Commercial Tenant Improvement / Alteration Permit (Commercial Alteration) — Cañon City, Colorado · Requirements sheet
Verified 2026-08-02 · Source: https://www.canoncity.org/DocumentCenter/View/3491/Commercial-Alterations-Packet-PDF
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Tenant Improvement / Alteration Permit (Commercial Alteration) in Cañon City, Colorado
Cañon City publishes a genuinely distinct packet for tenant improvements and alterations to existing commercial buildings: the 'Commercial Alterations Packet' (the City's own document title is 'COMMERCIAL ALTERATION' — the City does not use the phrase 'tenant improvement'). It is a substantially lighter submittal than the full Commercial Building Permit: only a Building Permit Application, Mechanical Permit Application, the Required Approvals Routing Sheet with the 'top portion filled out only,' and plans already 'Approved & Reviewed... by Shums Coda (commercial third-party plan reviewer)' — no site plan, warranty deed, surveyed ILC, water tap proof, or Development Site Plan items appear on the alterations list. Plan review still routes through the City's third-party commercial reviewer, and the same 1.0%-of-valuation City permit fee formula applies (no alteration-specific fee is published). Issued by the City of Cañon City Building Department; electrical and plumbing scopes are permitted separately by the State of Colorado (DORA).
Verified 2026-08-02 · Source
When you need this permit
- Per the Commercial Alterations Packet, provide exactly: (1) Building permit application, (2) Mechanical permit application, (3) Routing sheet top portion filled out only, and (4) Approved & Reviewed plans by Shums Coda (commercial third-party plan reviewer)
- Plans must first go through the third-party commercial plan review (submit electronically to plancheck@shumscoda.com, copying Building Official Kathy Ulsh at kulsh@canoncity.org; review fees paid directly to the reviewer under a signed fee schedule agreement) — the alterations packet requires the plans to arrive at the City already approved and stamped
- A pre-application meeting is encouraged for all commercial applications 'except minor interior changes,' per the Commercial Building Permit Process flowchart
- Reviewed under the 2018 IBC and 2018 IEBC (International Existing Building Code) as locally adopted, effective January 1, 2021
- Building Renovation asbestos requirements apply per CDPHE state/federal regulations: any renovation project requires inspection for asbestos by a Colorado-certified asbestos inspector before work begins (CDPHE Asbestos Compliance Assistance Group, 303-692-3100)
- Contractors must hold a current City of Cañon City Contractor License in addition to any Colorado state trade licensing Contractor
- Electrical and plumbing work within the tenant space is permitted and inspected by the State of Colorado (DORA), not the City
- A change that adds or alters mechanical/HVAC systems is covered by the Mechanical Permit Application included in this packet, with fees per the Mechanical Fee Schedule
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building Department Inspections Throughout Construction
Per the Commercial Building Permit Process flowchart, Building Department inspections occur throughout construction, coordinated with the owner or owner's representative; no alteration-specific inspection sequence is published. Inspections may be scheduled 24 hours a day at 719-276-5292
- 2
Final Inspection / Certificate of Occupancy
Per the Required Approvals Routing Sheet (included in the alterations packet): 'THE PROPERTY MAY NOT BE OCCUPIED UNTIL A FINAL INSPECTION IS DONE AND A CERTIFICATE OF OCCUPANCY IS ISSUED,' enforceable as a misdemeanor under Section 15.02.040 of the Cañon City Municipal Code. State of Colorado (DORA) electrical and plumbing finals are scheduled separately
See the full Cañon City inspection guide — scheduling & re-inspection fees →
Tips
- Sequence matters: for a tenant improvement, get your plans through Shums Coda review FIRST — the City's alterations packet expects 'Approved & Reviewed plans by Shums Coda' as a submittal item, not a post-application step, so the City-side permit issuance on an alteration can be quick once the third-party approval letter and stamped plans are in hand.
- The alterations track is deliberately lighter than new commercial construction: routing sheet 'top portion filled out only,' and none of the new-construction items (surveyed ILC, warranty deed, water tap proof, Development Site Plan, site plan checklist) appear on the alterations list — but scope changes that touch the site, occupancy, or utility services can pull a project back into the full commercial packet; confirm with the Building Department (719-276-5253) if your TI is more than interior work.
- There is no TI-specific fee discount or separate schedule — the same 1.0%-of-valuation formula applies, and interior finish contracts are natural candidates for the Construction Contract valuation method (contract value x 1.0%) rather than the BVD square-foot table.
- Any renovation of an existing commercial building triggers Colorado CDPHE asbestos inspection requirements before work begins, regardless of building age — budget for a Colorado-certified asbestos inspection as part of TI due diligence.
- Electrical and plumbing portions of a tenant improvement (new circuits, fixtures, break-room plumbing) are permitted and inspected by the State of Colorado (DORA), not the City — a TI in Cañon City runs City building/mechanical and State electrical/plumbing tracks in parallel.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-02.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cañon City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Cañon City.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Cañon City
Commercial Tenant Improvement / Alteration Permit (Commercial Alteration) in other cities
Look up this fee in a different city →
Now live
Build your Cañon City project checklist
Describe your project once and get every permit, document, and fee it triggers in Cañon City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →