Roofing Permit (Re-Roof) — Breckenridge, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.townofbreckenridge.com/home/showpublisheddocument/27033/639082955105870000
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Roofing Permit (Re-Roof) in Breckenridge, Colorado
Required for re-roofing work in Breckenridge. Governed by the 2025 Colorado Wildfire Resiliency Code Class A roofing requirements (applied town-wide, not just in a mapped WUI zone) plus IRC/IBC underlayment, valley-flashing, and ventilation standards, per the Town's own Re-Roof Requirements bulletin.
Verified 2026-07-06 · Source
When you need this permit
- All roof coverings on new construction, additions, and re-roofs must be Class A, tested per ASTM E108 or UL 790 (CWRC Section 403.2 / 1505.1/R902.1)
- If more than 25% of existing roof surface area is affected by reconstruction/replacement/alteration/repair, the work must meet the new-construction roof-covering standard (CWRC Section 101.6/403.2)
- Roofs must be designed with snow-shed barriers to prevent snow from shedding onto balconies, decks, exits, stairways, sidewalks, streets, utility meters, or adjacent properties (Town Code 8-1-4, IBC 1503.6/IRC R903.1.1), except for roof areas with 48 inches or less horizontal dimension that won't shed onto a lower roof
- Flame/ember protection required at any gap between roof covering profile and roof deck (firestopping, cap sheet per ASTM D3909, or listed Class A assembly) — CWRC 403.2.1
- Valley flashings: minimum 0.019-inch (No. 26 galvanized) corrosion-resistant metal over a minimum 36-inch-wide underlayment of ASTM D3909 cap sheet running the full valley length — CWRC 403.2.2
- Gutters and downspouts must be noncombustible material — CWRC 403.3
- Ventilation openings for attics/rafter spaces/underfloor spaces must meet CWRC 403.4 performance (ASTM E2886 tested vents) or prescriptive (noncombustible corrosion-resistant mesh) requirements
- Roof underlayment (self-adhering polymer-modified bitumen or equivalent, building-official approved) required under all roof coverings, extending from eave to ridge and covering the full deck; new construction requires the underlayment to extend a minimum of 30 inches up adjacent walls (IBC 1507.1.1/IRC R905.1.1)
- Certain commercial/residential roofing types (EPDM, TPO, built-up, nail-fin, cold roof) may require third-party or manufacturer certification — verify with the Building Department
- Minimum of two inspections typical: Underlayment and Flashing Inspection, and Final Building Inspection; ladder/access arrangements must be coordinated with the inspector in advance
- The Building Division may use drone aerial photography for roofing inspections, determined case-by-case
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Underlayment and Flashing Inspection
Underlayment, valley flashing, and ventilation openings verified before roof covering installation is completed
- 2
Final Building Inspection
Completed roof — Class A covering, snow-shed design, and all CWRC compliance items verified; drone aerial photography may be used
See the full Breckenridge inspection guide — scheduling & re-inspection fees →
Tips
- Breckenridge requires Class A roof covering on every re-roof town-wide — this is a Colorado Wildfire Resiliency Code requirement that applies regardless of whether the parcel sits in a mapped wildfire hazard zone, unlike jurisdictions that only impose Class A roofing inside a WUI overlay.
- If your re-roof project affects more than 25% of the existing roof surface, code treats it as new-construction-grade work — budget for full CWRC compliance, not a like-for-like patch.
- Coordinate ladder/roof access with the inspector ahead of time; the Building Division may also fly a drone for the final inspection, so leave the roof accessible and complete (painted vent penetrations, debris cleared) before requesting it.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Breckenridge building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Breckenridge
Roofing Permit (Re-Roof) in other cities
Compare roofing permit (re-roof) fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Breckenridge project checklist
Describe your project once and get every permit, document, and fee it triggers in Breckenridge — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →