EV Charger / EVSE Installation Permit in Basalt, Colorado

Basalt has no separate Town-issued EV charger/EVSE permit or fee. Because ALL electrical work in Basalt (both the Eagle County and Pitkin County portions of town) is permitted and inspected by the State of Colorado Electrical Board rather than the Town Building Department, installing a home or commercial EV charging circuit is filed as a standard electrical permit through the Colorado Division of Professions and Occupations (DPO), the same carve-out that applies to all other electrical work in Basalt.

Verified 2026-07-20 · Source

When you need this permit

  • EV charger/EVSE circuit installation is electrical work, and per the Town of Basalt's own Building Permit Application, ALL electrical work in Basalt is permitted and inspected by the State of Colorado Electrical Board (Division of Professions and Occupations), not the Town Building Department — no distinct Town-level 'EV charger permit' exists
  • Applied for through the Colorado DPO Online Permitting System, governed by the 2023 NEC (including NEC Article 625, Electric Vehicle Power Transfer System) as referenced on the Town's code-adoption summary
  • Colorado HB24-1173 (2024) established streamlined EV-charging-system permitting requirements, but only for counties with population 20,000+ and municipalities with population 10,000+; Basalt's population (~4,000-5,000) is below that municipal threshold, so the Town is not mandated to adopt HB24-1173's expedited local review procedures — electrical permitting for EV chargers in Basalt continues to run through the State DPO Electrical Board carve-out described above
  • Electrical contractors must hold current State of Colorado electrical licensure per DORA Electrical Board requirements
  • A separate Town of Basalt building permit may still apply to any non-electrical structural/site work associated with a charging installation (e.g., a new equipment pad or accessory structure), reviewed under the Town's standard building permit process

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

State of Colorado Electrical Permit FeeThis session did not independently re-verify the current DPO statewide electrical fee table; the fee is NOT part of the Town of Basalt's own Building Permit Fee Schedule
Set by the Colorado DPO Electrical Board fee schedule, not a Town of Basalt fee; no distinct EV/EVSE fee line was found published by the State or the Town

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Installation Permit permit actually take in Basalt?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical / Final Inspection

    Performed by the State of Colorado Electrical Board inspector, not a Town of Basalt inspector

See the full Basalt inspection guide — scheduling & re-inspection fees →

Tips

  • Do not submit an EV charger electrical application to the Town of Basalt Building Department — file directly with the Colorado DPO Electrical Board's Online Permitting System, exactly as with any other electrical permit in Basalt.
  • This carve-out applies identically whether your parcel is in the Eagle County or Pitkin County portion of Basalt.
  • Basalt's population is below the 10,000-resident municipal threshold that triggers Colorado HB24-1173's mandatory streamlined local EV-charging permit review procedures, so no Basalt-specific expedited EV permit track was found published.

Frequently asked questions

Basalt requires an ev charger / evse installation permit for: EV charger/EVSE circuit installation is electrical work, and per the Town of Basalt's own Building Permit Application, ALL electrical work in Basalt is permitted and inspected by the State of Colorado Electrical Board (Division of Professions and Occupations), not the Town Building Department — no distinct Town-level 'EV charger permit' exists; Applied for through the Colorado DPO Online Permitting System, governed by the 2023 NEC (including NEC Article 625, Electric Vehicle Power Transfer System) as referenced on the Town's code-adoption summary; Colorado HB24-1173 (2024) established streamlined EV-charging-system permitting requirements, but only for counties with population 20,000+ and municipalities with population 10,000+; Basalt's population (~4,000-5,000) is below that municipal threshold, so the Town is not mandated to adopt HB24-1173's expedited local review procedures — electrical permitting for EV chargers in Basalt continues to run through the State DPO Electrical Board carve-out described above; Electrical contractors must hold current State of Colorado electrical licensure per DORA Electrical Board requirements; A separate Town of Basalt building permit may still apply to any non-electrical structural/site work associated with a charging installation (e.g., a new equipment pad or accessory structure), reviewed under the Town's standard building permit process. If your project isn't listed, confirm with Town of Basalt Building Department at 970-927-4702 before starting work.

In Basalt, the published State of Colorado Electrical Permit Fee is: Set by the Colorado DPO Electrical Board fee schedule, not a Town of Basalt fee; no distinct EV/EVSE fee line was found published by the State or the Town. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Basalt does not publish a plan-review timeline for this permit. Contact Town of Basalt Building Department at 970-927-4702 for current turnaround.

You'll need: Colorado DPO Electrical Permit Application. See the required-documents checklist on this page for details on each.

Basalt requires 1 inspection(s) for an ev charger / evse installation permit, in order: Rough Electrical / Final Inspection. Schedule each through Town of Basalt Building Department (970-927-4702).

Apply through Town of Basalt Building Department at 101 Midland Avenue, Basalt, CO 81621. Phone: 970-927-4702, email: carlos.peugnet@basalt.net. Office hours: Town of Basalt main line 970-927-4701; Building Department direct line 970-927-4702. Chief Building Official: Mitch Miller, 970-279-4386, mitch.miller@basalt.net. Plans Examiner & Inspector: Carlos Peugnet, 970-279-4385, carlos.peugnet@basalt.net. As of May 2017 the Building Department no longer performs inspections or site visits on Mondays and Fridays (confirmed on the Building Department page).. Official information: https://www.basalt.net/132/Building.

Basalt, Colorado has adopted: 2021 International Building Code (IBC) as locally amended by Town of Basalt Ordinance (Chapter 18 amendments effective July 20, 2023) — confirmed via the Town's own 'Building' page code-adoption summary ('2021 ICC') and via the Town's detailed strike-through/underline local-amendment comparison document (2021-Code-change--ICC-reference-articles, basalt.net/DocumentCenter/View/6221); 2021 International Residential Code (IRC), as locally amended — the Town's own Building Permit Application Checklist is titled for 'Single Family, Duplex, and Townhomes' built to the IRC; 2021 International Mechanical Code (IMC); 2021 International Fuel Gas Code (IFGC) — State of Colorado adopted edition referenced alongside the Town's 2021 IBC/IRC/IMC cycle; 2021 International Existing Building Code (IEBC); 2021 International Plumbing Code (IPC) — adopted at the State of Colorado level and applied by the Town; 2023 National Electrical Code (NEC) — per the Building Department page's current-adoptions summary; NOTE electrical work in Basalt is permitted and inspected by the State of Colorado Electrical Board, not the Town Building Department itself (confirmed directly on the Town's own Building Permit Application form: 'Electrical is permitted and inspected by the State of Colorado'); 2024 Sustainable Building Regulations I & II (SBRI/SBRII) — Town of Basalt Municipal Code Sec. 18-23/18-24/18-25, amended by Ordinance 20, Series of 2024, effective November 12, 2024, reflecting Holy Cross Energy's approximately 90% renewable power supply achievement by end of 2024; Prior/superseded local design-parameter reference: the Town's 'Local Structural Design Parameters' document (basalt.net/documentcenter/view/2388) still headers itself against the 2015 IBC/IRC/IMC/IECC/IEBC code cycle and 2017 NEC/2015 IPC-IFGC — the numeric structural design values on that document (ground snow load, wind speed, seismic category, frost depth) are treated as still-current in this file because the Town's later 2021-code-adoption amendment document (View/6221) re-adopts the identical IRC Table R301.2(1) frost-depth (36 inches) and retaining-wall figures verbatim rather than superseding them; the code-EDITION labels on that older PDF itself are NOT current and should not be read as Basalt's current adopted code cycle.; Local amendments to all adopted codes are codified in Chapter 18 (Building Regulations) of the Basalt Municipal Code; Municode's Basalt library returned an HTTP 403 to direct automated fetch in this session (library.municode.com/co/basalt) — the Town's own downloadable strike-through/underline amendment comparison document (View/6221) was used as the authoritative source for specific local IBC/IRC section amendments instead, since it is a primary Town document rather than a third-party mirror.. Local amendments apply — see the Basalt overview page for the full list.

No. As with all electrical work in Basalt, EV charger circuit installation is permitted and inspected by the State of Colorado Electrical Board (Division of Professions and Occupations), not the Town — apply through the Colorado DPO's Online Permitting System instead.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Basalt building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.