EV Charger / EVSE Installation Permit — Basalt, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://www.basalt.net/DocumentCenter/View/71
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Installation Permit in Basalt, Colorado
Basalt has no separate Town-issued EV charger/EVSE permit or fee. Because ALL electrical work in Basalt (both the Eagle County and Pitkin County portions of town) is permitted and inspected by the State of Colorado Electrical Board rather than the Town Building Department, installing a home or commercial EV charging circuit is filed as a standard electrical permit through the Colorado Division of Professions and Occupations (DPO), the same carve-out that applies to all other electrical work in Basalt.
Verified 2026-07-20 · Source
When you need this permit
- EV charger/EVSE circuit installation is electrical work, and per the Town of Basalt's own Building Permit Application, ALL electrical work in Basalt is permitted and inspected by the State of Colorado Electrical Board (Division of Professions and Occupations), not the Town Building Department — no distinct Town-level 'EV charger permit' exists
- Applied for through the Colorado DPO Online Permitting System, governed by the 2023 NEC (including NEC Article 625, Electric Vehicle Power Transfer System) as referenced on the Town's code-adoption summary
- Colorado HB24-1173 (2024) established streamlined EV-charging-system permitting requirements, but only for counties with population 20,000+ and municipalities with population 10,000+; Basalt's population (~4,000-5,000) is below that municipal threshold, so the Town is not mandated to adopt HB24-1173's expedited local review procedures — electrical permitting for EV chargers in Basalt continues to run through the State DPO Electrical Board carve-out described above
- Electrical contractors must hold current State of Colorado electrical licensure per DORA Electrical Board requirements
- A separate Town of Basalt building permit may still apply to any non-electrical structural/site work associated with a charging installation (e.g., a new equipment pad or accessory structure), reviewed under the Town's standard building permit process
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical / Final Inspection
Performed by the State of Colorado Electrical Board inspector, not a Town of Basalt inspector
See the full Basalt inspection guide — scheduling & re-inspection fees →
Tips
- Do not submit an EV charger electrical application to the Town of Basalt Building Department — file directly with the Colorado DPO Electrical Board's Online Permitting System, exactly as with any other electrical permit in Basalt.
- This carve-out applies identically whether your parcel is in the Eagle County or Pitkin County portion of Basalt.
- Basalt's population is below the 10,000-resident municipal threshold that triggers Colorado HB24-1173's mandatory streamlined local EV-charging permit review procedures, so no Basalt-specific expedited EV permit track was found published.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Basalt building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Basalt
EV Charger / EVSE Installation Permit in other cities
Compare ev charger / evse installation permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Basalt project checklist
Describe your project once and get every permit, document, and fee it triggers in Basalt — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →