Solar Photovoltaic (PV) Permit in Akron, Colorado
Required for installation of rooftop solar photovoltaic systems in the Town of Akron. The structural/building portion is permitted by the Town (valuation-based Building Permit), while the electrical/interconnection portion is permitted directly by the Colorado State Electrical Board (DORA), since Akron's Town Code has no local electrical chapter. As with all Colorado jurisdictions, the aggregate permit fee is capped by state law at $500 for a residential system and $1,000 for a commercial system (C.R.S. § 24-48.5-113, enacted by HB21-1284).
Verified 2026-07-23 · Source
When you need this permit
- Town Building Permit required for the structural/racking portion, with a Plot Plan showing panel/array location
- Manufacturer Installation Directions must be submitted with the Town building permit application
- Before installation, the local electric utility, Y-W Electric, requires a Pre-Application Interconnection Data Form
- Colorado State Electrical (Photovoltaic) permit required from the State Electrical Board (DORA) for the wiring/interconnection portion, since Akron has no local electrical program — obtainable online by a homeowner, licensed electrical contractor, or PV installer
- Solar electrical plan review may be completed via SolarApp+ or Symbium per DORA's submittal guidelines for Alternative Energy systems
- By statute (C.R.S. § 24-48.5-113 / HB21-1284), the aggregate of all permit fees and charges imposed by any Colorado governmental body (town + state) for an active solar energy system installation is capped at $500 residential / $1,000 commercial, with charges above that floor limited to actual cost or a 5% annual increase toward the cap
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Town Building/Structural Inspection
Racking attachment, roof penetration sealing verified by the Town's Building Inspector
- 2
State Electrical Rough Inspection
Wiring and panel installed before concealment; scheduled and performed by the State Electrical Board's inspector for the Akron/Washington County area
- 3
State Electrical Final Inspection
Devices installed, panel labeled, system energized; required for permanent power release
See the full Akron inspection guide — scheduling & re-inspection fees →
Tips
- Two separate permits are required for solar in Akron: a Town building permit for the structural/racking work, and a Colorado State Electrical Board permit for the wiring — Akron itself does not issue electrical permits.
- By Colorado statute, the combined total of every governmental fee charged for a solar installation (Town + State) cannot exceed $500 for residential or $1,000 for commercial systems, regardless of how the individual Town and State fees are itemized.
- Contact Y-W Electric before installation for their required Pre-Application Interconnection Data Form — this is a utility interconnection step separate from both the Town and State permits.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Akron building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Akron
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Akron project checklist
Describe your project once and get every permit, document, and fee it triggers in Akron — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →