EV Charger / EVSE Installation Permit in Bennett, Colorado

Required for installation of a Level 2 (or higher) electric vehicle charging circuit in Bennett. Filed as a standard Electrical Permit — fees are 'Set by State' per the Colorado State Electrical Board (DORA/DPO) statewide schedule (CRS 12-23-117), but the Town of Bennett publishes its own real quick-permit minimum valuation specifically for EV chargers ($1,100) in its Permit Valuations guide, distinct from its other electrical minimum-valuation line items.

Verified 2026-07-20 · Source

When you need this permit

  • Governed by the 2023 National Electrical Code (NEC) as in effect in Bennett
  • Electrical permit fee itself is 'Set by State' per the Town's June 2026 Schedule of Fees — billed under the Colorado State Electrical Board's own statewide fee schedule
  • Town of Bennett publishes a dedicated 'EV Charger' minimum valuation of $1,100 in its Permit Valuations (Quick Permit) guide — used as the minimum installation valuation for quick-permit processing; valuation increases if a panel/service upgrade is also needed (see the Town's separate Electrical service upgrade minimum valuations: $1,500 for 100-125 AMP, $2,500 for 150-200 AMP)
  • Contractors must hold a current Colorado State Master Electric License and Colorado State Electrical Contractor License, plus a Town of Bennett Electrical Registration (no fee) Contractor
  • The Town's 2026 code update adopts the Colorado Model Electric and Solar Ready Code effective July 1, 2026, the state's model EV-charging/solar-readiness code — new construction and major electrical work in Bennett going forward will be reviewed for EV-ready circuit provisions under this code
  • Apply via the Town of Bennett SmartGov portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Minimum Valuation — EV ChargerTown of Bennett Permit Valuations guide, Quick Permit minimum valuation check sheet (effective with the June 2026 fee schedule) — this is the Town's own published minimum installation valuation used for quick-permit processing
$1,100 (or more if a panel service upgrade is also needed)
Electrical Permit Fee (applied against valuation)Town of Bennett Schedule of Fees, June 24, 2026 — electrical permit fees follow the state schedule, not the Town's own building-valuation fee table
Set by State (Colorado State Electrical Board statewide fee schedule)
Minimum Valuation — Electrical service upgrade, 100-125 AMP (if needed alongside EV charger installation)Town of Bennett Permit Valuations guide
$1,500
Minimum Valuation — Electrical service upgrade, 150-200 AMP (if needed alongside EV charger installation)Town of Bennett Permit Valuations guide
$2,500

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Installation Permit permit actually take in Bennett?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Wiring, conduit runs, and disconnect placement before concealment

  2. 2

    Final Inspection

    Devices installed, panel labeled, system energized and verified

See the full Bennett inspection guide — scheduling & re-inspection fees →

Tips

  • Bennett is one of the few jurisdictions in this corpus with a real, published, EV-charger-specific minimum valuation ($1,100) — distinct from its general electrical service-upgrade valuations — even though the underlying permit fee itself is billed under the Colorado State Electrical Board's statewide schedule.
  • If the EV charger installation also requires a panel/service upgrade, the higher of the EV charger valuation or the applicable service-upgrade valuation (or a contractor/owner-provided valuation, if higher) governs, per the Town's Permit Valuations guide.
  • The Town's adoption of the Colorado Model Electric and Solar Ready Code (effective July 1, 2026) is the state's model EV-readiness code — relevant to new-construction electrical rough-in requirements, separate from this retrofit EV charger permit.

Frequently asked questions

Bennett requires an ev charger / evse installation permit for: Governed by the 2023 National Electrical Code (NEC) as in effect in Bennett; Electrical permit fee itself is 'Set by State' per the Town's June 2026 Schedule of Fees — billed under the Colorado State Electrical Board's own statewide fee schedule; Town of Bennett publishes a dedicated 'EV Charger' minimum valuation of $1,100 in its Permit Valuations (Quick Permit) guide — used as the minimum installation valuation for quick-permit processing; valuation increases if a panel/service upgrade is also needed (see the Town's separate Electrical service upgrade minimum valuations: $1,500 for 100-125 AMP, $2,500 for 150-200 AMP); Contractors must hold a current Colorado State Master Electric License and Colorado State Electrical Contractor License, plus a Town of Bennett Electrical Registration (no fee); The Town's 2026 code update adopts the Colorado Model Electric and Solar Ready Code effective July 1, 2026, the state's model EV-charging/solar-readiness code — new construction and major electrical work in Bennett going forward will be reviewed for EV-ready circuit provisions under this code; Apply via the Town of Bennett SmartGov portal. If your project isn't listed, confirm with Town of Bennett Community Development Department, Building Department at 303-644-3249 before starting work.

Bennett publishes a minimum installation valuation of $1,100 for an EV charger (per the Town's Permit Valuations guide), with the actual permit fee itself set by the Colorado State Electrical Board's statewide fee schedule rather than a Town-set table. The valuation increases if a panel/service upgrade is also required.

Bennett does not publish a plan-review timeline for this permit. Contact Town of Bennett Community Development Department, Building Department at 303-644-3249 for current turnaround.

You'll need: Electrical Permit Application; Town of Bennett Electrical Registration. See the required-documents checklist on this page for details on each.

Bennett requires 2 inspection(s) for an ev charger / evse installation permit, in order: Rough Electrical, Final Inspection. Schedule each through Town of Bennett Community Development Department, Building Department (303-644-3249).

Apply through Town of Bennett Community Development Department, Building Department at 207 Muegge Way, Bennett, CO 80102. Phone: 303-644-3249, email: bennettbuilding@bennett.co.us. Office hours: Main Town line 303-644-3249 (Building Department extension 1032 per the Building Permits page). Chief Building Official (Steve Jones, Charles Abbott Associates — Bennett's building department is staffed via a CAA contract) holds Drop-In Hours at Town Hall Tuesdays 12:30-1:30 p.m.; email bennettbuilding@bennett.co.us or stevejones@caa.inc to schedule a plan/project review meeting. Additional CAA inspection staff: Brad Jones 720-960-0576 (bradjones@caa.inc), Daniel Willman 720-361-9732 (danielwillman@caa.inc). Inspection requests must be received by 4:00 p.m. the business day before for next-day scheduling; inspections occur Monday-Friday, 7:00 a.m.-5:00 p.m., no specific-window guarantee.. Official information: https://www.bennettco.gov/community-development/page/building-department.

Bennett, Colorado has adopted: 2024 International Building Code (IBC) — effective July 1, 2026 per Town of Bennett 'Building Code Update 2026' notice; 2024 International Residential Code (IRC) — effective July 1, 2026; 2024 International Existing Building Code (IEBC) — effective July 1, 2026; 2024 International Mechanical Code (IMC) — effective July 1, 2026; 2024 International Energy Conservation Code (IECC) — effective July 1, 2026; 2024 International Plumbing Code (IPC) — effective July 1, 2026; 2024 International Fire Code (IFC) — effective July 1, 2026 for the Town's own adoption (Bennett-Watkins Fire Rescue, the separate special district that performs fire plan review/inspection for Bennett, Watkins, and unincorporated Adams/Arapahoe County, is separately shown by its own website as still operating under the 2018 IFC as of this review — confirm current fire-district code edition directly with Bennett-Watkins Fire Rescue at 303-644-3572, since fire code adoption is that district's own action, not the Town Building Department's); 2024 International Fuel Gas Code (IFGC) — effective July 1, 2026; 2024 International Swimming Pool and Spa Code (ISPSC) — effective July 1, 2026 (new code title added in this cycle; no 2018-cycle equivalent was listed); Colorado Model Electric and Solar Ready Code — effective July 1, 2026 (statewide model code addressing EV/solar readiness, adopted by the Town as part of the 2026 cycle); 2025 Colorado Wildfire Resiliency Code — effective July 1, 2026; 2023 National Electrical Code (NEC) — currently in effect per the Town's Adopted Building Department Codes list (the NEC was not part of the July 1, 2026 update batch and continues under its existing adoption); PRIOR CYCLE (2018 codes), still governing permits issued before July 1, 2026 that have not expired: 2018 IBC, 2018 IRC, 2018 IPC, 2018 IMC, 2018 IEBC, 2018 IFC, 2018 IFGC, 2018 IECC.; Transition rule (per the Town's 'Building Code Update 2026' notice, verified directly): the Town issued NO permits under the 2024 cycle before July 1, 2026. Permits issued under the 2018 cycle before July 1, 2026 may finish construction on that code cycle, UNLESS the permit expires after July 1, 2026, in which case renewal or a new permit after that date requires meeting 2024 code. All permits issued on or after July 1, 2026 must meet the 2024 I-codes. EXCEPTION: 8 named residential master-plan developments currently under construction on 2018-cycle approved master plans (Bennett Avenue Townhomes; Bennett Crossing Filing 5 Phases 1A/1B; Bennett Ranch Filing 1; Bennett Ranch Filing 2; Horizon Village; Muegge Farms Filing 4 Phases 4A/4B; Muegge Farms Filing 5; Muegge Farms Filing 7 Phase 1) are given until July 1, 2028 to finish their current phase under the 2018 cycle. As of this file's lastVerified date (2026-07-06), the 2024 cycle is the live, current adopted code for new permit applications outside these named exceptions.. Local amendments apply — see the Bennett overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bennett building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.