Skip to main content
PermitBase

Commercial Remodel / Tenant Finish Permit in Breckenridge, Colorado

Breckenridge runs commercial tenant improvements as their own application type — 'Commercial Construction – Remodel/Tenant Finish' — for work inside or mainly inside commercial buildings (including mixed-use buildings with commercial below and dwellings above), per the Town's Definitions of Permit Types. The Town publishes a dedicated bulletin, 'Commercial Construction Information: Remodel/Tenant Finish & Additions,' reflecting the retail/restaurant/hospitality turnover of the resort core. Sign-off requirements scale with scope: Red White & Blue Fire District for any commercial remodel, Upper Blue Sanitation District for changes of use (e.g., retail to restaurant), Summit County Environmental Health for food/child-care/body-art uses and commercial pools/spas/hot tubs, and the Town Clerk's office wherever a liquor or marijuana license is present.

Verified 2026-08-02 · Source

When you need this permit

  • Apply under the 'Commercial Construction – Remodel/Tenant Finish' application type via the online Access Portal (also the correct category for shared hot tubs at multi-unit buildings and hot tubs at lodges/resorts/hotels)
  • All submittals require plans: stamped by a Colorado Licensed Structural Engineer if structural work is proposed; if no structural work, plans can be stamped by a Colorado Licensed Architect
  • All commercial remodels must complete the Permit Submittal Checklist
  • Red, White & Blue Fire District sign-off is required for ANY commercial remodel (separate entity with its own permits and inspections)
  • Upper Blue Sanitation District sign-off required for remodels changing bed/bath count, changes of use (e.g., retail to restaurant), and commercial hot tubs, pools, and spas — otherwise upload the UBSD self-affidavit
  • Summit County Environmental Health sign-off required for food establishments, child care facilities, schools, tattoo/body art facilities, and shared or commercial hot tubs, spas, and pools — otherwise upload the self-affidavit
  • Town Clerk's office sign-off required for any commercial remodel or tenant finish where a liquor license or marijuana license is present — otherwise upload the Town Clerk self-affidavit
  • Asbestos test report required if disturbed materials meet State of Colorado trigger levels (self-affidavit otherwise); positive results require abatement by a Colorado certified General Abatement Contractor with a clearance report submitted to the Building Department
  • No Development Permit is needed for interior remodels with no changes to square footage (Planning Division's published exemption), but a change of use outside a residential district is a Class C Minor Development Permit (~3-week consent-calendar process), commercial additions under 1,000 sq ft are Class B Major (~7 weeks), and commercial additions over 1,000 sq ft are Class A (~7 weeks); additions require the approved Development Permit's Plan Case Number before building-permit submittal
  • Exterior changes in the Historic or Conservation District (including even paint color changes in the Conservation District, a Class D Minor permit) trigger Planning review against the Handbook of Design Standards for the Historic and Conservation Districts
  • Separate plumbing, electrical, and mechanical sub-permits referencing the building permit number; trade work only by Colorado state-licensed plumbers/electricians Contractor
  • Projects with valuation over $100,000 require Finance Department approval (Supplier Verification Form) before final building inspection; every contractor and subcontractor needs a Town of Breckenridge Business License
  • Window/exterior-door-only replacements and standalone deck work have their own streamlined application types — but if part of a larger remodel scope, everything goes under the single Remodel/Tenant Finish application

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 8 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (same valuation-based Building, Mechanical & Plumbing Fee Schedule as all building permits)Effective September 27, 2022; re-verified live 2026-08-02. No separate tenant-improvement fee table is published.
$50.00 minimum, scaling per the valuation tiers (e.g., $1,169.55 at $100,000 valuation plus $6.73/$1,000 above)
Plan Review Fee
65% of the Building Permit Fee
Change-of-use / added-square-footage exposurePer the Planning Division's Development Permits page, changes of use and new commercial development can incur employee generation fees, water Plant Investment Fees, and parking fees — contact a Planner (970-453-3160) for preliminary calculations
Varies
Work commenced before permit issuance
3x the calculated permit fee

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Remodel / Tenant Finish Permit permit actually take in Breckenridge?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Frame / Rough Trades

    Structural modifications and plumbing/electrical/mechanical rough-ins (under separate sub-permits) before concealment; scheduled by the general contractor via the user portal — requests before 11pm can be completed as soon as the next business day

  2. 2

    Final Building Inspection

    Requires prior final approvals from Red White & Blue Fire District, Finance (if valuation over $100K), and — where sign-off was required at application — Upper Blue Sanitation District and Environmental Health, plus Planning/Engineering/Water/Streets if in the project workflow; certificate of completion issued via email

See the full Breckenridge inspection guide — scheduling & re-inspection fees →

Tips

  • A pure interior tenant finish with no square-footage change and no change of use skips the Planning Development Permit entirely — one of the faster paths in Breckenridge. Adding a change of use (retail to restaurant is the Town's own example) pulls in both a Class C Minor Development Permit (~3 weeks) and Upper Blue Sanitation District review, and restaurants add Summit County Environmental Health.
  • Downtown Main Street spaces frequently hold liquor licenses — any remodel or tenant finish where a liquor or marijuana license is present needs a Town Clerk's office sign-off before the building permit, a step unique to the commercial track.
  • Four separate sign-off entities can sit in front of a single TI permit (Fire District, Sanitation District, County Environmental Health, Town Clerk) — collect them before applying, since incomplete applications are rejected outright rather than held.
  • Fire District sign-off cannot be skipped for commercial work: unlike single-family remodels, ANY commercial remodel requires Red White & Blue review — there is no self-affidavit option for that entity on this track.
  • Exterior storefront changes in the Historic District (even repainting, in the Conservation District) are Planning Division territory under the Handbook of Design Standards — keep the building permit scope interior-only if schedule is critical.

Frequently asked questions

Breckenridge requires a commercial remodel / tenant finish permit for: Apply under the 'Commercial Construction – Remodel/Tenant Finish' application type via the online Access Portal (also the correct category for shared hot tubs at multi-unit buildings and hot tubs at lodges/resorts/hotels); All submittals require plans: stamped by a Colorado Licensed Structural Engineer if structural work is proposed; if no structural work, plans can be stamped by a Colorado Licensed Architect; All commercial remodels must complete the Permit Submittal Checklist; Red, White & Blue Fire District sign-off is required for ANY commercial remodel (separate entity with its own permits and inspections); Upper Blue Sanitation District sign-off required for remodels changing bed/bath count, changes of use (e.g., retail to restaurant), and commercial hot tubs, pools, and spas — otherwise upload the UBSD self-affidavit; Summit County Environmental Health sign-off required for food establishments, child care facilities, schools, tattoo/body art facilities, and shared or commercial hot tubs, spas, and pools — otherwise upload the self-affidavit; Town Clerk's office sign-off required for any commercial remodel or tenant finish where a liquor license or marijuana license is present — otherwise upload the Town Clerk self-affidavit; Asbestos test report required if disturbed materials meet State of Colorado trigger levels (self-affidavit otherwise); positive results require abatement by a Colorado certified General Abatement Contractor with a clearance report submitted to the Building Department; No Development Permit is needed for interior remodels with no changes to square footage (Planning Division's published exemption), but a change of use outside a residential district is a Class C Minor Development Permit (~3-week consent-calendar process), commercial additions under 1,000 sq ft are Class B Major (~7 weeks), and commercial additions over 1,000 sq ft are Class A (~7 weeks); additions require the approved Development Permit's Plan Case Number before building-permit submittal; Exterior changes in the Historic or Conservation District (including even paint color changes in the Conservation District, a Class D Minor permit) trigger Planning review against the Handbook of Design Standards for the Historic and Conservation Districts; Separate plumbing, electrical, and mechanical sub-permits referencing the building permit number; trade work only by Colorado state-licensed plumbers/electricians; Projects with valuation over $100,000 require Finance Department approval (Supplier Verification Form) before final building inspection; every contractor and subcontractor needs a Town of Breckenridge Business License; Window/exterior-door-only replacements and standalone deck work have their own streamlined application types — but if part of a larger remodel scope, everything goes under the single Remodel/Tenant Finish application. If your project isn't listed, confirm with Town of Breckenridge Community Development Department — Building Division at (970) 453-3180 before starting work.

In Breckenridge, the published Building Permit Fee (same valuation-based Building, Mechanical & Plumbing Fee Schedule as all building permits) is: $50.00 minimum, scaling per the valuation tiers (e.g., $1,169.55 at $100,000 valuation plus $6.73/$1,000 above). Additional published fees: Plan Review Fee — 65% of the Building Permit Fee; Change-of-use / added-square-footage exposure — Varies; Work commenced before permit issuance — 3x the calculated permit fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Breckenridge does not publish a plan-review timeline for this permit. Contact Town of Breckenridge Community Development Department — Building Division at (970) 453-3180 for current turnaround.

You'll need: Commercial Construction – Remodel/Tenant Finish application (Access Portal); Construction Plans (existing + proposed); Permit Submittal Checklist; Red, White & Blue Fire District sign-off; Upper Blue Sanitation District sign-off or self-affidavit; Summit County Environmental Health sign-off or self-affidavit; Town Clerk sign-off or self-affidavit; Asbestos Test Report or self-affidavit. See the required-documents checklist on this page for details on each.

Apply through Town of Breckenridge Community Development Department — Building Division at 150 Ski Hill Road, 2nd Floor, PO Box 168, Breckenridge, CO 80424. Phone: (970) 453-3180, email: building@townofbreckenridge.com. Office hours: Monday-Thursday 8:00am-5:00pm, Friday 8:00am-12:00pm; closed major holidays. Official information: https://www.townofbreckenridge.com/departments/community-development/building.

Yes. The Town's Access Portal has a dedicated 'Commercial Construction – Remodel/Tenant Finish' application type for work inside or mainly inside commercial buildings, with its own published bulletin. It uses the same valuation-based fee schedule as other building permits but carries commercial-specific sign-offs (Fire District always; Sanitation District, County Environmental Health, and Town Clerk depending on scope).

Not if it is an interior remodel with no change to square footage — the Planning Division's Development Permits page exempts those. A change of use outside a residential district requires a Class C Minor Development Permit (typically ~3 weeks), and commercial additions require Class B Major or Class A permits (typically ~7 weeks) with an approved Plan Case Number before the building permit can be submitted.

A retail-to-restaurant conversion is the Town's own example of a change of use: it triggers Upper Blue Sanitation District review, Summit County Environmental Health review (food establishment), a Class C Minor Development Permit from Planning, and a Town Clerk sign-off if a liquor license is involved — all in addition to the building permit and any plumbing/electrical/mechanical sub-permits.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Breckenridge.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.