Roofing Permit (Re-Roof) in Aspen, Colorado

Required for all re-roofing projects in Aspen (patching less than one square, 10'x10', does not require a permit). Governed by the Roof Assembly sections of the currently adopted codes; roof work involving changes to height, slope, footprint, structural framing, or insulation requires a full building permit instead of a roofing permit. Ground snow load design criterion is 100 psf.

Verified 2026-07-23 · Source

When you need this permit

  • All re-roofing projects require a Roofing Permit; roof work changing height, slope, footprint, structural framing, or cavity insulation requires a Building Permit instead
  • Patching less than 1 square (10 ft x 10 ft) does not require any permit
  • UL or ICC-ES report required for the listed Class A roof assembly specific to the roofing product and installation (per Ordinance 1, 2023)
  • Ground snow load of 100 psf: if adding insulation above the roof deck and the building was not constructed to this snow load, a Letter of Structural Integrity from a Structural Engineer is required
  • If insulation is present above the roof deck, required minimum values are R-40 above deck (Commercial) or R-49 above deck (Residential), or an alternate design approved by the Building Department for justified infeasibility
  • Snowguards/stops required on roofs that shed onto neighboring properties or occupied areas (walkways, stairways, alleys, decks, pedestrian/vehicular exits, or areas above gas/electric utility meters)
  • If heat tape is installed (new or existing) exceeding 1,000 watts, REMP fees apply, and a sub-electrical permit is required for any roof with heat tape
  • If the address is on the City's Inventory of Historic Sites and Structures or within a Historic District, HPC Approval is required before the roofing permit
  • Two photographs of existing conditions required (one showing the overall structure, one close-up of the existing roof)
  • An asbestos test is NOT required if all materials to be removed are asphaltic/tar-impregnated/non-friable, removed by hand (no circular saws), and disposed of rather than recycled — all three conditions must be met

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Roofing / Re-Roof Permit FeePer the Roofing and Re-roofing Memorandum of Policy (Nov. 12, 2018); no static percentage table published as plain text
Established in the currently adopted Building Department fee schedule; computed via the Roofing Fee Calculator (Excel), a separate tool from the general Building Permit Fee Estimator

Review timeline

Plan reviewAspen’s published plan-review target
7–14 business days

How long did your Roofing Permit (Re-Roof) permit actually take in Aspen?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Mid-Roof Inspection

    Required for all roofing permits and for building permits when a new roof is installed, per the Roofing and Re-roofing Memorandum of Policy

  2. 2

    Final Inspection

    Completed roof — Class A material, flashing, ice/water barrier, and snowguard compliance verified

See the full Aspen inspection guide — scheduling & re-inspection fees →

Tips

  • Aspen's 100 psf ground snow load is a serious design constraint for re-roofs adding insulation — if your building wasn't built to that load, you need a Structural Engineer's Letter of Structural Integrity before proceeding.
  • Check the three asbestos-exemption conditions carefully (asphaltic/non-friable materials, hand removal only, disposal not recycling) — if you can't satisfy all three, a full asbestos test is required, adding time and cost.
  • Any roof with heat tape needs a sub-electrical permit in addition to the roofing permit, and heat tape over 1,000 watts triggers REMP fees and control requirements (automatic shutoff above 40°F plus a moisture/daylight sensor or timer).

Frequently asked questions

No. Patching less than one square (10 feet by 10 feet) does not require a permit. Any re-roofing beyond that scope requires a Roofing Permit, and any roof work changing height, slope, footprint, structural framing, or insulation requires a full Building Permit instead.

In Aspen, the published Roofing / Re-Roof Permit Fee is: Established in the currently adopted Building Department fee schedule; computed via the Roofing Fee Calculator (Excel), a separate tool from the general Building Permit Fee Estimator. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Aspen's published plan-review target for a roofing permit (re-roof) is 7–14 business days.

You'll need: Roof/Re-Roof Application Checklist; Permit Application Signatures Packet; Construction Management Plan (CMP). See the required-documents checklist on this page for details on each.

Aspen requires 2 inspection(s) for a roofing permit (re-roof), in order: Mid-Roof Inspection, Final Inspection. Schedule each through City of Aspen Community Development Department, Building Division (970-920-5000).

Apply through City of Aspen Community Development Department, Building Division at 427 Rio Grande Place, Aspen, CO 81611. Phone: 970-920-5000, email: buildingsupport@aspen.gov. Office hours: City of Aspen main line 970-920-5000. Building Support (permit requirement inquiries, pre-submittal questions): buildingsupport@aspen.gov, Monday-Friday 9:00am-5:00pm. Builder of the Day (building code/regulations questions): builderoftheday@aspen.gov, 970-429-2735, Monday-Friday 8:30am-4:30pm. Planner of the Day (zoning, floor area, net leasable, signage, mountain view plane, exterior design): planneroftheday@aspen.gov, 970-429-2764, walk-in hours Monday-Friday 9:00am-12:00pm. Historic Preservation: HP@aspen.gov, 970-429-2758. Construction hours: Monday-Friday 7:30am-5:30pm, Saturday 9:00am-5:00pm, no construction on Sundays.. Official information: https://aspen.gov/179/Building.

Aspen, Colorado has adopted: 2021 International Building Code (IBC) — adopted by Ordinance #1, 2023 (January 24, 2023), effective for permits submitted March 31, 2023 and later; the IRC has NOT been adopted by the City of Aspen and is not applied — single-family, duplex, and townhouse projects are reviewed under the 2021 IBC as locally amended, per the City's own 'Building Permit Application Checklist for Singlefamily, Duplex, and Townhouse Projects (2021 IBC)'; 2021 International Existing Building Code (IEBC); 2021 International Mechanical Code (IMC); 2021 International Fuel Gas Code (IFGC); 2021 International Plumbing Code (IPC); 2021 International Fire Code (IFC); 2021 International Swimming Pool and Spa Code (ISPSC); 2021 Aspen Energy Code (local amendment/supplement to the IECC); 2023 National Electrical Code (NEC), effective August 1, 2023; 2024 Colorado Wildfire Resiliency Code with local amendments — adopted by Ordinance 6, 2026 (March 25, 2026), effective April 23, 2026; referenced directly in the current Fence Permit Application Checklist (fences within 8 feet of a structure must be noncombustible/ignition-resistant; hedges within 5 feet must use ignition-resistant vegetation); Prior code cycle: 2015-edition IBC/IEBC/IMC/IFGC/IPC/IFC applied to permits submitted between February 2017 and March 2023, with local amendments in Ordinance 40, 2016 (superseded, listed for reference only); Local amendments to all adopted codes are codified in Title 8 (Building and Building Regulations) of the Aspen Municipal Code; Municode's Aspen library is a JavaScript-rendered application that could not be scraped directly in this or the prior session (confirmed again 2026-07-23: raw curl returns only the Angular SPA shell, and the shared browser environment used for the re-chase attempt this session was too unstable to reliably render deep-linked Title pages). However, the City's own 'Currently Adopted Building & Energy Codes' page (aspen.gov/197) directly publishes a 'Climate & Geographical Design Criteria' table (2026-07-23, live-confirmed): Ground snow load 100 psf; Wind Speed/Exposure Category 89 mph / B; Seismic Design Category C; Weathering Severe; Frost line depth 36 inches; Termite None to slight; Decay None to slight; Winter design temp -15°F; Summer design temp 82°F; Ice shield underlayment required Yes; Air Freezing Index 2000; Mean annual temperature 40°F. This resolves the design-criteria gap without needing Title 8/Municode.. Local amendments apply — see the Aspen overview page for the full list.

100 psf, per the City's published Roof/Re-Roof Application Checklist. If a re-roof adds insulation and the building was not originally constructed to this snow load, a Structural Engineer's Letter of Structural Integrity is required.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Aspen building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.