Solar Photovoltaic (PV) Permit — Avon, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://avon.org/DocumentCenter/View/24107/Common-Building-Permit-Types
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar Photovoltaic (PV) Permit in Avon, Colorado
Required for installing a photovoltaic system on a home's roof in the Town of Avon, per the Town's own permit-types guide. Requires a Town building permit AND a fire department permit/final inspection (Eagle River Fire Protection District) AND a separate electrical permit/final inspection through DORA (state) — three distinct authorities for one project.
Verified 2026-07-06 · Source
When you need this permit
- Requires a Town of Avon building permit for the PV installation itself
- Requires a separate permit and final inspection through the fire department (Eagle River Fire Protection District)
- Requires a separate electrical permit and final inspection through the Colorado Department of Regulatory Agencies (DORA) — NOT the Town
- Flat Solar PV Fee applies at the Town level (distinct from the general valuation-based Building Permit Fee table used for other permit types)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Town Building/Roof-Mount Inspection
Racking and roof-penetration compliance verified by the Town
- 2
Fire Department Final (ERFPD)
Solar electrical PV final inspection required by the Eagle River Fire Protection District
- 3
DORA Electrical Final
Separate final electrical inspection required through the Colorado Department of Regulatory Agencies
See the full Avon inspection guide — scheduling & re-inspection fees →
Tips
- A solar PV project in Avon needs sign-off from THREE separate authorities: the Town (building permit, flat $500 residential / $1,000 commercial fee), the Eagle River Fire Protection District (fire permit and final inspection), and DORA (electrical permit and final inspection) — plan for three separate applications and inspections, not one.
- The Solar PV Fee is a flat fee, unlike most other Avon Building Division permit types which use the valuation-based table — don't apply the general Building Permit Fee schedule to a solar scope.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Avon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Avon
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Colorado →