Electrical Permit in Bennett, Colorado

Required for installation, alteration, or repair of electrical systems in Bennett. Per the Town's own June 2026 Schedule of Fees, electrical permit fees are 'Set by State' — the Town of Bennett does NOT run its own certified electrical inspection program and defers to the Colorado State Electrical Board (DORA/DPO) statewide fee schedule (CRS 12-23-117). Governed by the 2023 NEC. Contractors need a Colorado State Master Electric License and Electrical Contractor License, plus a Town of Bennett Electrical Registration (no fee).

Verified 2026-07-06 · Source

When you need this permit

  • Governed by the 2023 National Electrical Code (NEC) as in effect
  • Fee is 'Set by State' per the Town's fee schedule — billed under the Colorado State Electrical Board's own statewide fee schedule, not a Town-set valuation table
  • Contractors must hold a current Colorado State Master Electric License and Colorado State Electrical Contractor License Contractor
  • Contractors must additionally hold a Town of Bennett Electrical Registration (No Fee per the fee schedule — a registration, not a licensed class, per the Contractors page's explicit note that 'ELECTRICAL AND PLUMBING ARE REGISTRATIONS NOT LICENSES')
  • Residential electrical fees are based on square footage of the installation; commercial electrical fees are based on electrical valuation, per the State's own fee schedule structure (Town of Bennett Permit Valuations guide)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit FeeJune 24, 2026 Town of Bennett Schedule of Fees explicitly defers to the state schedule rather than a Town valuation table
Set by State (Colorado State Electrical Board statewide fee schedule)
Minimum Valuation — Electrical service upgrade, 100-125 AMPTown of Bennett Permit Valuations guide, Quick Permit minimum valuation check sheet
$1,500
Minimum Valuation — Electrical service upgrade, 150-200 AMP
$2,500
Minimum Valuation — EV Charger
$1,100 (or more if a panel service upgrade is also needed)
Minimum Valuation — Hot Tub Electrical
$1,000 (or more if a panel service upgrade is also needed)
Town of Bennett Electrical Registration
No Fee

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Bennett?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment

  2. 2

    Final Inspection

    Devices installed, panel labeled, system energized and verified

See the full Bennett inspection guide — scheduling & re-inspection fees →

Tips

  • Unlike Bennett's building/plumbing/mechanical permits (which are billed on the Town's own local valuation table), electrical permit fees are explicitly 'Set by State' — meaning your electrical permit fee follows the Colorado State Electrical Board's statewide schedule, not a Bennett-specific fee table.
  • Electrical contractors need a Colorado State Master Electric License and State Electrical Contractor License PLUS a Town of Bennett Electrical Registration — but the Town registration itself carries no fee, unlike most other Bennett contractor classes. Contractor

Frequently asked questions

Bennett requires an electrical permit for: Governed by the 2023 National Electrical Code (NEC) as in effect; Fee is 'Set by State' per the Town's fee schedule — billed under the Colorado State Electrical Board's own statewide fee schedule, not a Town-set valuation table; Contractors must hold a current Colorado State Master Electric License and Colorado State Electrical Contractor License; Contractors must additionally hold a Town of Bennett Electrical Registration (No Fee per the fee schedule — a registration, not a licensed class, per the Contractors page's explicit note that 'ELECTRICAL AND PLUMBING ARE REGISTRATIONS NOT LICENSES'); Residential electrical fees are based on square footage of the installation; commercial electrical fees are based on electrical valuation, per the State's own fee schedule structure (Town of Bennett Permit Valuations guide). If your project isn't listed, confirm with Town of Bennett Community Development Department, Building Department at 303-644-3249 before starting work.

In Bennett, the published Electrical Permit Fee is: Set by State (Colorado State Electrical Board statewide fee schedule). Additional published fees: Minimum Valuation — Electrical service upgrade, 100-125 AMP — $1,500; Minimum Valuation — Electrical service upgrade, 150-200 AMP — $2,500; Minimum Valuation — EV Charger — $1,100 (or more if a panel service upgrade is also needed); Minimum Valuation — Hot Tub Electrical — $1,000 (or more if a panel service upgrade is also needed); Town of Bennett Electrical Registration — No Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Bennett does not publish a plan-review timeline for this permit. Contact Town of Bennett Community Development Department, Building Department at 303-644-3249 for current turnaround.

You'll need: Electrical Permit Application; Town of Bennett Electrical Registration. See the required-documents checklist on this page for details on each.

Bennett requires 2 inspection(s) for an electrical permit, in order: Rough Electrical, Final Inspection. Schedule each through Town of Bennett Community Development Department, Building Department (303-644-3249).

Apply through Town of Bennett Community Development Department, Building Department at 207 Muegge Way, Bennett, CO 80102. Phone: 303-644-3249, email: bennettbuilding@bennett.co.us. Office hours: Main Town line 303-644-3249 (Building Department extension 1032 per the Building Permits page). Chief Building Official (Steve Jones, Charles Abbott Associates — Bennett's building department is staffed via a CAA contract) holds Drop-In Hours at Town Hall Tuesdays 12:30-1:30 p.m.; email bennettbuilding@bennett.co.us or stevejones@caa.inc to schedule a plan/project review meeting. Additional CAA inspection staff: Brad Jones 720-960-0576 (bradjones@caa.inc), Daniel Willman 720-361-9732 (danielwillman@caa.inc). Inspection requests must be received by 4:00 p.m. the business day before for next-day scheduling; inspections occur Monday-Friday, 7:00 a.m.-5:00 p.m., no specific-window guarantee.. Official information: https://www.bennettco.gov/community-development/page/building-department.

Bennett, Colorado has adopted: 2024 International Building Code (IBC) — effective July 1, 2026 per Town of Bennett 'Building Code Update 2026' notice; 2024 International Residential Code (IRC) — effective July 1, 2026; 2024 International Existing Building Code (IEBC) — effective July 1, 2026; 2024 International Mechanical Code (IMC) — effective July 1, 2026; 2024 International Energy Conservation Code (IECC) — effective July 1, 2026; 2024 International Plumbing Code (IPC) — effective July 1, 2026; 2024 International Fire Code (IFC) — effective July 1, 2026 for the Town's own adoption (Bennett-Watkins Fire Rescue, the separate special district that performs fire plan review/inspection for Bennett, Watkins, and unincorporated Adams/Arapahoe County, is separately shown by its own website as still operating under the 2018 IFC as of this review — confirm current fire-district code edition directly with Bennett-Watkins Fire Rescue at 303-644-3572, since fire code adoption is that district's own action, not the Town Building Department's); 2024 International Fuel Gas Code (IFGC) — effective July 1, 2026; 2024 International Swimming Pool and Spa Code (ISPSC) — effective July 1, 2026 (new code title added in this cycle; no 2018-cycle equivalent was listed); Colorado Model Electric and Solar Ready Code — effective July 1, 2026 (statewide model code addressing EV/solar readiness, adopted by the Town as part of the 2026 cycle); 2025 Colorado Wildfire Resiliency Code — effective July 1, 2026; 2023 National Electrical Code (NEC) — currently in effect per the Town's Adopted Building Department Codes list (the NEC was not part of the July 1, 2026 update batch and continues under its existing adoption); PRIOR CYCLE (2018 codes), still governing permits issued before July 1, 2026 that have not expired: 2018 IBC, 2018 IRC, 2018 IPC, 2018 IMC, 2018 IEBC, 2018 IFC, 2018 IFGC, 2018 IECC.; Transition rule (per the Town's 'Building Code Update 2026' notice, verified directly): the Town issued NO permits under the 2024 cycle before July 1, 2026. Permits issued under the 2018 cycle before July 1, 2026 may finish construction on that code cycle, UNLESS the permit expires after July 1, 2026, in which case renewal or a new permit after that date requires meeting 2024 code. All permits issued on or after July 1, 2026 must meet the 2024 I-codes. EXCEPTION: 8 named residential master-plan developments currently under construction on 2018-cycle approved master plans (Bennett Avenue Townhomes; Bennett Crossing Filing 5 Phases 1A/1B; Bennett Ranch Filing 1; Bennett Ranch Filing 2; Horizon Village; Muegge Farms Filing 4 Phases 4A/4B; Muegge Farms Filing 5; Muegge Farms Filing 7 Phase 1) are given until July 1, 2028 to finish their current phase under the 2018 cycle. As of this file's lastVerified date (2026-07-06), the 2024 cycle is the live, current adopted code for new permit applications outside these named exceptions.. Local amendments apply — see the Bennett overview page for the full list.

The Town of Bennett's own fee schedule lists electrical permit fees as 'Set by State,' confirming Bennett defers to the Colorado State Electrical Board (DORA/DPO) statewide fee schedule rather than running its own certified local electrical inspection program. A Town of Bennett Electrical Registration (no fee) is still required in addition to the required state license.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bennett building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.