fees →

Tips

  • Unlike electrical permits (billed under the state fee schedule), Bennett's plumbing permit fee is calculated on the Town's OWN Building Permit valuation table — confirming the Town runs its own local plumbing plan review/inspection program rather than deferring to Colorado's State Plumbing Board.
  • A standalone Water Heater replacement carries a published minimum valuation of $1,800 in Bennett's Permit Valuations guide — use the Quick Permit process rather than a full Building Permit application for this straightforward scope.

Frequently asked questions

Bennett requires a plumbing permit for: Governed by the 2024 International Plumbing Code (IPC) as adopted effective July 1, 2026 (2018 IPC for permits issued/grandfathered before that date); Fee billed on the Town's own Building Permit valuation table ('See Building Permit' per the fee schedule), NOT the state schedule used for electrical; Contractors must hold a current Colorado State Master Plumber License and Colorado State Plumbing Contractor License; Contractors must additionally hold a Town of Bennett Plumbing Registration ($75.00 per the June 2026 Schedule of Fees). If your project isn't listed, confirm with Town of Bennett Community Development Department, Building Department at 303-644-3249 before starting work.

In Bennett, the published Plumbing Permit Fee (same valuation-based schedule as Building Permit) is: $23.50 minimum, scaling per the valuation tiers in the June 2026 Schedule of Fees. Additional published fees: Minimum Valuation — Water Heater install/replacement — $1,800 each; Minimum Valuation — Backflow preventer — $375 each; Minimum Valuation — Pressure Reducing Valve (PRV) — $375 each; Minimum Valuation — Sewer service (on property) — $200 per linear foot of trench; Minimum Valuation — Water service (on property) — $90 per linear foot of trench; Town of Bennett Plumbing Registration — $75.00; Plan Review (Administrative) Fee — 65% of Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Bennett does not publish a plan-review timeline for this permit. Contact Town of Bennett Community Development Department, Building Department at 303-644-3249 for current turnaround.

You'll need: Building Permit Application (Plumbing scope); Town of Bennett Plumbing Registration. See the required-documents checklist on this page for details on each.

Bennett requires 2 inspection(s) for a plumbing permit, in order: Rough Plumbing, Final Inspection. Schedule each through Town of Bennett Community Development Department, Building Department (303-644-3249).

Apply through Town of Bennett Community Development Department, Building Department at 207 Muegge Way, Bennett, CO 80102. Phone: 303-644-3249, email: bennettbuilding@bennett.co.us. Office hours: Main Town line 303-644-3249 (Building Department extension 1032 per the Building Permits page). Chief Building Official (Steve Jones, Charles Abbott Associates — Bennett's building department is staffed via a CAA contract) holds Drop-In Hours at Town Hall Tuesdays 12:30-1:30 p.m.; email bennettbuilding@bennett.co.us or stevejones@caa.inc to schedule a plan/project review meeting. Additional CAA inspection staff: Brad Jones 720-960-0576 (bradjones@caa.inc), Daniel Willman 720-361-9732 (danielwillman@caa.inc). Inspection requests must be received by 4:00 p.m. the business day before for next-day scheduling; inspections occur Monday-Friday, 7:00 a.m.-5:00 p.m., no specific-window guarantee.. Official information: https://www.bennettco.gov/community-development/page/building-department.

Bennett, Colorado has adopted: 2024 International Building Code (IBC) — effective July 1, 2026 per Town of Bennett 'Building Code Update 2026' notice; 2024 International Residential Code (IRC) — effective July 1, 2026; 2024 International Existing Building Code (IEBC) — effective July 1, 2026; 2024 International Mechanical Code (IMC) — effective July 1, 2026; 2024 International Energy Conservation Code (IECC) — effective July 1, 2026; 2024 International Plumbing Code (IPC) — effective July 1, 2026; 2024 International Fire Code (IFC) — effective July 1, 2026 for the Town's own adoption (Bennett-Watkins Fire Rescue, the separate special district that performs fire plan review/inspection for Bennett, Watkins, and unincorporated Adams/Arapahoe County, is separately shown by its own website as still operating under the 2018 IFC as of this review — confirm current fire-district code edition directly with Bennett-Watkins Fire Rescue at 303-644-3572, since fire code adoption is that district's own action, not the Town Building Department's); 2024 International Fuel Gas Code (IFGC) — effective July 1, 2026; 2024 International Swimming Pool and Spa Code (ISPSC) — effective July 1, 2026 (new code title added in this cycle; no 2018-cycle equivalent was listed); Colorado Model Electric and Solar Ready Code — effective July 1, 2026 (statewide model code addressing EV/solar readiness, adopted by the Town as part of the 2026 cycle); 2025 Colorado Wildfire Resiliency Code — effective July 1, 2026; 2023 National Electrical Code (NEC) — currently in effect per the Town's Adopted Building Department Codes list (the NEC was not part of the July 1, 2026 update batch and continues under its existing adoption); PRIOR CYCLE (2018 codes), still governing permits issued before July 1, 2026 that have not expired: 2018 IBC, 2018 IRC, 2018 IPC, 2018 IMC, 2018 IEBC, 2018 IFC, 2018 IFGC, 2018 IECC.; Transition rule (per the Town's 'Building Code Update 2026' notice, verified directly): the Town issued NO permits under the 2024 cycle before July 1, 2026. Permits issued under the 2018 cycle before July 1, 2026 may finish construction on that code cycle, UNLESS the permit expires after July 1, 2026, in which case renewal or a new permit after that date requires meeting 2024 code. All permits issued on or after July 1, 2026 must meet the 2024 I-codes. EXCEPTION: 8 named residential master-plan developments currently under construction on 2018-cycle approved master plans (Bennett Avenue Townhomes; Bennett Crossing Filing 5 Phases 1A/1B; Bennett Ranch Filing 1; Bennett Ranch Filing 2; Horizon Village; Muegge Farms Filing 4 Phases 4A/4B; Muegge Farms Filing 5; Muegge Farms Filing 7 Phase 1) are given until July 1, 2028 to finish their current phase under the 2018 cycle. As of this file's lastVerified date (2026-07-06), the 2024 cycle is the live, current adopted code for new permit applications outside these named exceptions.. Local amendments apply — see the Bennett overview page for the full list.

No — the Town lists Water Heater replacement under its Quick Permits minimum valuation check sheet at a $1,800 minimum valuation, intended for the streamlined Quick Permit application path rather than a full plan-review Building Permit submittal.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bennett building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.