Aurora building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Aurora, Colorado.
Verified 2026-06-30 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 15151 E. Alameda Parkway, Ste. 2400, Aurora, CO 80012
- Phone
- (303) 739-7420
- Office hours
- Mon, Tue, Thu, Fri 7:30 a.m.–4:30 p.m.; Wed 8:30 a.m.–4:30 p.m.
- Website
- Official site
Published scheduling rules
- Inspection requests via aurora4biz.org, email, or phone — Aurora's own Building Division inspectors perform electrical inspections (not a third party or the state) (Electrical Permit)
- Inspection requests via aurora4biz.org, email, or phone (Plumbing Permit)
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation / Footings
Before concrete pour — footings must extend below 36-inch minimum frost depth
- 2
Framing
After framing complete, before insulation or wall cover
- 3
MEP Rough-In
Mechanical, electrical, and plumbing rough-in before walls closed
- 4
Insulation / Energy
Insulation and 2021 IECC compliance verification before drywall
- 5
Final
All work complete, ready for Certificate of Occupancy
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Foundation
Footings and foundation before concrete pour — 36-inch minimum frost depth
- 2
Framing
Structural framing per approved plans
- 3
MEP Rough-In
Mechanical, electrical, plumbing rough-ins before walls closed
- 4
Final
All work complete, ready for occupancy
Applies to: Residential Addition / Remodel Permit
- 1
Foundation (if new footings)
Before concrete pour — footings below 36-inch frost depth
- 2
Framing
After framing complete, before insulation or wall cover
- 3
MEP Rough-In
Electrical, plumbing, mechanical rough-in before walls closed
- 4
Final
All work complete per approved plans
Applies to: Commercial Tenant Improvement Permit
- 1
Framing / Structural
After framing complete before walls covered
- 2
MEP Rough-In
Mechanical, electrical, plumbing rough-in before walls closed
- 3
Final / Certificate of Occupancy
All work complete, life safety systems functional
Applies to: Deck / Covered Patio Permit
- 1
Footing (if applicable)
Before concrete pour for structural post footings — below 36-inch frost depth
- 2
Framing
Structural framing before decking/cover installed
- 3
Final
Structure complete per approved plans
Applies to: Demolition Permit
- 1
Pre-Demolition Utilities Verification
Verification that utilities are disconnected before demolition begins
- 2
Final
Site cleared, debris removed
Applies to: Electrical Permit
- 1
Rough-In
Wiring and conduit installed before walls closed
- 2
Final
All devices installed, panel labeled, system energized
Applies to: Mechanical / HVAC Permit
- 1
Rough-In / Equipment
Equipment installation and ductwork before walls closed
- 2
Final
Equipment operational, combustion air and venting verified
Applies to: Plumbing Permit
- 1
Rough-In
After pipes installed, before walls closed
- 2
Final
All fixtures connected, no leaks, proper venting verified
Applies to: Solar PV Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before cover
- 2
Final — Structural / Racking and Electrical
Panel mounting, racking attachment, roof penetration sealing, and electrical connections/interconnection verified
Final inspection only: EV Charger / EVSE Permit, Roofing Permit (Reroof)
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Aurora building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Aurora building permits
Get alerts for Aurora
We'll email you when Aurora's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.