Aspen building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Aspen, Colorado.
Verified 2026-07-23 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 427 Rio Grande Place, Aspen, CO 81611
- Phone
- 970-920-5000
- Office hours
- City of Aspen main line 970-920-5000. Building Support (permit requirement inquiries, pre-submittal questions): buildingsupport@aspen.gov, Monday-Friday 9:00am-5:00pm. Builder of the Day (building code/regulations questions): builderoftheday@aspen.gov, 970-429-2735, Monday-Friday 8:30am-4:30pm. Planner of the Day (zoning, floor area, net leasable, signage, mountain view plane, exterior design): planneroftheday@aspen.gov, 970-429-2764, walk-in hours Monday-Friday 9:00am-12:00pm. Historic Preservation: HP@aspen.gov, 970-429-2758. Construction hours: Monday-Friday 7:30am-5:30pm, Saturday 9:00am-5:00pm, no construction on Sundays.
- Website
- Official site
Inspection sequence
Applies to: Residential Addition / Alteration-Remodel Permit
- 1
Foundation (additions with new footings only)
Footings and foundation before concrete pour
- 2
Rough Frame
Framing complete, connection to existing structure verified
- 3
Rough Electrical / Plumbing / Mechanical
Conduit runs, wiring, piping, and ductwork before concealment
- 4
Final Inspection
All work complete per approved plans and applicable codes
Applies to: Residential Building Permit (New Construction, Single-Family/Duplex/Townhouse)
- 1
Foundation
Before concrete pour
- 2
Framing
Structural framing complete before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans and applicable codes
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring and panel installed before concealment
- 2
Final Inspection
Devices installed, panel labeled, system energized and verified
Applies to: EV Charger / EVSE Permit
- 1
Rough Electrical
Wiring and circuit installed before concealment
- 2
Final Inspection
Charger installed, circuit verified, unit energized
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, and equipment placement before concealment
- 2
Final Inspection
Equipment operational, combustion air and venting verified
Applies to: Plumbing Permit
- 1
Rough Plumbing
Pipe, drain, waste, and vent installation before concealment
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
Applies to: Roofing Permit (Re-Roof)
- 1
Mid-Roof Inspection
Required for all roofing permits and for building permits when a new roof is installed, per the Roofing and Re-roofing Memorandum of Policy
- 2
Final Inspection
Completed roof — Class A material, flashing, ice/water barrier, and snowguard compliance verified
Applies to: Solar Photovoltaic (PV) System Permit
- 1
Rough-In Inspection
Before any concealment of wire ways; underground wiring and grounding system installed; for roof-mounted installations, mounting hardware inspected before module installation
- 2
Final Inspection
All AC/DC equipment complete and ready to energize; system operation field-inspected
Final inspection only: Demolition Permit, Fence Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Aspen building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Aspen building permits
Get alerts for Aspen
We'll email you when Aspen's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.