Residential Building Permit (New Construction) in Breckenridge, Colorado

Required for new single-family homes, duplexes, and townhouses within Breckenridge Town Limits. Reviewed under the 2024 IRC/IBC as locally amended (Town Code 8-1-4/8-1-5), the Town's mountain-specific structural design criteria (90/100 psf snow load, 40-inch frost depth), and the 2025 Colorado Wildfire Resiliency Code, which applies town-wide rather than to a mapped WUI overlay.

Verified 2026-07-06 · Source

When you need this permit

  • Plans must be stamped by a Colorado Licensed Design Professional (architect or structural engineer) and include a construction management plan
  • Must meet Breckenridge's structural design criteria: 90 psf roof snow load below 10,000 ft elevation / 100 psf at or above 10,000 ft, no reduction for pitch or duration, no ground snow load or ground-snow-load reduction; 40-inch minimum frost depth for foundations (or ASCE 32 design); frost reports required for concrete placement Nov 1-May 1 or during any freeze window
  • Must comply with the 2025 Colorado Wildfire Resiliency Code: defensible-space site plan (Structure Ignition Zones 1-3), Class 1/2 structure hardening materials, Class A roof covering, noncombustible/Class A (or Class B composite) deck walking surfaces
  • Complete the Permit Submittal Checklist plus either the 2024 Energy Code Prescriptive Submittal Guidelines OR the 2024 IECC Residential ERI Submittal Checklist
  • Completed sign-off (or exemption self-affidavit where applicable) from Upper Blue Sanitation District and from Red, White & Blue Fire District
  • Approved Development Permit from the Planning Division prior to submittal (Plan Case Number required in the application)
  • A soils/geotechnical report for the building site
  • Fire sprinkler system (NFPA 13/13R/13D/P2904) required if Fire Area exceeds 4,500 sq ft
  • REMP Checklist and Calculator required if the project includes fossil-fuel-consuming outdoor amenities
  • Separate sub-permits (plumbing, electrical, mechanical) required; plumbing/electrical work must be performed by Colorado state-licensed trades Contractor
  • All permit applications accepted only via the Town's online Access Portal; partial/incomplete applications are not accepted

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 6 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — valuation $1.00 to $500.00Building, Mechanical & Plumbing Fee Schedule, effective September 27, 2022 — Town of Breckenridge Building Department Fee Schedules page
$50.00
Building Permit Fee — valuation $501.00 to $2,000.00
$50.00 for the first $500 plus $1.25 for each additional $100 or fraction thereof, up to and including $2,000
Building Permit Fee — valuation $2,001.00 to $25,000.00
$69.25 for the first $2,000, plus $14.00 for each additional $1,000 or fraction thereof, to and including $25,000
Building Permit Fee — valuation $25,001.00 to $50,000.00
$391.25 for the first $25,000, plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000
Building Permit Fee — valuation $50,001.00 to $100,000.00
$643.75 for the first $50,000, plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000
Building Permit Fee — valuation $100,001.00 to $500,000.00
$1,169.55 for the first $100,000, plus $6.73 for each additional $1,000 or fraction thereof, up to and including $500,000
Building Permit Fee — valuation $500,001.00 to $1,000,000.00
$3,663.00 for the first $500,000, plus $5.34 for each additional $1,000 or fraction thereof, up to and including $1,000,000
Building Permit Fee — valuation $1,000,001.00 and up
$6,332.22 for the first $1,000,000, plus $3.90 for each additional $1,000 or fraction thereof
Plan Review FeeAll Building, Mechanical, and Plumbing permits carry a 65% plan review fee in addition to the base permit fee
65% of the Building Permit Fee
Work commenced before permit issuanceTown Code Section 8-1-4 fee schedule
3x the calculated permit fee

Review timeline

Plan review
Not published — contact the department

How long did your Residential Building Permit (New Construction) permit actually take in Breckenridge?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Before concrete pour, per 40-inch minimum frost depth (or ASCE 32 design); frost report required if poured Nov 1-May 1 or during a freeze window

  2. 2

    Rough Frame

    Framing complete before cover

  3. 3

    Rough Plumbing / Rough Electrical / Rough Mechanical

    Trade rough-ins before concealment; separate sub-permits required

  4. 4

    Final Building Inspection

    Requires prior sign-off from Finance (if valuation over $100K), Upper Blue Sanitation District, Red White & Blue Fire, and Planning/Engineering/Water/Streets as applicable; certificate of occupancy issued via email upon passing

See the full Breckenridge inspection guide — scheduling & re-inspection fees →

Tips

  • Breckenridge's snow load rule is stricter than many Front Range jurisdictions: 90 psf below 10,000 ft / 100 psf at or above, with NO pitch or duration reduction and NO ground-snow-load credit — confirm your structural engineer is designing to this specific Town Code amendment, not a generic county or statewide table.
  • The Colorado Wildfire Resiliency Code applies to every project in Breckenridge, not just parcels inside a mapped WUI boundary — unlike some peer jurisdictions that only trigger wildfire-code compliance inside a designated hazard map.
  • Red, White & Blue Fire District and Upper Blue Sanitation District are separate entities from the Town with their own permits/inspections/sign-offs — budget separate timelines and fees for their review in addition to the Town's building permit.
  • The Town explicitly declines to publish a numeric review-time SLA and directs applicants to call for current estimates — build in schedule buffer and confirm status proactively rather than assuming a fixed timeline.
  • REMP compliance (checklist + calculator) is required for ANY permit proposing outdoor fossil-fuel amenities, even if the project ultimately qualifies for an exemption — don't skip the paperwork just because you expect to be exempt.

Frequently asked questions

Breckenridge requires a residential building permit (new construction) for: Plans must be stamped by a Colorado Licensed Design Professional (architect or structural engineer) and include a construction management plan; Must meet Breckenridge's structural design criteria: 90 psf roof snow load below 10,000 ft elevation / 100 psf at or above 10,000 ft, no reduction for pitch or duration, no ground snow load or ground-snow-load reduction; 40-inch minimum frost depth for foundations (or ASCE 32 design); frost reports required for concrete placement Nov 1-May 1 or during any freeze window; Must comply with the 2025 Colorado Wildfire Resiliency Code: defensible-space site plan (Structure Ignition Zones 1-3), Class 1/2 structure hardening materials, Class A roof covering, noncombustible/Class A (or Class B composite) deck walking surfaces; Complete the Permit Submittal Checklist plus either the 2024 Energy Code Prescriptive Submittal Guidelines OR the 2024 IECC Residential ERI Submittal Checklist; Completed sign-off (or exemption self-affidavit where applicable) from Upper Blue Sanitation District and from Red, White & Blue Fire District; Approved Development Permit from the Planning Division prior to submittal (Plan Case Number required in the application); A soils/geotechnical report for the building site; Fire sprinkler system (NFPA 13/13R/13D/P2904) required if Fire Area exceeds 4,500 sq ft; REMP Checklist and Calculator required if the project includes fossil-fuel-consuming outdoor amenities; Separate sub-permits (plumbing, electrical, mechanical) required; plumbing/electrical work must be performed by Colorado state-licensed trades; All permit applications accepted only via the Town's online Access Portal; partial/incomplete applications are not accepted. If your project isn't listed, confirm with Town of Breckenridge Community Development Department — Building Division at (970) 453-3180 before starting work.

In Breckenridge, the published Building Permit Fee — valuation $1.00 to $500.00 is: $50.00. Additional published fees: Building Permit Fee — valuation $501.00 to $2,000.00 — $50.00 for the first $500 plus $1.25 for each additional $100 or fraction thereof, up to and including $2,000; Building Permit Fee — valuation $2,001.00 to $25,000.00 — $69.25 for the first $2,000, plus $14.00 for each additional $1,000 or fraction thereof, to and including $25,000; Building Permit Fee — valuation $25,001.00 to $50,000.00 — $391.25 for the first $25,000, plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000; Building Permit Fee — valuation $50,001.00 to $100,000.00 — $643.75 for the first $50,000, plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000; Building Permit Fee — valuation $100,001.00 to $500,000.00 — $1,169.55 for the first $100,000, plus $6.73 for each additional $1,000 or fraction thereof, up to and including $500,000; Building Permit Fee — valuation $500,001.00 to $1,000,000.00 — $3,663.00 for the first $500,000, plus $5.34 for each additional $1,000 or fraction thereof, up to and including $1,000,000; Building Permit Fee — valuation $1,000,001.00 and up — $6,332.22 for the first $1,000,000, plus $3.90 for each additional $1,000 or fraction thereof; Plan Review Fee — 65% of the Building Permit Fee; Work commenced before permit issuance — 3x the calculated permit fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

The Town does not publish a numeric review-time SLA. Its own construction-information bulletins state review time 'varies based on current workloads and the completeness of the application' and that 'all review times are estimates only' — applicants are directed to contact the Building Department directly for current estimates.

You'll need: Building Permit Application (Access Portal); Construction Drawings (stamped); Permit Submittal Checklist; Soils/Geotechnical Report; Upper Blue Sanitation District sign-off; Red, White & Blue Fire District sign-off. See the required-documents checklist on this page for details on each.

Breckenridge requires 4 inspection(s) for a residential building permit (new construction), in order: Foundation, Rough Frame, Rough Plumbing / Rough Electrical / Rough Mechanical, Final Building Inspection. Schedule each through Town of Breckenridge Community Development Department — Building Division ((970) 453-3180).

Apply through Town of Breckenridge Community Development Department — Building Division at 150 Ski Hill Road, 2nd Floor, PO Box 168, Breckenridge, CO 80424. Phone: (970) 453-3180, email: building@townofbreckenridge.com. Office hours: Monday-Thursday 8:00am-5:00pm, Friday 8:00am-12:00pm; closed major holidays. Official information: https://www.townofbreckenridge.com/departments/community-development/building.

The Town of Breckenridge Community Development Department's Building Division issues its own building, electrical, mechanical, and plumbing permits for all work within Town Limits — Summit County's Building Inspection Division has no jurisdiction inside Breckenridge. Verify jurisdiction using the Summit County address search tool before applying.

90 psf for roofs below 10,000 feet elevation, and 100 psf for roofs at or above 10,000 feet, per Town Code 8-1-4 (amending IBC Section 1608.2). There is no reduction for roof pitch or load duration, and ground snow load is not used.