EV Charger / EVSE Permit in Akron, Colorado
The Town of Akron has no local electrical permitting program (Title 10 contains no electrical chapter), so a residential EV charger / EVSE installation follows the same path as all other electrical work in Akron: a Colorado State Electrical Board (DORA/DPO) permit, not a Town-issued permit. No web search of the State Electrical Board's fee materials, the Town's Building Department page, or the Town's live application form turned up an EV-charger-specific fee line item or expedited process — an EV charger circuit is billed under the State Electrical Board's general fee schedule like any other electrical installation.
Reviewed 2026-07-23 · Source
When you need this permit
- A valid Colorado State Electrical permit (State Electrical Board, DORA/DPO) is required prior to installing an EV charger circuit in Akron — obtained online through the State's Electrical and Plumbing Permits system, not from the Town
- A homeowner may perform the work at their own residence under a state homeowner permit if personally performed, the property is not for sale/resale/rent and not open to the public, and all work is inspected before and after concealment Owner-builder
- A licensed Electrical Contractor must pull the permit for company-performed work
- Work must comply with the National Electrical Code (NEC) as adopted by the State of Colorado
- Once the state electrical permit is obtained, the permit number must be provided to the Town of Akron — the Town's current Building Permit Application form has a dedicated 'STATE ELECTRIC PERMIT #' field to record it
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Wiring and circuit installed before concealment; scheduled with the State Electrical Board's inspector for the Akron/Washington County area
- 2
Final Inspection
Charger installed and energized, panel/circuit labeled
See the full Akron inspection guide — scheduling & re-inspection fees →
Tips
- Do not apply to the Town of Akron for an EV charger permit — like all electrical work in Akron, it is permitted and inspected directly by the Colorado State Electrical Board (DORA/DPO), not the Town.
- After obtaining the state electrical permit, record the resulting permit number on the Town's Building Permit Application form (field: 'STATE ELECTRIC PERMIT #') so the Town has it on file.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Akron building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Akron
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Akron project checklist
Describe your project once and get every permit, document, and fee it triggers in Akron — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →