Residential Building Permit (New Construction) in Ault, Colorado

Required for new single-family, two-family, and townhome construction in the Town of Ault. Plan review, building official services, and inspections are performed by SAFEbuilt Colorado under contract to the Town, applying the 2024 IRC, 2024 IECC, and 2023 NEC.

Verified 2026-07-06 · Source

When you need this permit

  • Completed building permit application form
  • Electronic plot plan showing property address, north arrow and scale, lot dimensions, all projections (stairs, balconies, decks, cantilevers), legal description/subdivision name, distances in feet from the proposed structure to property lines (N/S/E/W) and to existing structures, description of what surrounds the property, and a seal from a registered design professional
  • One electronic set of: architectural/floor plans; engineered structural plans stamped by a Colorado-licensed engineer; electrical plans (panel locations, receptacles, lighting); mechanical plans (equipment location, duct sizes/locations/terminations); fire protection plans (stamped) if a sprinkler system is part of the design; soils report for the specific property
  • Manual J, D, and S compliance calculations (one electronic copy)
  • 2024 IECC energy code compliance documentation: a completed ResCheck specific to the proposed home, OR an energy compliance report from an energy rating company, with all energy documents consistent with each other
  • EV-ready, Solar-ready, and Electric-ready documentation for new single-family, two-family, and townhome dwellings per the Town's SAFEbuilt-administered checklist (see tips)
  • All plan sheets must bear the original seal of a Colorado-licensed architect or engineer unless exempted under section 12-4-112 C.R.S.

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 5 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — valuation $1.00 to $500.00 (1997 UBC Table 1-A)Exhibit B — Fee Schedule for Services, Town of Ault (last modified 5/19/24)
$23.00
Building Permit Fee — valuation $501.00 to $2,000.00
$23.50 for the first $500 plus $3.05 for each additional $100 or fraction thereof, to and including $2,000.00
Building Permit Fee — valuation $2,001.00 to $25,000.00
$69.25 for the first $2,000 plus $14.00 for each additional $1,000 or fraction thereof, to and including $25,000.00
Building Permit Fee — valuation $25,001.00 to $50,000.00
$391.25 for the first $25,000 plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000.00
Building Permit Fee — valuation $50,001.00 to $100,000.00
$643.75 for the first $50,000 plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000.00
Building Permit Fee — valuation $100,001.00 to $500,000.00
$993.75 for the first $100,000 plus $5.60 for each additional $1,000 or fraction thereof, to and including $500,000.00
Building Permit Fee — valuation $500,001.00 to $1,000,000.00
$3,233.75 for the first $500,000 plus $4.75 for each additional $1,000 or fraction thereof, to and including $1,000,000.00
Building Permit Fee — valuation $1,000,001.00 and up
$5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000 or fraction thereof
Plan Review Fee — One, Two, and Three Family ResidencesExhibit B plan review fee schedule
30% of Building Permit Fee
Reinspection Fee
$75.00
Investigation Fee (work started without a permit)
50% of permit fee
Inspections Outside of Normal Business HoursTime tracked from when the SAFEbuilt consultant checks in at the municipality or first inspection site
$100.00 per hour, one-hour minimum

Review timeline

Plan review
Not published — contact the department

How long did your Residential Building Permit (New Construction) permit actually take in Ault?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Before concrete pour

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans and applicable codes; approved plan set must remain on the job site through final inspection

See the full Ault inspection guide — scheduling & re-inspection fees →

Tips

  • Ault's plan review, building official, and inspection services are performed by SAFEbuilt Colorado under contract to the Town, not by Town staff directly — expect correspondence and inspection scheduling to come from SAFEbuilt.
  • New single-family, two-family, and townhome construction must document EV-ready (40A circuit, outlet within 3 ft of a parking space), Solar-ready (roof solar-zone plan, attic prewire path, truss load verification), and Electric-ready (future full-electric load calculation sized into the service/panel/feeders) provisions — this reflects Colorado's HB22-1362 statewide energy-code floor and is independently confirmed by Ault's own SAFEbuilt checklist, not assumed from the statute alone.
  • All energy compliance documents (ResCheck, energy rating report, or prescriptive IECC documentation) must be internally consistent with each other and with the construction drawings.

Frequently asked questions

Ault requires a residential building permit (new construction) for: Completed building permit application form; Electronic plot plan showing property address, north arrow and scale, lot dimensions, all projections (stairs, balconies, decks, cantilevers), legal description/subdivision name, distances in feet from the proposed structure to property lines (N/S/E/W) and to existing structures, description of what surrounds the property, and a seal from a registered design professional; One electronic set of: architectural/floor plans; engineered structural plans stamped by a Colorado-licensed engineer; electrical plans (panel locations, receptacles, lighting); mechanical plans (equipment location, duct sizes/locations/terminations); fire protection plans (stamped) if a sprinkler system is part of the design; soils report for the specific property; Manual J, D, and S compliance calculations (one electronic copy); 2024 IECC energy code compliance documentation: a completed ResCheck specific to the proposed home, OR an energy compliance report from an energy rating company, with all energy documents consistent with each other; EV-ready, Solar-ready, and Electric-ready documentation for new single-family, two-family, and townhome dwellings per the Town's SAFEbuilt-administered checklist (see tips); All plan sheets must bear the original seal of a Colorado-licensed architect or engineer unless exempted under section 12-4-112 C.R.S.. If your project isn't listed, confirm with Town of Ault (building official, plan review, and inspection services contracted to SAFEbuilt Colorado) at 970-834-2844 before starting work.

In Ault, the published Building Permit Fee — valuation $1.00 to $500.00 (1997 UBC Table 1-A) is: $23.00. Additional published fees: Building Permit Fee — valuation $501.00 to $2,000.00 — $23.50 for the first $500 plus $3.05 for each additional $100 or fraction thereof, to and including $2,000.00; Building Permit Fee — valuation $2,001.00 to $25,000.00 — $69.25 for the first $2,000 plus $14.00 for each additional $1,000 or fraction thereof, to and including $25,000.00; Building Permit Fee — valuation $25,001.00 to $50,000.00 — $391.25 for the first $25,000 plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000.00; Building Permit Fee — valuation $50,001.00 to $100,000.00 — $643.75 for the first $50,000 plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000.00; Building Permit Fee — valuation $100,001.00 to $500,000.00 — $993.75 for the first $100,000 plus $5.60 for each additional $1,000 or fraction thereof, to and including $500,000.00; Building Permit Fee — valuation $500,001.00 to $1,000,000.00 — $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000 or fraction thereof, to and including $1,000,000.00; Building Permit Fee — valuation $1,000,001.00 and up — $5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000 or fraction thereof; Plan Review Fee — One, Two, and Three Family Residences — 30% of Building Permit Fee; Reinspection Fee — $75.00; Investigation Fee (work started without a permit) — 50% of permit fee; Inspections Outside of Normal Business Hours — $100.00 per hour, one-hour minimum. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Ault does not publish a plan-review timeline for this permit. Contact Town of Ault (building official, plan review, and inspection services contracted to SAFEbuilt Colorado) at 970-834-2844 for current turnaround.

You'll need: Building Permit Application; 2026 SAFEbuilt Residential Application Check List; Engineered Structural Plans; Soils Report; 2024 IECC Compliance Documentation. See the required-documents checklist on this page for details on each.

SAFEbuilt Colorado, under a consultant services contract with the Town of Ault, provides building official services, plan review, and inspections. The Town's own Building Permits webpage hosts SAFEbuilt's submittal checklists and fee schedule.

Apply through Town of Ault (building official, plan review, and inspection services contracted to SAFEbuilt Colorado) at 201 1st Street, PO Box 1098, Ault, CO 80610. Phone: 970-834-2844, email: info@aultcolorado.gov. Office hours: Town Hall does not publish specific daily office hours on its Contact Us or Building Permits pages as of this review; the Town's public-works page separately states Public Works operates 7:00 a.m.-4:00 p.m. Monday-Friday (except holidays), and the site-wide holiday-closure banner implies a standard 9:00 a.m. reopening time, but neither is confirmed as the Building Department's specific window. Call 970-834-2844 to confirm hours before visiting in person.. Official information: https://www.aultcolorado.gov/buildingpermits.

The 2026 SAFEbuilt Residential Application Check List states that all submittal information must comply with the 2024 I-codes (IRC/IECC) and the 2023 NEC.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ault building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.