Cañon City building inspections

Inspection sequence, scheduling, and re-inspection fees for building permits in Cañon City, Colorado.

Reviewed 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
128 Main Street, Cañon City, CO 81212
Phone
719-276-5253
Office hours
Monday through Friday, 7 a.m. to 4 p.m. (the building opens to the public at 8:00 a.m.; staff are available by phone only from 7-8 a.m.). Inspections may be scheduled 24 hours a day by calling 719.276.5292.

Inspection sequence

Applies to: Commercial Building Permit

  1. 1

    Survey Pinning / Setback Verification

    Prior to the first inspection, the property must be pinned by a Colorado-licensed surveyor and setbacks dimensioned and verified in the field, per the Commercial Packet's Submittal Checklist

  2. 2

    Building Department Inspections Throughout Construction

    Per the Commercial Building Permit Process flowchart: 'Inspections by the Building Dept will occur throughout construction, to be coordinated with the owner or owner's representative until project is complete.' A published stage-by-stage commercial inspection list is not posted; inspections may be scheduled 24 hours a day at 719-276-5292

  3. 3

    Engineering Department Final Sign-Off

    Per the Commercial Building Final Routing Sign-Off checklist: site graded for appropriate/adequate drainage, building foundation +1 ft of street, water meter installation appropriate & flush, right-of-way improvements (sidewalk, curb, gutter), Right-of-Way Permit issued/closed out/fees paid, and as-built site plan drawings

  4. 4

    Stormwater Department Final Sign-Off

    Per the same Final Routing Sign-Off checklist: site adequately stabilized to issue CO, GESC Permit (issued, current fees paid, pending close-out), Stormwater Maintenance Agreement, Floodplain Development Permit (issued, closed out, fees paid), and as-built site plan drawings

  5. 5

    Final Inspection and Certificate of Occupancy

    Routing Sheet approvals must be secured again prior to final/CO for commercial projects. Per the Routing Sheet: 'THE PROPERTY MAY NOT BE OCCUPIED UNTIL A FINAL INSPECTION IS DONE AND A CERTIFICATE OF OCCUPANCY IS ISSUED' — failure to comply can be cited as a misdemeanor under Section 15.02.040 of the Cañon City Municipal Code. Separate State of Colorado (DORA) electrical and plumbing final inspections are scheduled independently

Applies to: Residential Building Permit (New Single-Family Construction)

  1. 1

    Foundation

    Before concrete pour

  2. 2

    Rough Framing

    Structural framing complete before cover; includes verification of sealing of plates/penetrations, air barrier assemblies, and window sticker verification per energy code

  3. 3

    Insulation Inspection

    Insulation installation and vapor retarder verified before drywall cover

  4. 4

    Final Inspection

    All City-permitted work (building, mechanical) complete per approved plans; blower-door air-leakage test and posted energy certificate required before final; separate final electrical and plumbing inspections/sign-offs required from the State of Colorado (DORA) before occupancy

Applies to: Residential Addition / Remodel / Basement Finish Permit

  1. 1

    Rough Framing

    Framing complete and tied into existing structure before cover, if structural work is involved

  2. 2

    Insulation Inspection

    If insulation is being added or modified

  3. 3

    Final Inspection

    All City-permitted work complete per approved plans

Applies to: Commercial Tenant Improvement / Alteration Permit (Commercial Alteration)

  1. 1

    Building Department Inspections Throughout Construction

    Per the Commercial Building Permit Process flowchart, Building Department inspections occur throughout construction, coordinated with the owner or owner's representative; no alteration-specific inspection sequence is published. Inspections may be scheduled 24 hours a day at 719-276-5292

  2. 2

    Final Inspection / Certificate of Occupancy

    Per the Required Approvals Routing Sheet (included in the alterations packet): 'THE PROPERTY MAY NOT BE OCCUPIED UNTIL A FINAL INSPECTION IS DONE AND A CERTIFICATE OF OCCUPANCY IS ISSUED,' enforceable as a misdemeanor under Section 15.02.040 of the Cañon City Municipal Code. State of Colorado (DORA) electrical and plumbing finals are scheduled separately

Applies to: Fire Sprinkler / Fire Alarm System Permit

  1. 1

    Initial Inspection

    Covered by the base permit fee; fire sprinkler and underground piping permits are limited to three inspections per permit

  2. 2

    Final Inspection

    System operational and code-compliant; all fees must be paid in full prior to final sign-off

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, flues, and equipment placement before concealment

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

Re-inspection fees

Fire Sprinkler / Fire Alarm System PermitRe-inspection / Additional Inspections · One-hour minimum fee; subsequent time calculated in half-hour increments
$80.00 per hour

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cañon City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Cañon City building permits

Get alerts for Cañon City

We'll email you when Cañon City's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.