Skip to main content
PermitBase

Replacement / New Roof Permit in Avon, Colorado

Required anytime a roof is repaired or replaced in the Town of Avon, per the Town's own permit-types guide. May require Planning Division review depending on the extent of work. Reviewed under the 2021 IRC/IBC as adopted, with the Town's snow-load design criteria applicable to structural roof work.

Verified 2026-07-06 · Source

When you need this permit

  • Required anytime you are repairing or replacing your roof
  • May need to go through Planning Division review depending on the extent of work being done
  • Structural roof work should account for the Town's Minimum Roof Snow Load design criteria: 90 psf above 8,200 ft elevation, 75 psf below

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based, same schedule as new construction)No separate flat re-roof fee is published; billed under the general valuation-based Building Permit Fee schedule
$50.00 minimum, scaling per the valuation tiers in the Community Development Fee Schedule (Exhibit A to Resolution 24-11)
Building Plan Review FeeNon-refundable regardless of outcome
65% of Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your Replacement / New Roof Permit permit actually take in Avon?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection (roof)

    Completed roof — material, underlayment, and flashing/valley compliance verified

See the full Avon inspection guide — scheduling & re-inspection fees →

Tips

  • Unlike Vail (same county), Avon does not publish an 'Expedited Permit' fast-track specifically for re-roofs — do not assume Avon matches Vail's combined DRB+Building-Permit re-roof process.
  • Confirm with the Planning Division whether your specific re-roof scope (e.g., a material or color change visible from the exterior) triggers Development Plan review before assuming a roofing permit alone is sufficient.

Frequently asked questions

Avon requires a replacement / new roof permit for: Required anytime you are repairing or replacing your roof; May need to go through Planning Division review depending on the extent of work being done; Structural roof work should account for the Town's Minimum Roof Snow Load design criteria: 90 psf above 8,200 ft elevation, 75 psf below. If your project isn't listed, confirm with Town of Avon Community Development Department, Building Division at 970-748-4030 before starting work.

In Avon, the published Building Permit Fee (valuation-based, same schedule as new construction) is: $50.00 minimum, scaling per the valuation tiers in the Community Development Fee Schedule (Exhibit A to Resolution 24-11). Additional published fees: Building Plan Review Fee — 65% of Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Avon does not publish a plan-review timeline for this permit. Contact Town of Avon Community Development Department, Building Division at 970-748-4030 for current turnaround.

You'll need: Building/Roofing Permit Application (Cloudpermit). See the required-documents checklist on this page for details on each.

Avon requires 1 inspection(s) for a replacement / new roof permit, in order: Final Inspection (roof). Schedule each through Town of Avon Community Development Department, Building Division (970-748-4030).

Apply through Town of Avon Community Development Department, Building Division at 100 Mikaela Way, P.O. Box 975, Avon, CO 81620. Phone: 970-748-4030, email: eblock@avon.org. Office hours: 8:00 a.m. - 5:00 p.m., Monday - Friday. Building Official Derek Place: dplace@avon.org, 970-748-4011. Building Inspector Matt Waldrop: mwaldrop@avon.org, 970-748-4098. Community Development Coordinator Emily Block: eblock@avon.org, 970-748-4012. Main Town line: 970-748-4000.. Official information: https://www.avon.org/151/Building.

Avon, Colorado has adopted: 2021 International Building Code (IBC) — Town of Avon Adopted Building Codes page; 2021 International Residential Code (IRC); 2021 International Energy Conservation Code (IECC); 2021 International Plumbing Code (IPC); 2021 International Fuel Gas Code (IFGC); 2021 International Mechanical Code (IMC); 2021 International Fire Code (IFC), with additions and exceptions per the Eagle River Fire Protection District (ERFPD); 2021 International Swimming Pool and Spa Code; 2021 International Property Maintenance Code; 2021 International Wildland-Urban Interface Code; 2023 National Electrical Code (NEC) — administered by the Colorado Department of Regulatory Agencies (DORA), not the Town, per the Town's own 'Common Building Permit Types' document; ICC A117.1-2017 Standard for Accessible and Usable Buildings and Facilities; Note on code currency: Avon's adopted-codes list (2021 I-Codes cycle) is one cycle behind Vail's currently posted 2024 I-Codes list within the same county — confirmed directly against the Town's own Adopted Building Codes page as of this review; do not assume parity with Vail's code edition.. Local amendments apply — see the Avon overview page for the full list.

Not always — the Town's guide states a roofing permit 'may need to go through planning review depending on the extent of work being done,' so it is scope-dependent rather than a blanket requirement.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Avon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.