Solar Photovoltaic (PV) Permit in Akron, Colorado
Required for installation of rooftop solar photovoltaic systems in the Town of Akron. The structural/building portion is permitted by the Town (valuation-based Building Permit), while the electrical/interconnection portion is permitted directly by the Colorado State Electrical Board (DORA), since Akron's Town Code has no local electrical chapter. As with all Colorado jurisdictions, the aggregate permit fee is capped by state law at $500 for a residential system and $1,000 for a commercial system (C.R.S. § 24-48.5-113, enacted by HB21-1284).
Verified 2026-07-23 · Source
When you need this permit
- Town Building Permit required for the structural/racking portion, with a Plot Plan showing panel/array location
- Manufacturer Installation Directions must be submitted with the Town building permit application
- Before installation, the local electric utility, Y-W Electric, requires a Pre-Application Interconnection Data Form
- Colorado State Electrical (Photovoltaic) permit required from the State Electrical Board (DORA) for the wiring/interconnection portion, since Akron has no local electrical program — obtainable online by a homeowner, licensed electrical contractor, or PV installer
- Solar electrical plan review may be completed via SolarApp+ or Symbium per DORA's submittal guidelines for Alternative Energy systems
- By statute (C.R.S. § 24-48.5-113 / HB21-1284), the aggregate of all permit fees and charges imposed by any Colorado governmental body (town + state) for an active solar energy system installation is capped at $500 residential / $1,000 commercial, with charges above that floor limited to actual cost or a 5% annual increase toward the cap
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
C.R.S. § 24-48.5-113(1)(a)(I), as codified in the 2025 CRS edition (law.justia.com/codes/colorado/title-24/other-agencies/article-48-5/part-1/section-24-48-5-113/): 'the aggregate of all charges or… Show full citationHide
C.R.S. § 24-48.5-113(1)(a)(I), as codified in the 2025 CRS edition (law.justia.com/codes/colorado/title-24/other-agencies/article-48-5/part-1/section-24-48-5-113/): 'the aggregate of all charges or other related or associated fees the state or any agency, institution, authority, or political subdivision of the state may impose... shall not exceed: The lesser of the actual costs in issuing the permit or reviewing the application or five hundred dollars for a residential application or one thousand dollars for a nonresidential application' (for systems under 2 MW). Legislative history per the statute's own History note: originally enacted 2011 as HB11-1199 ('Fair Permit Act'); amended 2017 by SB17-179; the entire section was amended in 2021 by HB21-1284, which set the current $500 and $1,000 figures; technical amendment 2022 by SB22-118. Repealed effective 12/31/2029 (C.R.S. § 24-48.5-113(2)). A DORA FAQ page cites '$500/$2,000' under 'HB99-1199' - no such bill exists (the 2011 originating bill is HB11-1199), and the codified statute reads $1,000, not $2,000, for nonresidential systems under 2 MW. Price against the statute's own text.C.R.S. § 24-48.5-113(1)(a)(I), same verification as the residential cap above. Show full citationHide
C.R.S. § 24-48.5-113(1)(a)(I), same verification as the residential cap above. Note: for nonresidential systems producing 2 MW or more of direct-current electricity (or an equivalent-sized thermal system), the cap does not apply — the governmental body may recover its full actual permitting costs instead (C.R.S. § 24-48.5-113(1)(a)(II) and (1)(d)).Review timeline
Inspection process
- 1
Town Building/Structural Inspection
Racking attachment, roof penetration sealing verified by the Town's Building Inspector
- 2
State Electrical Rough Inspection
Wiring and panel installed before concealment; scheduled and performed by the State Electrical Board's inspector for the Akron/Washington County area
- 3
State Electrical Final Inspection
Devices installed, panel labeled, system energized; required for permanent power release
See the full Akron inspection guide — scheduling & re-inspection fees →
Tips
- Two separate permits are required for solar in Akron: a Town building permit for the structural/racking work, and a Colorado State Electrical Board permit for the wiring — Akron itself does not issue electrical permits.
- By Colorado statute, the combined total of every governmental fee charged for a solar installation (Town + State) cannot exceed $500 for residential or $1,000 for commercial systems, regardless of how the individual Town and State fees are itemized.
- Contact Y-W Electric before installation for their required Pre-Application Interconnection Data Form — this is a utility interconnection step separate from both the Town and State permits.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Akron building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Akron's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Akron yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Akron lands. Privacy.
Other permits in Akron
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Akron project checklist
Describe your project once and get every permit, document, and fee it triggers in Akron — in one checklist. Free, for any city and any number of projects.
Get started →