EV Charger / EVSE Permit in Cañon City, Colorado
Cañon City does not publish a standalone EV-charger/EVSE permit type. Installing electric vehicle charging equipment (e.g., a Level 2 charger circuit) is electrical work, and per the City's own Building Department and Building Permit Fees pages, ALL electrical permits and inspections in Cañon City — including EV charger circuits — are issued and scheduled by the State of Colorado Department of Regulatory Agencies (DORA), not the City, consistent with the City's general electrical-permit routing documented under this file's separate 'electrical-permit' entry. Colorado's HB24-1173 (Electric Vehicle Charging System Permits Act, effective August 7, 2024) required municipalities with population 10,000+ (Cañon City's 2024 Census estimate is approximately 17,100-17,200, over this threshold) to take one of three compliance actions by December 31, 2025: adopt the Colorado Energy Office's EV Charging Model Land Use Code, adopt a custom standardized/objective permitting process, or adopt an ordinance opting out and retaining existing codes. As of this review, no Cañon City ordinance, Building Department page, or fee schedule references HB24-1173 compliance, a distinct EV-charging permit process, or an opt-out resolution — checked the Building Department, Building Permit Fees, Application Forms, and FAQ pages directly.
Verified 2026-07-20 · Source
When you need this permit
- EV charger circuit installation (Level 2 or higher) is electrical work; apply directly through the State of Colorado DORA electrical program, not the City of Cañon City, per the City's general electrical-permit routing
- Simple Level 1 (120V, plug-in) charger use on an existing receptacle typically does not require a separate electrical permit under standard NEC practice; a new dedicated circuit or panel upgrade does
- No City-level or DORA-published EV-charger-specific application, checklist, or fee line item was found as of this review; the general State electrical permit application/process applies
- Electrical contractors must hold current Colorado Electrical Board (DORA) licensure
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
State Electrical Inspection
Scheduled directly with the State of Colorado (DORA) for the new EV charger circuit, independent of the City's building-permit inspection sequence
See the full Cañon City inspection guide — scheduling & re-inspection fees →
Tips
- Because Cañon City routes ALL electrical work to the State of Colorado (DORA), do not look to the City Building Department for an EV-charger-specific permit or fee — apply directly through DORA's electrical permitting program, the same authority that handles any new branch circuit.
- Cañon City's own public-facing pages show no evidence of adopting Colorado's HB24-1173 EV Charging Model Land Use Code, a custom streamlined process, or a formal opt-out — if you need certainty on which path the City took, contact the Building Department (719-276-5253) directly.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cañon City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cañon City
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Cañon City project checklist
Describe your project once and get every permit, document, and fee it triggers in Cañon City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →