Commercial Tenant Improvement Permit — Aurora, Colorado · Requirements sheet
Verified 2026-08-26 · Source: https://www.auroragov.org/business_services/building_division/permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Tenant Improvement Permit in Aurora, Colorado
Required for interior remodels and tenant improvements in existing commercial buildings in Aurora, ranging from minor non-structural alterations to extensive reconfigurations. Governed by the 2021 IBC with City of Aurora Amendments (Aurora City Code Chapter 22, Article IV, Sec. 22-131, Code adopted). Billed by IBC occupancy group on the same per-square-foot New Building Construction Fee Table used for new commercial construction, or via the Permit Fee Calculator.
Verified 2026-08-26 · Source
When you need this permit
- Interior remodel/reconfiguration of existing commercial space
- Ranges from minor non-structural alterations to extensive space reconfigurations
- Applications and payment available via Aurora4Biz.org or the AnyPayment online system
- Reviewed against the applicable IBC occupancy group (A, B, E, F, I, M, R-1, S, U) under Aurora's 2021 IBC amendments, adopted at Aurora City Code Chapter 22, Article IV, Sec. 22-131
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Aurora Permit Center, '2026 New Building Construction Fees' (Form A#176, revised 01/2026), Fee Table for Construction of New Buildings. Show full citationHide
City of Aurora Permit Center, '2026 New Building Construction Fees' (Form A#176, revised 01/2026), Fee Table for Construction of New Buildings. Hotels and motels are an R-1 occupancy on the City's table rather than one of the A/B/E/F/I/M/S/U groups, but the work is commercial and bills off the same table.Form #A176's own text states the per-square-foot fee is a one-time fee that 'covers the cost of city services like plan reviews, department referrals and permit issuance' — plan review is bundled… Show full citationHide
Form #A176's own text states the per-square-foot fee is a one-time fee that 'covers the cost of city services like plan reviews, department referrals and permit issuance' — plan review is bundled into the per-square-foot rate above rather than billed as a separate line or percentage. The Building Division's general Building Fees page (auroragov.org/business_services/building_division/building_fees) separately describes permit costs city-wide as consisting of 'permit fees, plan review fees and applicable city and county taxes,' varying with project complexity and valuation — confirm with the Building Division (303-739-7420) whether any project-specific plan review charge applies beyond the per-square-foot fee. The city collects use tax on materials cost separately from either fee.Review timeline
Inspection process
- 1
Framing / Structural
After framing complete before walls covered
- 2
MEP Rough-In
Mechanical, electrical, plumbing rough-in before walls closed
- 3
Final / Certificate of Occupancy
All work complete, life safety systems functional
See the full Aurora inspection guide — scheduling & re-inspection fees →
Tips
- Aurora's occupancy-group per-square-foot fee table (Form #A176) is the same one used for new commercial construction, applied to the tenant-improvement project's scope/area — use the Permit Fee Calculator or the occupancy-group rate directly from Form #A176 to estimate cost.
- Rates vary a lot by occupancy group — Assembly (bars/restaurants/theatres) is billed at $3.55/sq ft while Storage is 28 cents/sq ft — so confirm the IBC occupancy classification for the tenant space before estimating cost, and note that each occupancy group also carries its own minimum fee (e.g., $2,500 for Mercantile vs. $5,000 for Assembly, Business, Factory, and Institutional).
- The per-square-foot fee already bundles plan review, department referrals, and permit issuance into one payment per Form #A176 — there is no separate percentage-based plan review charge published for this permit type, though the city separately collects use tax on materials cost.
- Contact the Building Permit Center (303-739-7420 or permitcounter@auroragov.org) early for tenant improvement projects, since scope can range from minor cosmetic work to full reconfiguration with very different fee/timeline implications.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-26.
Fee schedules
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Aurora building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Aurora.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Aurora's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Aurora yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Aurora lands. Privacy.
Other permits in Aurora
Commercial Tenant Improvement Permit in other cities
Compare commercial tenant improvement permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Aurora project checklist
Describe your project once and get every permit, document, and fee it triggers in Aurora — in one checklist. Free, for any city and any number of projects.
Get started →