EV Charger / EVSE Permit in Avon, Colorado

The Town of Avon does not manage electrical permits at all — per the Town's own 'Common Building Permit Types' guide, all electrical work 'goes through the Colorado Department of Regulatory Agencies' (DORA), confirmed by the Town's Fee Schedule footnote that 'Electrical Permits and Fees are administered by the Colorado Department of Regulatory Agencies.' A residential EV charger / EVSE installation is electrical work, so it follows this same state track rather than any Town of Avon permit or fee schedule; no EV-charger-specific fee line item was found anywhere in the Town's or DORA's published materials.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical work for an EV charger circuit in Avon requires a permit issued directly through the Colorado DORA Division of Professions and Occupations, State Electrical Board — NOT through the Town of Avon
  • Governed by the 2023 NEC as adopted by the Town for code-compliance purposes, but permitting/inspection authority sits with the state
  • No Town of Avon permit application or fee applies to the EV charger's electrical scope

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Filing fee
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Avon?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Avon inspection guide — scheduling & re-inspection fees →

    Tips

    • Do not apply for an EV charger electrical permit through the Town of Avon's Cloudpermit portal — it will not be processed there. Electrical permits and inspections in Avon go entirely through the Colorado DORA at dora.colorado.gov.
    • If the EV charger install is bundled with a larger building permit (new construction, remodel, solar PV), plan for a SEPARATE DORA electrical permit application and a separate DORA final electrical inspection — the Town's building permit does not cover the electrical trade at all.

    Frequently asked questions

    Avon requires an ev charger / evse permit for: Electrical work for an EV charger circuit in Avon requires a permit issued directly through the Colorado DORA Division of Professions and Occupations, State Electrical Board — NOT through the Town of Avon; Governed by the 2023 NEC as adopted by the Town for code-compliance purposes, but permitting/inspection authority sits with the state; No Town of Avon permit application or fee applies to the EV charger's electrical scope. If your project isn't listed, confirm with Town of Avon Community Development Department, Building Division at 970-748-4030 before starting work.

    Avon does not publish a plan-review timeline for this permit. Contact Town of Avon Community Development Department, Building Division at 970-748-4030 for current turnaround.

    You'll need: Colorado DORA Electrical Permit Application. See the required-documents checklist on this page for details on each.

    Apply through Town of Avon Community Development Department, Building Division at 100 Mikaela Way, P.O. Box 975, Avon, CO 81620. Phone: 970-748-4030, email: eblock@avon.org. Office hours: 8:00 a.m. - 5:00 p.m., Monday - Friday. Building Official Derek Place: dplace@avon.org, 970-748-4011. Building Inspector Matt Waldrop: mwaldrop@avon.org, 970-748-4098. Community Development Coordinator Emily Block: eblock@avon.org, 970-748-4012. Main Town line: 970-748-4000.. Official information: https://www.avon.org/151/Building.

    Avon, Colorado has adopted: 2021 International Building Code (IBC) — Town of Avon Adopted Building Codes page; 2021 International Residential Code (IRC); 2021 International Energy Conservation Code (IECC); 2021 International Plumbing Code (IPC); 2021 International Fuel Gas Code (IFGC); 2021 International Mechanical Code (IMC); 2021 International Fire Code (IFC), with additions and exceptions per the Eagle River Fire Protection District (ERFPD); 2021 International Swimming Pool and Spa Code; 2021 International Property Maintenance Code; 2021 International Wildland-Urban Interface Code; 2023 National Electrical Code (NEC) — administered by the Colorado Department of Regulatory Agencies (DORA), not the Town, per the Town's own 'Common Building Permit Types' document; ICC A117.1-2017 Standard for Accessible and Usable Buildings and Facilities; Note on code currency: Avon's adopted-codes list (2021 I-Codes cycle) is one cycle behind Vail's currently posted 2024 I-Codes list within the same county — confirmed directly against the Town's own Adopted Building Codes page as of this review; do not assume parity with Vail's code edition.. Local amendments apply — see the Avon overview page for the full list.

    No Town of Avon fee applies. Per the Town's own guidance, electrical permits — including an EV charger circuit — 'go through the Colorado Department of Regulatory Agencies,' not the Town, and no EV-specific state fee line item was found in this research.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-20.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Avon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.